| Plan Review Notes For Permit 16100185 |
| Permit Number |
16100185 |
|
| Review Stop |
M |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2016-11-22 14:45:31 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC FIFTH EDITION (2014) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY MECHANICAL | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) THE WALLS OF THE STRUCTURE ARE NOT CLEARLY VISIBLE | | | ON THE HVAC PLAN. FBC 107.2.1 | | | | | | 2) THE EQUIPMENT SCHEDULE ON SHEET M-1 DOES NOT MATCH | | | THE ENERGY FORM OR LOAD CALCULATIONS. THE EER AND SEER | | | ARE DIFFERENT AND THE MODEL NUMBER FOR THE AHU IS | | | DIFFERENT. | | | | | | 3) ONLY ONE COPY OF THE ENERGY AND LOAD CALCULATIONS | | | WERE SUBMITTED. TWO SETS ARE REQUIRED. FBC 107.1 | | | | | | 4) THE OWNER / AGENT IS REQUIRED TO SIGN AND DATE THE | | | ENERGY FORM R405-2014. | | | | | | 5) PROVIDE AN EQUIPMENT ANCHORING DETAIL FOR THE | | | MECHANICAL EQUIPMENT THAT IS LOCATED ON THE EXTERIOR OF | | | THE STRUCTURE.FBC- M301.15 | | | | | | 5) THE AC EQUIPMENT SCHEDULE SPECIFIES THAT THE AIR | | | HANDLER IS LOCATED IN A UTILITY CLOSET AND THE HVAC | | | PLAN SHOWS IT MOUNTED HORIZONTALLY IN THE ATTIC. REVISE | | | AS NECESSARY AND SHOW THE LOCATION OF THE A/H ON THE | | | ARCHITECTURAL PLANS, AS WELL AS, THE HVAC PLANS. FBC | | | 107.2.1 | | | | | | 6) FBC 107.2.1 - INFORMATION ON CONSTRUCTION DOCUMENTS. | | | THE MECHANICAL PLANS SHALL BEAR THE NAME AND SIGNATURE | | | OF THE PERSON RESPONSIBLE FOR THE DESIGN. | | | | | | | | | | | | |
|