| 2016-12-29 14:46:51 | ****CORRECTIONS**** |
| | |
| | SAMANTHA HILL |
| | BUILDING PLANS EXAMINER |
| | [email protected] |
| | 561-805-6724 |
| | |
| | FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014) |
| | FBC B = FBC BUILDING |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | |
| | IMMEDIATE ACTIONS RECOMMENDED FOR PRELIMINARY REVIEW AS |
| | NOT ENOUGH INFORMATION HAS BEEN PROVIDED FOR A COMPLETE |
| | REVIEW: |
| | PROVIDE FIRE SPRINKLER INFORMATION (HYDRAULIC CALCS, |
| | SYSTEM DESIGN INFO) AND VALUE VIA EMAIL. |
| | PROVIDE ELEVATION CERTIFICATE VIA EMAIL. |
| | |
| | 12/29 SPRINKLER INFORMATION, SURVEY, SOILS REPORT |
| | RECEIVED VIA EMAIL; A COURTESY REVIEW WILL BE DONE |
| | AFTER FFE INFORMATION IS RECEIVED |
| | |
| | 1. OK |
| | |
| | 2. FROM PREVIOUS LIST: |
| | |
| | IF SPRINKLERS ARE PROPOSED, PROVIDE FIRE SPRINKLER |
| | DESIGN DOCUMENTS AS REQUIRED BY FBC 107.3.5 (5). IS THE |
| | EXISTING WATER SERVICE ADEQUATE FOR A NEW SPRINKLER |
| | SYSTEM, OR WILL A NEW UNDERGROUND LINE BE REQUIRED? |
| | |
| | 2ND REVIEW, THE PLAN HAS A NOTE: SEE FIRE SPRINKLER |
| | PERMIT DRAWINGS UNDER SEPARATE SUBMITTAL. THE FIRE |
| | SPRINKLER INFORMATION HAS NOT BEEN SUBMITTED AT THIS |
| | TIME. |
| | |
| | IF THE SUBMITTAL IS SEPARATE, IT WILL BE DIFFICULT FOR |
| | BUILDING TO REVIEW AND MAY CAUSE PERMIT DELAYS. IT IS |
| | RECOMMENDED TO INCLUDE THE REQUESTED INFORMATION IN THE |
| | RESUBMITTAL. |
| | |
| | FIRE SPRINKLER INFORMATION IS REQUIRED TO SHOW |
| | COMPLIANCE FOR THE REQUIREMENTS OF CHANGE OF OCCUPANCY |
| | FROM BUSINESS TO INSTITUTIONAL. A NOTE DOES NOT APPEAR |
| | TO BE ADEQUATE WITHOUT ADDITIONAL INFORMATION. IS IT |
| | KNOWN AT THIS POINT WHAT IS INVOLVED TO INSTALL A NEW |
| | SYSTEM (SCOPE OF WORK AND COST)? ARE DESIGN DOCUMENTS |
| | CURRENTLY IN DEVELOPMENT, AND IF NOT, WHY NOT? I DO NOT |
| | HAVE ENOUGH INFORMATION TO DETERMINE WHETHER THIS ITEM |
| | IS KNOWN BY ALL PARTIES AND IS BEING WORKED ON BUT NOT |
| | AVAILABLE, OR IF THIS REQUIREMENT HAS NOT BEEN FULLY |
| | CONSIDERED. A PROVISO IS POSSIBLE WITH ADDITIONAL |
| | INFORMATION. |
| | |
| | THE SPRINKLER INFORMATION IS ALSO REQUIRED FOR |
| | SUBSTANTIAL IMPROVEMENT DETERMINATION. FOR A POST FIRM |
| | BUILDING, LATERAL ADDITION SUBSTANTIAL IMPROVEMENT IS |
| | REQUIRED TO COMPLY (FBC 1612). PLANS SHOW ELEVATION AT |
| | FINISHED FLOOR AS 0. NO INFORMATION REGARDING THE |
| | EXISTING ELEVATION. PROPOSED ADDITION ELEVATION APPEARS |
| | TO MATCH EXISTING, BUT THE EXISTING FFE HAS NOT BEEN |
| | PROVIDED. THIS APPEARS TO BE A SUBSTANTIAL IMPROVEMENT, |
| | POST FIRM, LATERAL ADDITION. THE FINISHED FLOOR |
| | ELEVATION IS REQUIRED TO DETERMINE WHAT, IF ANY, |
| | REQUIREMENTS APPLY. |
| | |
| | IT IS POSSIBLE (LIKELY) THAT AN ENGINEERING REVIEW IS |
| | ALSO REQUIRED. HAS A SEPARATE ENGINEERING PERMIT BEEN |
| | APPLIED FOR? AT THIS TIME NOT ENOUGH INFORMATION HAS |
| | BEEN PROVIDED TO DETERMINE THE REVIEWS REQUIRED. IS A |
| | NEW CONNECTION INTO THE CITY SYSTEM REQUIRED? IF YES, |
| | AN ENGINEERING REVIEW IS REQUIRED FOR THIS PERMIT. NO |
| | CIVIL SHEETS WERE SUBMITTED. |
| | |
| | AT A MINIMUM, PROVIDE HYDRAULIC CALCS (OR OTHER |
| | RELIABLE INFORMATION WHICH DEMONSTRATES HOW BASIC |
| | DESIGN INFORMATION WAS DETERMINED), BASIC INFORMATION |
| | REGARDING THE PROPOSED SYSTEM (IS A FIRE PUMP OR NEW |
| | UNDERGROUND LINE REQUIRED? NEW CONNECTION TO CITY |
| | SYSTEM?), AND THE VALUE OF THE PROPOSED SYSTEM. |
| | TYPICALLY A SPRINKLER HEAD LAYOUT IS ALSO REQUIRED. IT |
| | IS POSSIBLE THAT THE HEAD LAYOUT PLAN MAY BE DEFERRED |
| | UPON RECEIPT OF BASIC INFORMATION REGARDING THE |
| | PROPOSED FIRE SPRINKLER SYSTEM. FBC 107.3.5(5), FBC B |
| | 1612. |
| | |
| | 3. OK |
| | |
| | 4. PROVIDE A COPY OF THE CONTRACT FOR THIS JOB, |
| | INCLUDING A COST BREAKDOWN, FBC 109. |
| | |
| | NOT ADDRESSED. ALSO REQUIRED FOR FBC B 1612, NFIP |
| | SUBSTANTIAL IMPROVEMENT DETERMINATION. |
| | |
| | 5-16. OK |
| | |
| | 17. SHEET LS1.1 INDICATES THAT A NEW FIRE ALARM SYSTEM |
| | IS PROPOSED. I WAS UNABLE TO LOCATE THIS ON THE |
| | ELECTRICAL SHEETS. PLEASE ADVISE AS TO WHERE THIS |
| | INFORMATION CAN BE LOCATED. AS THE VALUE IS PROVIDED |
| | WITH THE FIRE ALARM PERMIT, PROVIDE THE VALUE AT THIS |
| | TIME SO IT CAN BE INCLUDED IN THE PROJECT COST, FBC B |
| | 1612. |
| | |
| | 18-20. OK |
| | |
| | 19. PROVIDE A GEOTECHNICAL REPORT, FBC 1803.2. |
| | STRUCTURAL ENGINEER IS TO REVIEW THE REPORT PRIOR TO |
| | RESUBMITTAL. |
| | |
| | THIS WAS REQUESTED TO BE A PROVISO. SINCE THE |
| | FOUNDATION DESIGN SHOULD BE CONFIRMED IS ADEQUATE, AND |
| | THIS PARCEL IS IN A KNOWN POOR SOILS AREA, THE REPORT |
| | IS REQUIRED. |
| | |
| | 20. PROVIDE A COPY OF THE SURVEY FOR THIS PROPERTY, FBC |
| | 107. THE SURVEY SHOULD INCLUDE ALL GRADE LEVEL |
| | MECHANICAL EQUIPMENT LOCATED OUTSIDE OF THE BUILDING. |
| | |
| | 21. THIS PARCEL IS LOCATED IN A SPECIAL FLOOD HAZARD |
| | AREA (120229 0015B, FLOOD ZONE A8, BFE 16'). REVISE THE |
| | PLAN TO SHOW THE EXISTING FLOOR ELEVATION, PROPOSED |
| | FLOOR ELEVATION, AND ELEVATION OF ALL PROPOSED |
| | EQUIPMENT. THE MINIMUM DFE REQUIRED (BFE 16' + 1' |
| | FREEBOARD CITY OF WEST PALM BEACH MUNICIPAL CODE 94-541 |
| | THROUGH 94-547). SEE ALSO NFIP REVIEW. |
| | |
| | 22. INFORMATION REGARDING THE TOTAL VALUE OF THE |
| | PROJECT IS REQUIRED AT THIS TIME. IF IT IS AGREED THAT |
| | ITEMS SUCH AS FIRE SPRINKLER AND FIRE ALARM MAY BE |
| | SUBMITTED LATER, THE VALUE OF SUCH ITEMS IS REQUIRED AT |
| | THIS TIME SO THAT A SUBSTANTIAL IMPROVEMENT |
| | DETERMINATION CAN BE MADE, FBC 1612. |
| | |
| | 2ND REVIEW, IT APPEARS THAT THIS IS A POST FIRM |
| | SUBSTANTIAL IMPROVEMENT LATERAL ADDITION. ADDITION IS |
| | REQUIRED TO COMPLY; BUILDING IS REQUIRED TO COMPLY. |
| | PROVIDE THE ELEVATIONS FOR THE EXISTING BUILDING. THIS |
| | MAY BE PROVIDED VIA EMAIL. A COURTESY REVIEW WILL BE |
| | PERFORMED AFTER RECEIVING THIS INFORMATION. |
| | |
| | 23. A COMPLETE REVIEW CANNOT BE DONE AT THIS TIME UNTIL |
| | THE INFORMATION REGARDING VALUE AND EXISTING BUILDING |
| | ELEVATION IS PROVIDED. PLEASE PROVIDE THIS INFORMATION |
| | VIA EMAIL. IF AN ELEVATION CERTIFICATE IS AVAILABLE, |
| | SEND VIA EMAIL. |
| | |
| | 24. PROVISO ITEMS: |
| | |
| | A SEPARATE ROOF PERMIT REQUIRED. THE ASSEMBLY PROPOSED |
| | AND ENGINEERING IF REQUIRED ARE TO BE SUBMITTED PRIOR |
| | TO COMMENCEMENT OF ROOF WORK. |
| | |
| | PRODUCT APPROVALS FOR COMPONENTS AND CLADDING WHICH ARE |
| | REQUIRED BUT NOT SUBMITTED AND REVIEWED PRIOR TO PERMIT |
| | ISSUANCE (FOR INSTANCE, THE BILCO ROOF HATCH, THE STEEL |
| | EXTERIOR DOOR) ARE REQUIRED TO BE SUBMITTED AND |
| | REVIEWED AS A REVISION PRIOR TO INSTALLATION. |
| | |
| | SEPARATE PERMITS REQUIRED FOR SIGNS, MONUMENT SIGNS, |
| | DUMPSTER ENCLOSURE, FENCING, SITE LIGHTING, GENERATOR |
| | |
| | SITE LIGHTING IS REQUIRED TO COMPLY WITH FBC 1006 |
| | (MEANS OF EGRESS ILLUMINATION). |
| | |
| | SHEET E4.0 INCLUDES A GENERATOR ANCHORING DETAIL. |
| | REVISE TO INCLUDE WIND DESIGN CRITERIA FBC 1604.3.1. |
| | THIS MAY BE DONE WITH A LETTER AND PROVIDED AT |
| | INSPECTION. |
| | |
| | FBC ACCESSIBILITY 805.3, A CLEAR FLOOR SPACE COMPLYING |
| | WITH 305 SHALL BE PROVIDED ON EACH SIDE OF THE BED. THE |
| | CLEAR FLOOR SPACE SHALL BE POSITIONED FOR PARALLEL |
| | APPROACH TO THE SIDE OF THE BED. |
| | |
| | ACCESSIBLE SHOWERS TO COMPLY WITH FBC ACCESSIBILITY |
| | 607. |
| | |
| | |