| Plan Review Notes For Permit 16090809 |
| Permit Number |
16090809 |
|
| Review Stop |
M |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2017-02-23 09:04:35 | 1ST REVIEW FBC-2014 MECHANICAL | | | PERMIT #16090809 | | | 2/23/17 | | | | | | 1) DWG NO 500: IDENTIFY THE DAY TANK ON THE DRAWINGS | | | AND SHOW THE VENT PIPING RUNS AND DISCHARGE LOCATIONS- | | | SEE SECTION 1305.7 . PLEASE PROVIDE THE TYPES AND SIZES | | | OF VENT PIPES. | | | | | | 2) DWG NO 500: PROVIDE THE CLEARANCE DISTANCE | | | MEASUREMENTS FOR THE GENERATOR COMBUSTION AND RADIATOR | | | EXHAUST OUTLETS TO GRADE- SEE SECTION 501.3.1 | | | | | | 3) CLARIFY THE SCOPE OF WORK PERTAINING TO THE LARGE | | | INDOOR GENERATOR FUEL TANKS. IT APPEARS FROM THE | | | DRAWINGS THAT EITHER ONE OR TWO NEW TANKS ARE BEING | | | INSTALLED IN THE EQUIPMENT ROOM ADJACENT TO THE | | | GENERATOR ROOM. PROVIDE SPECIFICATIONS ON THE PLAN AND | | | SUBMIT PRODUCT DATA SHEETS FOR THE TANKS. REVIEW | | | CHAPTER 9 NFPA 30 AND SHOW COMPLIANCE WITH ALL | | | APPLICABLE SECTIONS FOR INDOOR STORAGE OF FLAMMABLE AND | | | COMBUSTIBLE LIQUIDS. | | | | | | 4) THE SUBMITTED NOA'S FOR THE AIR INTAKE AND THE | | | EXHAUST LOUVERS DO NOT INCLUDE THE INSTALLATION | | | DRAWINGS- PLEASE PROVIDE COMPLETE SUBMITTALS. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|