| 2016-09-29 17:02:24 | 1ST REVIEW FBC-2014 MECHANICAL |
| | PERMIT #16090832 |
| | 9/29/16 |
| | |
| | 1) PROVIDE VENTILATION CALCULATIONS FOR O/A AND EXHAUST |
| | FOR ALL ROOMS AND SPACES USING THE DESIGN PARAMETERS |
| | SHOWN IN TABLE 403.3 FBC-14 MECHANICAL. PROVIDE A |
| | SCHEDULE INDICATING THE REQUIRED AND PROVIDED CFMS OF |
| | O/A AND EXHAUST. THE DESIGN CRITERIA TABLE ON M-101 |
| | DOES NOT APPEAR TO BE CONSISTENT WITH TABLE 403.3, AND |
| | DOES NOT SHOW ANY EXHAUST CALCULATIONS. |
| | |
| | 2) DESIGN EFFICIENCIES AND CRITERIA FOR THE AHU'S ARE |
| | NOT LISTED IN THE ENERGYGAUGE SUBMITTAL OR IN THE AHU |
| | SCHEDULE ON SHEET M-102. |
| | |
| | 3) THE ENERGYGAUGE SUBMITTAL SHOWS COMPLIANCE DATA FOR |
| | CRU'S 12, 34, & 56, HOWEVER THE SCHEDULE INDICATES |
| | CRU'S 1, 2, 3, 4, 5, & 6. |
| | |
| | 4) PROVIDE PIPING SYSTEM COMPLIANCE DATA IN THE |
| | ENERGYGAUGE SUBMITTAL. |
| | |
| | 5) THE AC CALCULATIONS AND SCHEDULE FOR THE COMPUTER |
| | SYSTEMS DO NOT MATCH IN SYSTEM IDENTIFICATIONS, NUMBER |
| | OF SYSTEMS, AND CAPACITIES OF SYSTEMS. |
| | |
| | 6) THE HEATING CAPACITIES OF THE AHU-3 TERMINAL BOXES |
| | ARE EXCEEDING THE CALCULATED HEATING COIL LOADS. |
| | |
| | 7) M-103: PLEASE PROVIDE THE CHILLED WATER DATA IN THE |
| | CHILLER SCHEDULE. |
| | |
| | 8) SHEET M-104: PROVIDE AN EQUIPMENT SCHEDULE FOR THE |
| | TEMPORARY AIR HANDLER AND INDICATE HOW THE DUCTWORK |
| | WILL BE SUPPORTED, PROTECTED, AND SEALED AT THE |
| | BUILDING PENETRATION |
| | |
| | 9) M-201 & M-202: THE TEMPORARY AC SYSTEMS ARE LISTED |
| | AS BOTH AC-TEMP AND RTU-TEMP- PLEASE CLARIFY. INDICATE |
| | HOW THE AC EQUIPMENT WILL BE MOUNTED (EQUIPMENT IS NOT |
| | SHOWN ON A TRAILER) AND HOW THE DUCTWORK WILL BE |
| | SUPPORTED, PROTECTED, AND SEALED AT THE PENETRATION OF |
| | THE BUILDING. A) PLEASE NOTE THAT A GAS PIPING PLAN AND |
| | ISOMETRIC WILL BE REQUIRED FOR THE HEAT. |
| | |
| | 10) M-211: FIRE DAMPERS, OR SYMBOLS FOR FIRE DAMPERS, |
| | APPEAR TO BE MISSING AT THE DUCT PENETRATIONS ALONG THE |
| | EAST WALL OF THE CONTROL THEATER- SECTION 607.5.2. |
| | |
| | 11) M-211: PLEASE CLARIFY THE PURPOSE OF EF-1-1 & |
| | EF-2-1 AND HOW THESE FANS WERE SIZED. |
| | |
| | 12) M-212: SEE COMMENT #9 CONCERNING MISSING FIRE |
| | DAMPERS FOR DUCTS PENETRATING THE FIRE-RATED WALL. IT |
| | APPEARS THAT MANY OTHER DAMPERS ARE MISSING WHERE DUCTS |
| | PENETRATE FIRE-RATED CORRIDOR AND OTHER SEPARATION |
| | WALLS. PLEASE OVERLAY THE LIFE SAFETY PLANS ON THE |
| | MECHANICAL LAYOUT PAGES SO THAT RATED WALLS ARE CLEARLY |
| | SHOWN. |
| | |
| | 13) M-212: EF 4-1 AND TG-1 ARE UNDERSIZED FOR THE |
| | MINIMUM REQUIRED EXHAUST CFMS FROM THE MENS RESTROOM |
| | 180 PER TABLE 403.3- 250 CFMS. |
| | |
| | 14) M-212: PROVIDE AN EXHAUST VENTILATION CALCULATION |
| | FOR THE LOCKER ROOM- TABLE 403.3. |
| | |
| | 15) M-211- M222: PLEASE LABEL OR TAG ALL TB ACCESS |
| | PANELS, AND PROVIDE ACCESS TO ABOVE CEILING EXHAUST |
| | FANS- SECTION 306.1. |
| | |
| | 16) PROVIDE CHILLED WATER PIPING DETAILS- TYPE OF |
| | PIPING, JOINERY, INSULATION. |
| | |
| | 17) PROVIDE ENGINEERED STRUCTURAL DETAILS AND THE WIND |
| | LOAD DESIGN CRITERIA FOR INSTALLATION OF THE CHILLERS |
| | AND THE PUMPS- SECTION 301.15. |
| | |
| | 18) SUBMIT FL. PRODUCT APPROVALS AND/OR MIAMI-DADE |
| | NOA'S FOR ALL AIR INTAKE AND EXHAUST LOUVERS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |