| 2016-11-21 14:27:35 | 2ND REVIEW FBC-2014 MECHANICAL |
| | PERMIT #16090832 |
| | 11/21/16 |
| | |
| | 1) THE REVISED ENERGYGAUGE ASHRAE 90.1 SUBMITTAL DOES |
| | NOT INCLUDE COMPLIANCE DATA FOR DX-1, OR EFFICIENCY |
| | RATINGS OF THE CRU SYSTEMS- SEE TABLE C403.2.3(10) |
| | FBC-14 ENERGY CONSERVATION. CONCERNING THE AHU'S, REFER |
| | TO TABLE C403.2.3(1) AND PROVIDE COMPLIANCE DATA PER |
| | THE AHRI TEST PROCEDURE FOR WATER COOLED UNITS (IF |
| | APPLICABLE). |
| | |
| | 2) THE REQUESTED EXHAUST VENTILATION CALCULATIONS WERE |
| | NOT INCLUDED IN THE ASHRAE VENTILATION SUBMITTAL. |
| | |
| | 3) THE ASHRAE VENTILATION SUBMITTAL INDICATES 1165 CFMS |
| | OF O/A FOR AHU-3, THE SCHEDULE INDICATES THE UNIT |
| | PRODUCES 2100 CFMS- IS THIS CORRECT? |
| | |
| | 4) COMMISSSIONING IS REQUIRED FOR BOTH THE MECHANICAL |
| | SYSTEMS AND THE ELECTRICAL POWER AMND LIGHTING SYSTEMS- |
| | PLEASE PROVIDE A PLAN- SEE SECTION C408.1. |
| | |
| | 5) ADVISORY: DEFERRED SUBMITTALS ARE REQUESTED FOR THE |
| | WIND LOAD ENGINEERING FOR INSTALLATION OF ALL EXTERIOR |
| | MECHANICAL EQUIPMENT AND THE REQUIRED FL. PRODUCT |
| | APPROVALS AND/OR MIAMI-DADE NOAS FOR LOUVERS, AC STANDS |
| | ETC. PLEASE REVIEW THE FOLLOWING SECTION FROM THE WPB |
| | AMENDMENTS AND PROVIDE A LIST OF EQUIPMENT AND |
| | COMPONENTS TO BE DEFERRED. |
| | |
| | A) DEFERRED SUBMITTAL: 107.3.4.2 DEFERRED SUBMITTALS. |
| | FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS |
| | ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE |
| | NOT SUBMITTED AT THE TIME OF THE |
| | APPLICATION AND THAT ARE TO BE SUBMITTED TO THE |
| | BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL |
| | OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF |
| | THE BUILDING OFFICIAL. THE REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE |
| | DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR |
| | REVIEW BY THE BUILDING OFFICIAL. |
| | |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |
| | B) DEFERRED SUBMITTAL. 2010 FBC 107.3.4.1 PRODUCT |
| | APPROVALS. THOSE PRODUCTS WHICH ARE REGULATED BY THE |
| | DCA RULE 9N-03 SHALL BE REVIEWED AND APPROVED IN |
| | WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL |
| | FOR JURISDICTIONAL APPROVAL. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |