| Date |
Text |
| 2016-10-17 17:31:33 | 2ND REVIEW FBC-2014 MECHANICAL |
| | PERMIT #16080659 |
| | 10/17/16 |
| | |
| | 1) THE AC CALCULATIONS MUST BEAR THE SIGNATURE AND SEAL |
| | OF THE ENGINEER WHO PREPARED THEM- SECTION C403.2.1 |
| | FBC-14 ENERGY CONSERVATION, AND SECTION 61G15-23.002 |
| | FAC. |
| | |
| | 2) THE PLAN DOES NOT CLEARLY INDICATE HOW AIR WILL BE |
| | RETURNED TO THE RTU FROM THE TECH ROOM, THE WEST AND |
| | NORTH OFFICES, THE RECEPTION ROOM, THE WORK AREAS, AND |
| | CORRIDORS. PLEASE REFER TO SHEETS A-1.0 AND A-3.0: THE |
| | D WALL TYPE AND THE GLASS PARTITION AND HEADERS ARE |
| | SHOWN TO BE SPANNING FROM THE FLOOR TO THE STRUCTURE |
| | ABOVE. A) ADVISORY: PLEASE REFER TO SECTION 601.2: |
| | CORRIDORS SHALL NOT SERVE AS RETURN DUCTS. |
| | |
| | 3) PROVIDE THE ROOF PLAN SHEET A1.1 SHOWN IN THE INDEX. |
| | |
| | 4) THE ARCHITECT HAS REQUESTED THE ENGINEERING FOR |
| | INSTALLATION OF THE RTU, CURB ADAPTER, AND ROOF STAND |
| | BE DEFFERRED SUBMITTALS. PLEASE NOTE THAT THE |
| | ENGINEERING MUST BE SUBMITTED AND APPROVED PRIOR TO |
| | INSPECTION OF THE INSTALLATIONS. |
| | |
| | A) DEFERRED SUBMITTAL: 107.3.4.2 DEFERRED SUBMITTALS. |
| | FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS |
| | ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE |
| | NOT SUBMITTED AT THE TIME OF THE |
| | APPLICATION AND THAT ARE TO BE SUBMITTED TO THE |
| | BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL |
| | OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF |
| | THE BUILDING OFFICIAL. THE REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE |
| | DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR |
| | REVIEW BY THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |
| | |
| | B) DEFERRED SUBMITTAL. 2010 FBC 107.3.4.1 PRODUCT |
| | APPROVALS. THOSE PRODUCTS WHICH ARE REGULATED BY THE |
| | DCA RULE 9N-03 SHALL BE REVIEWED AND APPROVED IN |
| | WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL |
| | FOR JURISDICTIONAL APPROVAL. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |