| 2016-10-25 05:54:41 | 1) THERE ARE ALREADY BUILDING DIVISION STAMPS ON THE |
| | ARCHITECTURAL PLANS WITH THE PERMIT NUMBER #15120896 ON |
| | THE PLANS. THESE PLANS ARE FOR AN ENTIRELY DIFFERENT |
| | PERMIT NUMBER. WHY IS AN EXISTING SET OF PLANS THAT HAS |
| | ALREADY BEEN REVIEWED AND APPROVED BEING SUBMITTED FOR |
| | REVIEW? CLARIFY. |
| | 2) SHT. A4.02 - UNIT B.1 & B.1R - THE 30 X 48 INCH |
| | CLEAR FLOOR SPACE REQUIRED FOR THE SHOWER IN THE THE |
| | MASTER BATH SHALL BE FLUSH WITH THE CONTROL WALL IN |
| | ACCORDANCE WITH REQUIREMENT # 7 OF THE FHA GUIDELINES. |
| | 3) SHT. A8.03 - VANITY TOP PLAN - SHOWS THE WATER |
| | CLOSET 1' - 6" FROM THE ADJACENT WALL AND IT IS NOTED |
| | THAT IT IS FOR THE FIRST FLOOR UNITS ONLY. PER THE FHA |
| | GUIDELINES, A WING OR PRIVACY WALL MAY OVERLAP THE |
| | CLEAR FLOOR SPACE FOR THE WATER CLOSET, HOWEVER IT MUST |
| | BE AT LEAST 33 INCHES FROM THE OPPOSITE WALL. CLARIFY |
| | WHY IT IS NOTED THAT IT APPLIES TO THE FIRST FLOOR |
| | ONLY. IT SHOULD APPLY TO ALL UNITS. |
| | 4) SHT.A0.02 - THERE IS A CLOUDED NOTE ON THE PLANS |
| | THAT STATES "ALL UNITS ARE HANDICAP ACCESSIBLE |
| | COMPLYING WITH ...." AND STATES THAT WOOD BLOCKING WILL |
| | BE PROVIDED IN ALL FIRST FLOOR UNITS FOR FUTURE GRAB |
| | BARS. WOOD BLOCKING SHALL BE PROVIDED IN ALL COVERED |
| | DWELLING UNITS FOR THE FUTURE INSTALLATION OF GRAB BARS |
| | PER THE FHA GUIDELINES. REVISE THIS NOTE TO INCLUDDE |
| | ALL COVEREDD DWELLING UNITS. |
| | 5) SHT. P6.01 - NOTE #13 STATES THAT CPVC WILL BE USED |
| | FOR CONDENSATE DRAIN PIPING RUNOUTS TO THE UNITS. IF |
| | THE A/C CLOSET IS A RETURN AIR PLENUM, THE MATERIALS |
| | WITHIN THE PLENUM SHALL BE NONCOMBUSTIBLE OR SHALL BE |
| | LISTED AS HAVING A FLAME SPREAD INDEX OF NOT MORE THAN |
| | 25 AND A SMOKE - DEVEELOPED INDEX OFF NOT MORE THAN 50 |
| | WHEN TESTED IN ACCORDANCE WITH ASTM E 84 OR UL 723 PER |
| | THE 2014 FMC SEC.602.2.1. SUBMIT MANUFACTURER'S |
| | SPECIFICATIONS OF THE CPVC FOR REVIEW. |
| | 6) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE OIL |
| | SMART PUMP SYSTEM. WPB AMEND. TO FBC SEC. 107.2.1. |
| | |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |
| | |