| 2016-10-28 12:12:41 | 2ND REVIEW FBC-2014 MECHANICAL |
| | PERMIT #16081096 |
| | 10/28/16 |
| | |
| | 1) THE AC CALCULATIONS FOR RTU-3A INDICATE 8.6 KW HEAT |
| | REQUIRED, THE SCHEDULE INDICATES 4.0 KW PROVIDED. RTU- |
| | 3B- 11.66 KW REQUIRED, 6.0 KW PROVIDED. |
| | |
| | 2) SHEET M1.1: IT APPEARS THAT THERE IS NO WAY FOR THE |
| | AIR SUPPLIED TO ALL THE FLEX, OFFICE, SALES, MANGEMENT |
| | ROOMS ETC. TO RETURN TO RTU-1. THE ARCHITECTURAL |
| | DRAWINGS APPEAR TO INDICATE THE FRAMED AND GLASS WALLS |
| | ARE SPANNING FROM FLOOR TO UNDERSIDE OF DECK WHICH |
| | WOULD CLOSE OFF THE AIRWAYS- SEE SHEETS A1.1, A3.1.2, & |
| | A5.0.1. |
| | |
| | 3) IN RESPONSE TO COMMENT #13 FROM THE 1ST REVIEW, THE |
| | ENGINEER IS REQUESTED THE WIND LOAD ENGINEERING FOR |
| | ANCHORING THE NEW RTU'S TO BE DEFERRED SUBMITTALS WHICH |
| | IS ACCEPTED. PLEASE REVIEW THE FOLLOWING REQUIREMENTS |
| | PER SECTION 107.3.4.2 WPB AMENDMENTS TO THE FBC: |
| | |
| | A) DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS |
| | SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE |
| | PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE |
| | TIME OF THE |
| | APPLICATION AND THAT ARE TO BE SUBMITTED TO THE |
| | BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL |
| | OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF |
| | THE BUILDING OFFICIAL. THE REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE |
| | DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR |
| | REVIEW BY THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |
| | |
| | B)107.3.4.1 PRODUCT APPROVALS. THOSE PRODUCTS WHICH ARE |
| | REGULATED BY THE DCA RULE 9N-03 SHALL BE REVIEWED AND |
| | APPROVED IN WRITING BY THE DESIGNER OF RECORD PRIOR TO |
| | SUBMITTAL FOR JURISDICTIONAL APPROVAL. |
| | FROM THE 1ST REVIEW, THE ENGINEER IS REQUESTED THE WIND |
| | LOAD ENGINEERING FOR ANCHORING THE NEW RTU'S TO BE |
| | DEFERRED SUBMITTALS. PLEASE REVIEW THE FOLLOWING |
| | REQUIREMENTS PER SECTION |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |