 REVIEW COMMENTS
  
 1ST REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY MECHANICAL
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SUBMIT TWO SETS OF ENERGY COMPLIANCE FORMS WITH
 CALCULATION DATA. THERE WERE THREE OF THESE SUBMITTED
 AND THE ONLY ONE THAT WAS SIGNED BY THE PREPARER AND
 THE OWNER/AGENT WAS DIFFERENT FROM THE OTHER TWO. THE
 ORIENTATION OF THE DWELLING IS INCORRECT ON ALL OF THEM
 ( THE FRONT DOOR FACES EAST ). IN ORDER TO TAKE THE
 CEILING FAN CREDIT THE FANS ARE REQUIRED TO BE SIZED
 ACCORDING TO TABLE R405.7.6 AND THE SIZES SPECIFIED ON
 THE PLANS. ALL OF THE ENERGY FORM INFORMATION IS
 REQUIRED TO MATCH THE PLANS. FBC ENERGY CONSERVATION -
 SECT. 103.1.1.2 CODE COMPLIANCE CERTIFICATION. THE
 BUILDING?S OWNER, THE OWNER'S ARCHITECT, OR OTHER
 AUTHORIZED AGENT LEGALLY DESIGNATED BY THE OWNER SHALL
 CERTIFY THAT THE BUILDING IS IN COMPLIANCE WITH THE
 CODE, AS PER SECTION 553.907, FLORIDA STATUTES, PRIOR
 TO RECEIVING THE PERMIT TO BEGIN CONSTRUCTION OR
 RENOVATION.
  
 2) SUBMIT TWO SETS OF EQUIPMENT SIZING CALCULATIONS.
 THE ENERGY COMPLIANCE FORMS AND THE EQUIPMENT SCHEDULE
 ON THE MECHANICAL PLANS ARE REQUIRES TO MATCH THE
 EQUIPMENT SIZING CALCULATIONS. FBC ENERGY CONSERVATION
 - SECT. 403.6.1 EQUIPMENT SIZING. HEATING AND COOLING
 EQUIPMENT SHALL BE SIZED IN ACCORDANCE WITH ACCA MANUAL
 S BASED ON THE EQUIPMENT LOADS CALCULATED IN ACCORDANCE
 WITH MANUAL J OR OTHER APPROVED HEATING AND COOLING
 CALCULATION METHODOLOGIES, BASED ON BUILDING LOADS FOR
 THE DIRECTIONAL ORIENTATION OF THE BUILDING. THE
 MANUFACTURER AND MODEL NUMBER OF THE OUTDOOR AND INDOOR
 UNITS (IF SPLIT SYSTEM) SHALL BE SUBMITTED ALONG WITH
 THE SENSIBLE AND TOTAL COOLING CAPACITIES AT THE DESIGN
 CONDITIONS DESCRIBED IN SECTION 302.1. THIS CODE DOES
 NOT ALLOW DESIGNER SAFETY FACTORS, PROVISIONS FOR
 FUTURE EXPANSION OR OTHER FACTORS WHICH AFFECT
 EQUIPMENT SIZING. SYSTEM SIZING CALCULATIONS SHALL NOT
 INCLUDE LOADS CREATED BY LOCAL INTERMITTENT MECHANICAL
 VENTILATION SUCH AS STANDARD KITCHEN AND BATHROOM
 EXHAUST SYSTEMS.
  
  
  