| 2016-08-23 11:09:23 | 1ST REVIEW FBC-2014 MECHANICAL, EXISTING, ENERGY |
| | CONSERVATION CODES |
| | PERMIT #16080368 |
| | 8/23/16 |
| | |
| | 1) SHEET M-1: THE HEAT LOAD SUMMARY INDICATES THE RTU |
| | EQUIPMENT SELECTIONS EXCEED THE CALCULATED COOLING AND |
| | HEATING LOADS- SECTION C403.2.2 FBC-14 ENERGY |
| | CONSERVATION. |
| | |
| | 2) M-1: REFER TO SECTION C403.2.1 AND PROVIDE AC DESIGN |
| | LOADS IN ACCORDANCE WITH ASHRAE/ACCA STANDARD 183. LOAD |
| | SUMMARIES MEETING THE EXCEPTION UNDER C403.2.1 SHALL |
| | INCLUDE ITEMS 1-13, AND BE SUBMITTED AN A SIGNED AND |
| | SEALED SHEET BY THE EOR. |
| | |
| | 3) THE PROPOSED PROJECT IS DEFINED AS A RENOVATION PER |
| | SECTION 202 FBC-14 ENERGY CONSERVATION. REFER TO |
| | SECTIONS C101.4.3 AND C401.2 AND PROVIDE AN ENERGY |
| | EFFICIENCY COMPLIANCE SUBMITTAL. PLEASE INCLUDE |
| | COMPLIANCE DATA FOR THE DUCTWORK ON THE PLAN AND THE |
| | CALCS. |
| | |
| | 4) M-2: THE DUCTWORK LAYOUT PLAN APPEARS TO INDICATE A |
| | RETURN AIR PLENUM ABOVE THE CEILING- PLEASE SEE SECTION |
| | C402.4.9 AND TABLE C403.2.7.2 FBC-14 ENERGY |
| | CONSERVATION FOR COMPLIANCE INFORMATION. PLEASE NOTE |
| | THAT SHEET 08 SHOWS INSULATION INSTALLED ON THE |
| | SUSPENDED CEILING- REFER TO SECTION C402.2.1. |
| | |
| | 5) THIS REVIEW IS STOPPED PENDING THE ARCHITECT'S |
| | RESPONSES TO BUILDING REVIEW COMMENT #4C REGARDING WHAT |
| | TYPE OF MEDICAL FACILITY IS BEING PROPOSED. THE |
| | ARCHITECT'S RESPONSE TO THAT COMMENT MAY GENERATE THE |
| | NEED FOR FURTHER MECHANICAL COMPLIANCES AND REVIEW. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |