| 2016-09-10 04:16:20 | 1) SUBMIT A SITE PLAN SHOWING THE LOCATION AND CAPACITY |
| | OF THE LP TANK. SHOW THE DISTANCE OF THE LP TANK FROM |
| | THE BUILDING WALL. COMPLY WITH NFPA 58 SEC.6.3.2.3 - NO |
| | PART OF AN UNDERGROUND OR MOUNDED ASME CONTAINER |
| | SHALL BE LESS THAN 10 FT (3 M) FROM A BUILDING OR LINE |
| | OF ADJOINING PROPERTY THAT CAN BE BUILT UPON |
| | 2) SHOW THE DISTANCE OF THE LP TANK TO THE |
| | DRIVEWAY.INSTALLATIONS WITHIN 10 FT (3 M) OF A PUBLIC |
| | VEHICULAR THOROUGHFARE OR DESIGNATED PARKING LOCATION |
| | SHALL BE PROVIDED WITH |
| | VEHICULAR BARRIER PROTECTION FOR THE CONTAINER?S |
| | FITTING HOUSING, COMPLY WITH NFPA 58 SEC.6.6.6.1 (C) & |
| | (E) - THE INSTALLATION OF A BURIED CONTAINER SHALL |
| | INCLUDE PROTECTIONFOR THE CONTAINER AND PIPING AGAINST |
| | PHYSICAL DAMAGE |
| | FROM VEHICULAR TRAFFIC. |
| | 3) SUBMIT COMPLETE MANUFACTURER'S |
| | SPECIFICATIONS/INSTALLATIONN MANUAL FOR REVIEW. THE |
| | GENERATOR SHALL BE UL 2200 LISTED AND BE INSTALED IN |
| | ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION |
| | INSTRUCTIONS AND NFPA 37. 2014 FBC-FUEL GAS SEC.616.1. |
| | 4) SUBMIT DETAILS AS TO HOW THE LP TANK WILL BE |
| | ANCHORED TO PREVENT FLOTATION. NFPA 58 SEC. 6.6.1.6. |
| | 5) SHOW THE TYPE OF TANK ( DOT OR ASME ), THE LOCATION |
| | TO ADJACENT PROPERTY LINES, THE DISTANCE OF THE TANK |
| | FROM ALL SOURCES OF IGNITION, OTHER CONTAINERS, |
| | BUILDINGS, AND THE LOCATION OF ANY BUILDING OPENINGS |
| | BELOW THE RELIEF VALVE OF THE TANK PER NFPA 58, TABLE |
| | 3-2.2.2. |
| | 6) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL |
| | PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE |
| | CORRUGATED STAINLESS STEEL TUBING (IF APPLICABLE) FOR |
| | EACH PIPE SIZE. WPB AMENDMENTS TO FBC SEC.107.2.1. |
| | 7) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS |
| | METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2014 |
| | FBC-FUEL GAS SEC.402.4.1 OR 2014 FBC-RES. SEC. G |
| | 2413.3. |
| | 8) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| | ON THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES. |
| | SEC. G2413.2. |
| | 9.) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / |
| | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY |
| | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND |
| | FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014 |
| | FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED |
| | AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS |
| | APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF |
| | INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1. |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |