| 2016-09-29 08:30:05 | ELECTRICAL REVIEW NOTES |
| | REVIEWED FOR COMPLIANCE WITH: |
| | ELECTRICAL REVIEW NOTES |
| | REVIEWED FOR COMPLIANCE WITH: |
| | 5TH EDITION FBC 2014 & NFPA 70 2011 (NEC) |
| | |
| | PROJECT NAME: |
| | JOB ADDRESS: |
| | DESCRIPTION: REPLACE METER CAN AND 2 LAKE AERATOR |
| | CONTROLLERS |
| | MASTER PERMIT: 16090909 |
| | |
| | BELOW PLEASE FIND A LIST OF REQUIRED CORRECTIONS. |
| | ADDITIONAL CORRECTIONS MAY BE REQUIRED AFTER REVIEW OF |
| | SUBMITTED CORRECTIONS. |
| | |
| | 1. NEC 682.11: YOU SHALL SUBMIT A SITE DIAGRAM/PLAN |
| | SHOWING THE LOCATION OF EVERY ELECTRICAL COMPONENT |
| | ASSOCIATED WITH THE PERMIT TO ASCERTAIN COMPLIANCE WITH |
| | RELATION TO THE SHORELINE AND THE ELECTRICAL DATUM |
| | PLANE. |
| | 2. ALL LIVE PARTS SHALL BE ELEVATED 12? ABOVE THE EDP & |
| | SERVICE EQUIPMENT SHALL DISCONNECT WHEN THE WATER RISES |
| | TO THE EDP. |
| | 3. NEC 682.33(A): YOU SHALL SHOW ON THE SITE PLAN THE |
| | REQUIRED EQUIPOTENTIAL BONDING PLANE. |
| | |
| | WHEN RESUBMITTING, FOR A QUICKER RETURN ON YOUR |
| | RE-SUBMITTAL, PLEASE PROVIDE A RESPONSE LETTER |
| | (NARRATIVE) ADDRESSING EACH ITEM AND THE PAGE NUMBER |
| | WHERE THE CORRECTIONS APPEAR ALONG WITH THE STANDARD |
| | CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PAGES INTO THE SUBMITTAL PACKAGE. MARK VOID |
| | AND LEAVE THE PREVIOUSLY REVIEWED SHEETS FOR |
| | COMPARATIVE REVIEW. CLOUDING THE CHANGES WILL BE |
| | GREATLY APPRECIATED. |
| | |
| | IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO |
| | CONTACT ME DIRECTLY. |
| | |
| | THANK YOU, |
| | MIKE ALBARRAN |
| | ELECTRICAL PLANS EXAMINER |
| | PH: 561-805-6746 |
| | EMAIL: [email protected] |
| | |
| | |