| Notes |
| Date |
Text |
| 2016-10-13 12:13:17 | 1ST REVIEW FBC-2014 MECHANICAL | | | PERMIT #16100063 | | | 10/13/16 | | | | | | 1) SHEET M2: THE VENTILATION RATE FOR THE STOCK AND | | | PREPARATION ROOM SHALL BE CALCULATED AT- (10 PERSONS | | | PER 1000 SQ. FT.) AT (5 CFM PER PERSON) AND (0.18 CFMS | | | PER SQ. FT.). PLEASE CORRECT THE FRESH AIR CALCULATION. | | | | | | 2) THE FUTURE CLEAN ROOM CANNOT BE PERMITTED UNDER THIS | | | APPLICATION WITHOUT MORE SPECIFIC INFORMATION TO | | | CLARIFY THE PROCESSES THAT WILL BE CONDUCTED IN THE | | | ROOM; WHAT EQUIPMENT WILL BE IN THE ROOM, WHAT | | | MATERIALS WILL BE STORED IN THE ROOM, HOW PARTICLE | | | CONCENTRATION AND ENVIRONMENTAL CONDITIONS WILL BE | | | CONTROLLED, AND HOW CROSS-CONTAMINATION WILL BE | | | PREVENTED ETC. THE CURRENT LAYOUT PLAN SHOWS AIR | | | COMMUNICATING FROM OTHER SPACES INTO THE CLEAN ROOM AND | | | VICE-VERSA WHICH MAY BE PROHIBITED PER FDA OR OTHER | | | REGULATORY GUIDELINES. VERY TYPICALLY HEPA FILTERS ARE | | | USED FOR AIR DEVICES IN THESE TYPES OF ROOMS, HOWEVER | | | NONE HAVE BEEN SPECIFIED. PLEASE REFER TO CHAPTER 18 OF | | | THE ASHRAE HANDBOOK FOR MORE INFORMATION. | | | | | | 3) M2: THE WIND LOAD DESGIN CRITERIA FOR ATTACHING THE | | | RTU IS INCOMPLETE AND ALSO SPECIFIES AN INCORRECT WIND | | | SPEED FOR WPB. REFER TO SECTION 1609 FBC-14 BUILDING. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|