| Plan Review Notes For Permit 16100011 |
| Permit Number |
16100011 |
|
| Review Stop |
M |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2016-10-11 12:14:20 | 1ST REVIEW FBC-2014 MECHANICAL | | | PERMIT #16100011 | | | 10/11/16 | | | | | | 1) PROVIDE THE GAGE OF STAINLESS STEEL FOR THE GREASE | | | DUCTS- SECTION 506.3.1.1. | | | | | | 2) PROVIDE PLAN AND ELEVATION VIEWS OF THE GREASE DUCTS | | | SHOWING THE REQUIRED 18" CLEARANCES TO COMBUSTIBLES. | | | CLARIFY IF IF THE DUCTS WILL BE WRAPPED WITH APPROVED | | | FIREWRAPPING AND HOW THE COMBUSTIBLE ROOF WILL BE | | | PROTECTED AT THE DUCT PENETRATIONS- SECTION 506.3.6. | | | | | | 3) PROVIDE THE HEIGHT OF EXHAUST FAN DISCHARGE OPENINGS | | | ABOVE THE ROOF SURFACE- 506.3.13.1. | | | | | | 4) PROVIDE A ROOF PLAN SHOWING THE REQUIRED CLEARANCES | | | FOR THE EXHAUST TERMINATIONS AS REQUIRED IN SECTION | | | 506.3.13.3 | | | | | | 5) THE ENGINEERING FOR THE EXHAUST AND SUPPLY FANS IS | | | INCOMPLETE: A) THE SUBMITTED NOA FOR THE EXHAUST FANS | | | IS A BAD COPY AND IS NOT LEGIBLE. PLEASE PROVIDE A | | | CLEAR COPY OF THE NOA WITH ALL APPLICABLE INSTALLATIONS | | | DETAILS, NOTES, AND DESIGN PRESSURES CIRCLED, | | | HIGHLIGHTED, OR OTHERWISE MARKED BY THE ENGINEER OF | | | RECORD. B) THE SUBMITTED ENGINERERING FROM SEACOAST | | | APPEAR TO | | | HAVE COPIED SIGNATURES AND SEALS, AND ENGINEERING FOR | | | KSF-3 WAS NOT SUBMITTED. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|