| 2017-02-10 12:49:40 | ****CORRECTIONS**** |
| | |
| | SAMANTHA HILL |
| | BUILDING PLANS EXAMINER |
| | [email protected] |
| | 561-805-6724 |
| | |
| | FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014) |
| | FBC B = FBC BUILDING |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | |
| | 4. PROVIDE A COPY OF THE CONTRACT FOR THIS JOB, |
| | INCLUDING A COST BREAKDOWN, FBC 109. |
| | |
| | 20. PROVIDE A COPY OF THE SURVEY FOR THIS PROPERTY, FBC |
| | 107. THE SURVEY SHOULD INCLUDE ALL GRADE LEVEL |
| | MECHANICAL EQUIPMENT LOCATED OUTSIDE OF THE BUILDING. |
| | (TWO SETS REQUIRED) |
| | |
| | PROVISO ITEMS: |
| | |
| | FIRE SPRINKLER UNDERGROUND AND FIRE SPRINKLER PERMIT |
| | APPLICATIONS WITH PLANS ARE TO BE SUBMITTED PRIOR TO |
| | FIRST INSPECTION AS PLANS WERE NOT PROVIDED WITH THE |
| | BUILDING PERMIT AS REQUESTED. |
| | |
| | FIRE ALARM PERMIT IS REQUIRED |
| | |
| | A SEPARATE ROOF PERMIT REQUIRED. THE ASSEMBLY PROPOSED |
| | AND ENGINEERING IF REQUIRED ARE TO BE SUBMITTED PRIOR |
| | TO COMMENCEMENT OF ROOF WORK. |
| | |
| | PRODUCT APPROVALS FOR COMPONENTS AND CLADDING WHICH ARE |
| | REQUIRED BUT NOT SUBMITTED AND REVIEWED PRIOR TO PERMIT |
| | ISSUANCE (FOR INSTANCE, THE BILCO ROOF HATCH, THE STEEL |
| | EXTERIOR DOOR) ARE REQUIRED TO BE SUBMITTED AND |
| | REVIEWED AS A REVISION PRIOR TO INSTALLATION. |
| | |
| | SEPARATE PERMITS REQUIRED FOR SIGNS, MONUMENT SIGNS, |
| | DUMPSTER ENCLOSURE, FENCING, SITE LIGHTING, GENERATOR |
| | |
| | COMPLIANCE WITH FBC 1006 (MEANS OF EGRESS ILLUMINATION) |
| | REQUIRED FROM EXIT DISCHARGE TO THE PUBLIC WAY. THIS IS |
| | TO BE VERIFIED IN THE FIELD BUT IS THE RESPONSIBILITY |
| | OF THE CONTRACTOR AND OWNER. |
| | |
| | SHEET E4.0 INCLUDES A GENERATOR ANCHORING DETAIL. |
| | REVISE TO INCLUDE WIND DESIGN CRITERIA FBC 1604.3.1. |
| | THIS MAY BE DONE WITH A LETTER AND PROVIDED AT |
| | INSPECTION. |
| | |
| | |