| 2016-08-26 05:16:41 | 1) THE MANUFACTURER'S SPECIFICATION SHEETS FOR THE GAS |
| | DRYER AND THE GAS RANGE DO NOT SHOW THAT THE APPLIANCES |
| | ARE LISTED AND LABELED IN ACCORDANCE WITH THE 2014 FUEL |
| | GAS CODE SEC. 301.3. SUBMIT TWO CCOPIES OF |
| | SPECIFICATIONS THAT SHOW COMPLIANCE. |
| | 2) THE GAS RISER DIAGRAM THAT HAS BEEN SUBMITTED LACKS |
| | NECESSARY INFORMATION FOR A PROPER AND COMPREHENSIVE |
| | PLAN REVIEW. COMPLY WITH ALL OF THE FOLLOWING |
| | REQUIREMENTS AND SUBMIT ALL REQUIRED INFORMATION |
| | SHOWING COMPLIANCE. |
| | 3) SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE |
| | LENGTH OF ALL CUT SECTIONS OF PIPE PER 2014 FBC-FUEL |
| | GAS, SECS. 402.4.1, 402.4.2. OR 2014 FBC-RES SEC. |
| | G2413. |
| | 4) BTU LOAD OF EACH APPLIANCE AND THE TOTAL BTU LOAD ON |
| | THE SYSTEM. REFER TO THE 2014 FBC-FUEL GAS SECS.401.8 |
| | THRU 402.6.1 AND TABLES 402.4 (1) THRU 402.4 (37) OR |
| | 2014 FBC-RES. SEC. G2413. |
| | 5) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, ( GAS |
| | METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2014 |
| | FBC-FUEL GAS SEC.402.4.1 OR 2014 FBC-RES. SEC. G |
| | 2413.3. |
| | 6) SUBMIT TWO COPIES OF THE SIZING TABLES USED IN THE |
| | DESIGN FOR THIS GAS SYSTEM OR PLACE A NOTE ON BOTH SETS |
| | OF PLANS LISTING THE SIZING TABLES FROM THE GAS CODE |
| | THAT WERE USED IN THE DESIGN OF THIS SYSTEM. FGC |
| | SEC.402.3. THE CODE EDITION THAT IS REFERENCED ON THE |
| | GAS DRAWING IS OUTDATED. THE GAS CODE THAT IS IN EFFECT |
| | IS THE FIFTH EDITION ( THE 2014) OF THE FBC. |
| | 7) SHOW THE SIZE OF THE LINE ON THE OUTLET OF THE GAS |
| | METER.THIS LINE SHALL BE SIZED FOR THE TOTAL BTU LOAD |
| | ON THE SYSTEM AND THE TOTAL DEVELOPED LENGTH FROM THE |
| | METER TO THE MOST REMOTE OUTLET ON THE SYSTEM.2014 FGC |
| | SEC. 402.4.1. |
| | 8) THE GAS PLAN SHOWS WHAT APPEARS TO BE WATER LINES |
| | CONNECTED TO THE GAS LINES. THE NOTE STATES " TO |
| | EXISTING H.W. LINES". CLARIFY. |
| | 9) THE BTU LOAD OF THE EXISTING GAS WATER HEATER THAT |
| | IS BEING REPLACED MUST BE ADDED INTO THE TOTAL BTU LOAD |
| | ON THE SYSTEM TO ENSURE THE EXISTING SYSTEM IS PROPERLY |
| | SIZED. IF UNDERSIZED, THE EXISTING SYSTEM MUST BE |
| | REDONE TO ENSURE A SAFE OPERATING SYSTEM. FGC SECS. |
| | 401.4, 401.8, 402.1,402.2, 402.3 |
| | 10) SHOW THE DISTANCE OF THE TANKLESS WATER HEATER TO |
| | THE WIDOW. THE TANKLESS WATER HEATER SHALL BE LOCATED |
| | IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION |
| | INSTRUCTIONS FROM BUILDING OPENINGS INCLUDING SOFFIT |
| | VENTS. |
| | 11) SUBMIT CALCULATIONS FOR COMBUSTION AIR FOR THE |
| | DRYER AND THE WATER HEATER IN THE UTILITY ROOM PER THE |
| | 2014 FBC-FUEL GAS CODE SEC.304.1 OR 2014 FBC-RES. SEC. |
| | G 2407. |
| | 12) THE SCOPE OF WORK SHOWN ON THE PLANS EXCEEDS THE |
| | SCOPE OF WORK DESCRIBED ON THE APPLICATION.REVISE THE |
| | DESCRIPTION OF WORK ON THE APPLICATION TO CORRELATE |
| | WITH ALL WORK SHOWN ON THE PLANS. WPB AMEND. TO 2014 |
| | FBC SEC.107.2.1. |
| | 13) THE VALUE OF THIS PROJECT SHOWN ON THE APPLICATION |
| | APPEARS LOW. SUBMIT A DETAILED, QUANTITY ESTIMATE OR A |
| | BONA FIDE SIGNED CONTRACT IN ACCCORDANCE WITH WPB |
| | AMEND. TO FBC SEC.109.3. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |