| 2016-12-29 16:25:25 | 3RD REVIEW FBC-2014 MECHANICAL |
| | PERMIT #16080543 |
| | 12/28/16 |
| | |
| | 1) SHEET M-1: PLEASE CLEARLY IDENTIFY THE SMOKE BARRIER |
| | AND CLARIFY WHY THERE IS A FS SYMBOL AT THE EMERGENCY |
| | CALL PANEL LOCATION. I AM NOT SEEING A DUCT OR A |
| | TRANSFER ALTHOUGH THE NOTE ON THE SHEET IS INDICATING |
| | TWO DUCT PENETRATIONS. CLARIFY HOW AIR IS BEING |
| | RETURNED FROM THE CORRIDOR, AND PLEASE NOTE THE |
| | FOLLOWING A) NO RETURN GRILLS OR SUPPLY DIFFUSERS ARE |
| | SHOWN IN THE |
| | |
| | CEILING PLAN ON A106.1 B) THE SMOKE BARRIER WALLS ARE |
| | NOT SHOWN ON THE CEILING PLAN. C) CORRIDORS SHALL NOT |
| | BE USED AS RETURN AIR DUCTS- SECTION 601.2. |
| | |
| | 2) SHOW THE AC SHAFTS ON THE ARCHITECTURAL PLANS AND |
| | PROVIDE HOURLY FIRE RATING AND ASSEMBLY DETAILS. |
| | |
| | 3) M-2: SHOW THE THE EXISTING DRYER EXHAUST DUCT RUN |
| | AND TERMINATION LOCATION. PLEASE NOTE AN INDEPENDENT |
| | SHAFT IS REQUIRED AND THE EXHAUST DUCTS SHALL NOT RUN |
| | THROUGH A PLENUM SPACE- SEE SECTION 504. |
| | |
| | 4) M-4: PROVIDE AN EQUIPMENT SCHEDULE AND INSTALLATION |
| | FOR THE FIRE/SMOKE DAMPERS. INDICATE IF THE DAMPERS ARE |
| | STANDARD OR DYNAMIC AND PROVIDE SEQUENCES OF OPERATION. |
| | |
| | 5) AC COOLING AND HEATING CALCULATIONS NOT PROVIDED FOR |
| | THE 4TH-6TH FLOOR LOBBIES ALTHOUGH THE PLANS SHOW |
| | SUPPLY AIR TO THOSE AREAS. |
| | |
| | 6) PROVIDE EQUIPMENT SCHEDULES FOR ALL AC SYSTEMS SHOWN |
| | OR REFERENCED ON THE PLANS. |
| | |
| | 7) SHOW THE LOCATION OF THE AIR HANDLER SUPPLYING THE |
| | LOBBIES AND STORAGE ROOMS, AND PROVIDE SUPPLY CFMS AT |
| | ALL DIFFUSERS ND GRILLS SHOWN IN THOSE AREAS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |