| 2016-12-27 08:49:02 | 2ND REVIEW FBC-2014 MECHANICAL |
| | PERMIT #16110180 |
| | 12/27/16 |
| | |
| | 1) THE REQUESTED EXHAUST FAN SCHEDULES AND EXHAUST |
| | VENTILATION CALCULATIONS WERE NOT PROVIDED. |
| | |
| | 2) THE REQUESTED EXHAUST DUCT DETAILS- TYPES AND SIZES |
| | OF DUCTS AND TERMINATION LOCATIONS WERE NOT PROVIDED. |
| | |
| | 3) THE REQUESTED AC CALCULATIONS MUST BEAR TRHE SHOP |
| | DRAWING APPROVAL STAMP AND SIGNATURE OF THE DESIGN |
| | PROFESSIONAL OF RECORD. |
| | |
| | 4) THE REQUESTED ENERGY COMPLIANCE SUBMITTAL WAS |
| | SUBMITTED WITHOUT THE PRINTED OR SIGNED NAMES OF THE |
| | DESIGN PROFESSIONALS OR THE OWNER/AGENT- SEE PAGE 3. |
| | |
| | 5) THE REQUESTED ENERGY COMPLIANCE SUBMITTAL WAS |
| | SUBMITTED WITHOUT THE MANDATORY REQUIREMENTS CHECKLIST |
| | COMPLETED- SEE PAGE 8. |
| | |
| | 6) THE ENERGY COMPLIANCE SUBMITTAL INCORRECTLY LISTS |
| | TWO 5-TON AC SYSTEMS AT 16 SEER, HOWEVER ONLY THE NEW |
| | SYSTEM IS 16 SEER. |
| | |
| | 7) THE REQUESTED AIR BALANCE CALCULATION WAS NOT |
| | PROVIDED. |
| | |
| | 8) THE REQUESTED WIND LOAD ENGINEERING AND STRUCTURAL |
| | DETAILS FOR THE CU AND CU PAD WERE NOT PROVIDED. |
| | |
| | 9) THE EQUIPMENT SCHEDULE FOR THE NEW 5-TON AC |
| | INCORRECTLY LISTS THE WEIGHT AT 9.7 LBS. |
| | |
| | 10) DUCT SMOKE DETECTORS ARE REQUIRED IN THE RETURN AIR |
| | SYSTEMS OF THE NEW AND EXISTING 5-TON AC SYSTEMS, |
| | UNLESS MANUFACTURER'S SPECIFICATIONS INDICATE THE UNITS |
| | ARE INCAPABLE OF PRODUCING OVER 2000 CFMS OF SUPPLY |
| | AIR- SECTION 606.2.1. |
| | |
| | 11) PROVIDE AN AIR DEVICE SCHEDULE. |
| | |
| | 12) NEW DRYER: REFER TO SECTION 504 AND PROVIDE A) |
| | MANFACTURER'S SPECIFICATIONS FOR THE DRYER. B) EXHAUST |
| | DUCT DETAILS INCLUDING THE DUCT RUN AND DUCT |
| | TERMINATION. C) MAKEUP AIR DETAILS- SEE SECTION 504.5. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |