| Date |
Text |
| 2016-12-19 16:39:57 | DECEMBER 19, 2016 |
| | |
| | PASSED WITH THE FOLLOWING PROVISO: |
| | |
| | 1. CONSTRUCTION COORDINATION WILL BE REQUIRED WITH |
| | CITY'S TRAFFIC GROUP FOR PROPER STRIPING, SIGNAGE AND |
| | SIGNALIZATION. THIS SHALL BE PERFORMED UNDER SEPARATE |
| | RIGHT-OF-WAY PERMIT APPLICATION. RIGHT-OF-WAY PERMIT |
| | APPLICATION CAN BE DOWNLOADED FROM THE FOLLOWING LINK: |
| | |
| | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR |
| | MS,-PERMITS-APPLICATIONS |
| | |
| | 2. UTILITY CONNECTION WORK ON CHARLOTTE AVE. SHALL |
| | REQUIRE SUBMISSION OF A RIGHT-OF-WAY PERMIT AND A |
| | PRE-CONSTRUCTION MEETING SHALL |
| | BE ARRANGED WITH THE CITY OF WEST PALM BEACH |
| | ENGINEERING SERVICES DEPARTMENT SO THAT A CONSTRUCTION |
| | COORDINATOR CAN BE ASSIGNED; |
| | |
| | 3. WATER METER AND CONTROL VALVE SHALL BE INSTALLED IN |
| | THE CITY'S RIGHT-OF-WAY AS SHOWN ON THE CITY'S STANDARD |
| | DETAILS; |
| | |
| | 4. LOCATION OF THE SANITARY SEWER CLEANOUT SHALL BE PER |
| | THE CITY'S STANDARD DETAI GS-6; |
| | |
| | 5. CONTRACTOR SHALL IDENTIFY/VERIFY ALL UTILITY |
| | CROSSINGS AND IF THERE IS A CONFLICT CONTACT THE CITY |
| | OF WEST PALM BEACH UTILITY ENGINEER; |
| | |
| | 6. WATER PIPE SHALL BE D.I.P. AND SANITARY SEWER PIPES |
| | SHALL BE SDR-26; |
| | |
| | 7. SEPARATION REQUIREMENTS FOR WATER, SANITARY OR STORM |
| | SEWER SHALL BE PER 62-555.314 F.A.C. ACCORDING TO WHICH |
| | A HORIZONTAL DISTANCE OF TEN FEET IS PREFERRED BETWEEN |
| | THESE UTILITY LINES; |
| | |
| | 8. AS OF DECEMBER 20, 2015 THE CITY OF WEST PALM BEACH |
| | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, |
| | MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD |
| | FREE." FOR MORE INFORMATION REFER TO THE LINK BELOW: |
| | |
| | HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI |
| | CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL |
| | |
| | 9. FOR SANITATION/GARBAGE PICKUP COORDINATE WITH CITY'S |
| | SANITATION DEPARTMENT AT: (561) 822-2075 EXT: 2076; |
| | EMAIL: [email protected] |
| | |
| | SENT TO FIRE FOR THEIR REVIEW. |
| | |
| | JANUARY 9, 2017 |
| | |
| | FOLLOWING COMMENTS HAVE BEEN ADDRESSED: |
| | |
| | #3, #4, #6, #7. |
| | |
| | PLANS APPROVED WITH 'PROVISO' AS NOTED ON THE PLANS ON |
| | JANUARY 9, 2017. |