| Plan Review Notes For Permit 16110558 |
| Permit Number |
16110558 |
|
| Review Stop |
FIRE |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2016-11-15 17:15:30 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | | INSPECTION. | | | | | | | | | 1) TEST INSTALLATION AT WORKING PRESSURE FOR 2 HOURS | | | PER NFPA 13. | | | | | | 24.2 ACCEPTANCE REQUIREMENTS. | | | 24.2.1* HYDROSTATIC TESTS. | | | 24.2.1.1 UNLESS PERMITTED BY 24.2.1.2 THROUGH 24.2.1.8, | | | ALL PIPING AND ATTACHED APPURTENANCES SUBJECTED TO | | | SYSTEM WORKING PRESSURE SHALL BE HYDROSTATICALLY TESTED | | | AT 200 PSI (13.8 BAR) AND SHALL MAINTAIN THAT PRESSURE | | | WITHOUT LOSS FOR 2 HOURS. | | | | | | 24.2.1.4 MODIFICATIONS AFFECTING 20 OR FEWER SPRINKLERS | | | SHALL NOT REQUIRE TESTING IN EXCESS OF SYSTEM WORKING | | | PRESSURE. | | | | | | 24.2.1.6 MODIFICATIONS THAT CANNOT BE ISOLATED, SUCH AS | | | RELOCATED DROPS, SHALL NOT REQUIRE TESTING IN EXCESS OF | | | SYSTEM WORKING PRESSURE. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|