| 2016-10-20 09:34:05 | 1) SUBMIT TWO COPIES OF THE SIZING TABLES USED IN THE |
| | DESIGN FOR THIS GAS SYSTEM OR PLACE A NOTE ON BOTH SETS |
| | OF PLANS LISTING THE SIZING TABLES FROM THE GAS CODE |
| | THAT WERE USED IN THE DESIGN OF THIS SYSTEM. FGC |
| | SEC.402.3, FBCR SEC. G 2413.3. |
| | 2) SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE |
| | LENGTH OF ALL CUT SECTIONS OF PIPE PER 2014 FBC-FUEL |
| | GAS, SECS. 402.4.1, 402.4.2. OR 2014 FBC-RES SEC. |
| | G2413. |
| | 3) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL |
| | PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE |
| | CORRUGATED STAINLESS STEEL TUBING (IF APPLICABLE) FOR |
| | EACH PIPE SIZE. WPB AMENDMENTS TO FBC SEC.107.2.1. |
| | 4)SHOW THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL BTU |
| | LOAD ON THE SYSTEM. REFER TO THE 2014 FBC-FUEL GAS |
| | SECS.401.8 THRU 402.6.1 AND TABLES 402.4 (1) THRU 402.4 |
| | (37) OR 2014 FBC-RES. SEC. G2413. |
| | 5) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, |
| | (REGULATOR / LP TANK) TO THE MOST REMOTE OUTLET IN THE |
| | BUILDING AND / OR SYSTEM PER THE 2014 FBC-FUEL GAS |
| | SEC.402.4.1 OR 2014 FBC-RES. SEC. G 2413.3. |
| | 6) SUBMIT A FLOOR PLAN SHOWING THE LOCATION OF ALL THE |
| | GAS APPLIANCES. WPB AMEND. TO FBC SEC. 107.2.1. |
| | 7) THE PROPOSAL FROM APS REFERS TO THE INSTALLATION OF |
| | A COOKTOP/RANGE AND A TANKLESS WATER HEATER IN ADDITION |
| | TO THE GENERATOR AND THE BBQ. THIS INFO IS NOT ON THE |
| | APPLICATION AND THESE APPLIANCES ARE NOT SHOWN ON THE |
| | PLANS. |
| | 8) SUBMIT A GAS RISER THAT SHOWS ALL OF THE GAS |
| | APPLIANCES/EQUIPMENT ON THE RISER. WPB AMEND. TO FBC |
| | SEC. 107.2.1. |
| | 9) SHOW THE DISTANCE OF THE LP TANK FROM THE PROPERTY |
| | LINE. |
| | 10) SHOW THE SIZE AND TYPE OF PIPE/TUBING FROM THE LP |
| | TANK TO THE FIRST STAGE REGULATOR. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |