| Date |
Text |
| 2017-01-19 08:20:38 | ****PROVISOS**** |
| | ****ISSUED AT APPLICANT'S RISK**** |
| | |
| | SAMANTHA HILL |
| | BUILDING PLANS EXAMINER |
| | [email protected] |
| | 561-805-6724 |
| | |
| | FBC 5TH EDITION, BUILDING |
| | |
| | 1. FBC 503.1, FBC EXISTING BUILDING 1012.5; COMPLIANCE |
| | NOT CLEAR; REVISE PAGE. |
| | REFER TO EMAILS; MOST STRINGENT OCCUPANCY WAS NOT |
| | UTILIZED, INCREASE FOR 1 STORY RATHER THAN 2 STORY |
| | USED. OPTIONS ARE: SEPARATED USE, NON SEPARATED MIXED |
| | USE SHOWING COMPLIANCE FOR A3, USE FRONTAGE INCREASE, |
| | DIFFERENT BUILDING TYPE - IT APPEARS THAT BUILDING |
| | COMPLIES; A REVISION IS REQUIRED, ISSUED AT APPLICANT'S |
| | RISK |
| | |
| | 2. FBC 1006, MEANS OF EGRESS ILLUMINATION, REAR EXIT, |
| | REQUIRES ILLUMINATION IN THE EXIT DISCHARGE TO THE |
| | PUBLIC WAY. |
| | ILLUMINATION NOT SHOWN BUT IS REQUIRED. SITE LIGHTING |
| | IS UNDER A SEPARATE PERMIT AND SHOULD INCLUDE |
| | PHOTOMETRICS TO SHOW COMPLIANCE. THIS MAY BE EITHER |
| | DEMONSTRATED VIA A REVISION, SITE LIGHTING PERMIT, OR |
| | FIELD VERIFIED BY THE INSPECTOR. |
| | |
| | 4. FBC ACCESSIBILITY 405.6, RAMP RISE NOT TO EXCEED 30 |
| | INCHES. |
| | THE DETAIL ON A 2.0.1 SHOWS A RISE OF 33". THIS ITEM |
| | HAS BEEN REDLINED. THE RISE LIMITATION OF 30" WILL BE |
| | FIELD VERIFIED BY THE INSPECTOR. IF A SIGNIFICANT |
| | DESIGN CHANGE IS REQUIRED, A REVISION IS REQUIRED. |
| | |
| | 5. CHECK OUT AISLES, SALES AND SERVICE COUNTERS, TO |
| | COMPLY WITH FBC ACCESSIBILITY 904. |
| | |
| | 6. PROVIDE A COPY OF THE CONTRACT FOR THIS JOB, FBC |
| | 109. |
| | |
| | FLOOD / NFIP PROVISO: |
| | |
| | ABBREVIATIONS USED (SEE ALSO FBC 1612): |
| | |
| | BFE, BASE FLOOD ELEVATION |
| | DFE, DESIGN FLOOD ELEVATION (BFE PLUS FREEBOARD AND |
| | OTHER REQUIREMENTS) |
| | FFE, FINISHED FLOOR ELEVATION |
| | FIRM, FLOOD INSURANCE RATE MAP |
| | SFHA, SPECIAL FLOOD HAZARD AREA |
| | |
| | THIS STRUCTURE IS LOCATED IN SFHA ZONE A8, BFE 13 FEET |
| | NGVD29 PER FIRM. BASED ON PROJECT VALUE AND PROPERTY |
| | APPRAISER VALUE OF THE STRUCTURE, THIS IS CONSIDERED A |
| | SUBSTANTIAL IMPROVEMENT. |
| | |
| | PRIOR TO CONCRETE POUR, A FORM BOARD SURVEY WITH |
| | ELEVATIONS WILL BE REQUIRED. ALL IMPROVEMENTS ARE TO BE |
| | AT OR ABOVE DFE OR BE DESIGNED TO RESIST FLOOD LOADS, |
| | FBC 1612. |
| | |
| | 7. PROVISO, PRIOR TO FINAL INSPECTION, THE FOLLOWING IS |
| | TO BE SUBMITTED: |
| | |
| | A. COMPLETED ELEVATION CERTIFICATE. ALL EQUIPMENT AND |
| | IMPROVEMENTS TO BE ABOVE DFE (14 FEET NGVD29). |
| | B. PHOTOGRAPHS OF ALL SIDES OF THE STRUCTURE |
| | C. PHOTOGRAPHS OF ALL MECHANICAL AND UTILITY EQUIPMENT |
| | LOCATED OUTSIDE THE BUILDING SHOWING ITS RELATION TO |
| | THE BUILDING AND GROUND AND ITS REQUIRED ANCHORING. |
| | |
| | NOTE THAT ROOFTOP EQUIPMENT IS NOT EXEMPTED FROM |
| | PHOTOGRAPH REQUIREMENTS. |
| | |
| | THESE REQUIREMENTS ARE FROM CRS ACTIVITY RA3 TO |
| | DOCUMENT COMPLIANCE WITH FBC 1612. |
| | |
| | |