| 2016-09-06 15:17:29 | 1ST REVIEW FBC-2014 MECHANICAL, EXISTING BUILDING, |
| | ENERGY CONSERVATION CODES |
| | PERMIT #16081096 |
| | 9/6/16 |
| | |
| | 1) THE PROJECT IS INCORRECTLY IDENTIFED AS A RENOVATION |
| | IN THE PROJECT SUMMARY OF THE ENERGYGAUGE COMPLIANCE |
| | SUBMITTAL. THE CORRECT IDENTIFICATION PER SECTION 202 |
| | FBC-14 EXISTING BUILDING IS CHANGE OF OCCUPANCY- PLEASE |
| | CORRECT. |
| | |
| | 2) THE SUMMARY AC CALCULATIONS MUST INCLUDE THE TOTAL |
| | LATENT GAINS FOR EACH SYSTEM- REFER TO SECTION C403.2.1 |
| | FBC-14 ENERGY CONSERVATION EXCEPTION. |
| | |
| | 3) SHEET M0.2: RTU-1 & RTU- 3A AT 12.5 AND 5TON PER THE |
| | SCHEDULE ARE EACH EXCEEDING THE COOLING LOADS |
| | CALCULATED- SEE SECTION C403.2.2. |
| | |
| | 4) M0.2: THE ELECTRIC HEAT KW CAPACITIES SHOWN IN THE |
| | SCHEDULE FOR RTU-1 AND RTU-3B ARE UNDERSIZED PER THE |
| | CALCULATED HEATING LOADS- C403.2.2. |
| | |
| | 5) M0.2: PLEASE PROVIDE THE COOLING CAPACITY AND |
| | EFFICIENCY RATING OF RTU-4 IN THE SCHEDULE- SEE PAGE 6 |
| | OF ENERGY SUBMITTAL. |
| | |
| | 6) M0.2: THE O/A CALCULATIONS FOR THE SQUASH COURTS AND |
| | SPECTATOR AREA ARE NOT IN COMPLIANCE WITH TABLE 403.3 |
| | FBC-14 MECHANICAL- RATES AND OCCUPANT DENSITIES. |
| | |
| | 7) REFER TO SECTION C403.2.4.4 AND SHOW COMPLIANCE FOR |
| | O/A SHUTOFF DAMPER CONTROLS. |
| | |
| | 8) PROVIDE CONTROL DIAGRAMS FOR EXHAUST FANS F-1A & |
| | F-1B. |
| | |
| | 9) DUCT SMOKE DETECTORS ARE REQUIRED IN THE RETURN AIR |
| | SYSTEMS OF RTU'S 3A & 3B PER SECTION 606.2.1. NOTE: |
| | THIS REQJUIREMENT WILL BE WAIVED PENDING SUBMITTAL OF |
| | MANUFACTURER'S DATA INDICATING THE SYSTEMS CANNOT |
| | EXCEED 2000 CFMS OF SUPPLY AIR. |
| | |
| | 10) M1.1: THE RETURN AIR GRILLS FOR RTU'S 3A & 3B ARE |
| | UNDERSIZED FOR 1272 CMFS OF RETURN AIR. |
| | |
| | 11) PLEASE CLARIFY THE USE OF THE OPEN AREA. THE TYPE |
| | OF ACTIVITIES THAT WILL TAKE PLACE THERE COULD IMPACT |
| | THE O/A RATES AND AC SYSTEMS. |
| | |
| | 12) PROVIDE A MECHANICAL ROOF PLAN SHOWING RTU AND FAN |
| | LOCATIONS, AND ALL REQUIRED CLEARANCE DISTANCE |
| | MEASUREMENTS. |
| | |
| | 13) PROVIDE THE WIND LOAD DESIGN CRITERIA FOR ALL |
| | ROOFTOP MECHANICAL INSTALLATIONS, AND DRAWINGS AND |
| | DETAILS FOR COMPLETE INSTALLATIONS OF THE RTU'S AND |
| | CURBS, FANS AND CURBS, AND ROOFTOP DUCTWORK. |
| | |
| | 14) REFER TO SECTION 6.4.3 OF THE ASHRAE STANDARD 90.1 |
| | AND PROVIDE HVAC CONTROL NOTES ON SHEET M6.1. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |