| 2016-09-07 14:06:59 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, |
| | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | PLEASE CONSIDER THE FOLLOWING AS PROVISO: |
| | |
| | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED |
| | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE |
| | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE |
| | INSPECTION. |
| | |
| | |
| | 1) SHEET LS 00 - THERE ARE INCORRECT REFERENCES |
| | INDICATED FOR THE FIRE CODE. |
| | |
| | THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS OF THE |
| | 5TH EDITION OF FLORIDA FIRE PREVENTION CODE INCLUDING |
| | THE 2012 EDITION OF NFPA 1 AND NFPA 101 AND ALL OTHER |
| | APPLICABLE CODES OR STANDARDS. |
| | FIRE SPRINKLER WORK SHALL COMPLY WITH THE REQUIREMENTS |
| | OF NFPA 13, 2010 EDITION. |
| | FIRE ALARM WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| | NFPA 72, 2010 EDITION. |
| | CONSTRUCTION WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| | NFPA 241, 2009 EDITION. |
| | FIRE EXTINGUISHERS SHALL COMPLY WITH THE REQUIREMENTS |
| | OF NFPA 10, 2010 EDITION. |
| | ELECTRIC WORK SHALL COMPLY WITH NFPA 70, 2011 EDITION. |
| | AIR CONDITION WORK SHALL COMPLY WITH NFPA 90 A & B, |
| | 2012 EDITION |
| | INSPECTION, TESTING & MAINTENANCE SHALL COMPLY WITH |
| | NFPA 25, 2011 EDITION. |
| | |
| | PLEASE ENSURE COMPLIANCE WITH THE APPLICABLE CODES AND |
| | IF REVISIONS ARE SUBMITTED PLEASE USE CLOUDED |
| | NOTATIONS. |
| | |
| | |
| | 2) SHEET LS 00 - THERE IS NO INDICATION FOR FIRE |
| | SPRINKLER WORK. |
| | |
| | ANY AND ALL WORK ON THE FIRE SPRINKLER SYSTEM SHALL BE |
| | DONE UNDER SEPARATE SHOP DRAWINGS AND BY CERTIFIED LIFE |
| | SAFETY CONTRACTORS. |
| | ANY TIME THAT WORK ON THE LIFE SAFETY SYSTEMS, |
| | SPRINKLER AND/OR FIRE ALARM, EXCEEDS 4 HOURS, A FIRE |
| | WATCH SHALL BE IMPLEMENTED AND MAINTAINED UNTIL FULL |
| | AND COMPLETE PROTECTION IS RETURNED. |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |
| | |
| | |