| 2016-11-28 17:17:23 | PROVISOS: |
| | |
| | 1. ASPHALT CONSTRUCTION & STRIPING INCLUDES DRAINAGE |
| | SLOPES, DRAINAGE, PARKING, STRIPING, DENSITIES, NEW |
| | CURBS, A.D.A., CAR STOPS, PARKING COUNT, R.O.W. ACCESS, |
| | TRIPPING HAZARDS. |
| | (IF NEW CONSTRUCTION CERTIFICATION BY EOR FOR DESIGN, |
| | CONSTRUCTION AND COMPLETION.) |
| | 2. CONCRETE WORK AND CURB MAY INCLUDING A.D.A. |
| | 3. NEW STRIPING, CURB WORK, A.D.A. AND DRAINAGE |
| | STRUCTURAL DESIGN AND MAINTENANCE. |
| | 4. INSPECTIONS: |
| | EOR REPRESENTING THE DEVELOPER OR OWNER WILL INSPECT. |
| | 801 INSPECTION INCLUDES: |
| | NPDES ELEMENTS IN PLACE, REVIEW OF WORK SCOPE BUT NOT |
| | STRUCTURAL ASPECT OF CONSTRUCTION. |
| | 802 INSPECTION INCLUDES AKA FINAL: |
| | FINAL WALK THRU WITH EOR AND/OR CONTRACTOR. |
| | CLOSE OUT DOCUMENTS: |
| | LETTER OF COMPLETION, DENSITIES, PERMIT CLOSE-OUT |
| | FINAL WALK-THRU: |
| | PARKING COUNT, CURB INSPECTION, FINAL PAVING |
| | INSPECTION. |
| | INSPECTIONS WILL LOOK FOR RAVELING, CRACKS, UPHEAVAL, |
| | POTHOLES, GRADE DEPRESSIONS. SITE MUST CONFORM TO |
| | DEPARTMENT OF JUSTICE ADA STANDARDS FOR ACCESSIBLE |
| | DESIGN (HTTP://WWW.ADA.GOV/2010ADASTANDARDS_INDEX.HTM) |
| | 5. CONTRACTOR MUST FOLLOW: HTTP://WWW.PBCO-NPDES.ORG/ |
| | TO COMPLY WITH CITY CODE 94-450. |
| | 6. ALL TRAFFIC CONTROLS AND MARKING SHALL CONFORM TO |
| | MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. CITY HIGHLY |
| | RECOMMENDS THE USE OF THERMOPLASTIC STRIPING. |
| | |
| | |
| | |