| Date |
Text |
| 2016-08-26 12:30:23 | 1ST REVIEW |
| | |
| | |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER LL |
| | CITY OF WEST PALM BEACH |
| | DEVELOPMENT SERVICES |
| | BUILDING DIVISION |
| | 561-805-6711 |
| | [email protected] |
| | |
| | |
| | PLUMBING COMMENTS: |
| | |
| | 1. SHT. A-3 THE DETAIL # 6 DOES NOT COMPLYY WITH THE |
| | FLORIDA ACCESSIBILITY CODE 2014 IT SHA COMPL WITH FBC |
| | ACC. SEC 606 AND 604. |
| | |
| | 2. THE LAVATORY IN THE BATH ROOM SHALL COMPLY WITH FBC |
| | PL. 416.5 TEMPERED WATER FOR PUBLIC HAND-WASHING |
| | FACILITIES. |
| | TEMPERED WATER SHALL BE DELIVERED FROM LAVATORIES AND |
| | GROUP WASH FIXTURES LOCATED IN PUBLIC TOILET FACILITIES |
| | PROVIDED FOR CUSTOMERS, PATRONS AND VISITORS. TEMPERED |
| | WATER SHALL BE DELIVERED THROUGH AN APPROVED |
| | WATER-TEMPERATURE LIMITING DEVICE THAT CONFORMS TO ASSE |
| | 1070 OR CSA B125.3. |
| | |
| | 3. THE FIXTURE DRAIN FOR WASHING MACHINE SHALL BE 3IN. |
| | PER FBC PL 406.2 |
| | |
| | 4. THE STACK FOR THE WASHING MACHINE SHALL BE VENTED. |
| | PER FBC PL 901.2-901.2.1 |
| | |
| | 5. WATER SUPPLY'S FOR THE WASHING MACHINE SHALL COMPLY |
| | WITH FBC PL 604.9 WATER HAMMER. |
| | THE FLOW VELOCITY OF THE WATER DISTRIBUTION SYSTEM |
| | SHALL BE CONTROLLED TO REDUCE THE POSSIBILITY OF WATER |
| | HAMMER. A WATER-HAMMER ARRESTOR SHALL BE INSTALLED |
| | WHERE QUICK-CLOSING VALVES ARE UTILIZED. WATER-HAMMER |
| | ARRESTORS SHALL BE INSTALLED IN ACCORDANCE WITH THE |
| | MANUFACTURER?S INSTRUCTIONS. WATER-HAMMER ARRESTORS |
| | SHALL CONFORM TO ASSE 1010. 6. |
| | |
| | 6. A MINIMUM OF 1 VENT SHALL EXTEND THROUGH THE ROOF. |
| | PER FBC PL 904.1 REQUIRED VENT EXTENSION. |
| | THE VENT SYSTEM SERVING EACH BUILDING DRAIN SHALL HAVE |
| | NOT LESS THAN ONE VENT PIPE THAT EXTENDS TO THE |
| | OUTDOORS. |
| | |
| | 7. THE FIXTURE BRANCH FOR THE TOILET SHALL BE A MINIMUM |
| | OF 3IN. PER FBC PL 420.3 |
| | |
| | 8. THE HOT WATER SYSTEM SHALL COMPLY WITH FBC PL |
| | 607.3 THERMAL EXPANSION CONTROL. |
| | A MEANS OF CONTROLLING INCREASED PRESSURE CAUSED BY |
| | THERMAL EXPANSION SHALL BE PROVIDED WHERE REQUIRED IN |
| | ACCORDANCE WITH SECTIONS 607.3.1 AND 607.3.2 |
| | AND |
| | 607.2 HOT OR TEMPERED WATER SUPPLY TO FIXTURES. |
| | THE DEVELOPED LENGTH OF HOT OR TEMPERED WATER PIPING, |
| | FROM THE SOURCE OF HOT WATER TO THE FIXTURES THAT |
| | REQUIRE HOT OR TEMPERED WATER, SHALL NOT EXCEED 50 FEET |
| | (15 240 MM). RECIRCULATING SYSTEM PIPING AND |
| | HEAT-TRACED PIPING SHALL BE CONSIDERED TO BE SOURCES OF |
| | HOT OR TEMPERED WATER. |
| | |
| | 9. SHOW PIPE SIZES ON THE PIPING FOR THE BATHROOM |
| | GROUP. WPB AMEND TO FBC 107.2.1 |
| | |
| | 10. SHOW PIPE SIZES ON THE PIPING FOR THE WATER RISER. |
| | WPB AMEND TO FBC 107.2.1 |
| | |
| | 11. SHOW THE COLD WATER MAIN AND SHUT OFF ON THE WATER |
| | RISER |
| | . WPB AMEND TO FBC 107.2.1 |
| | |
| | DUE TO THE DEFICIENCIES OF THIS PLAN A COMPLETE AND |
| | THOROUGH REVIEW CANNOT BE DONE AT THIS TIME. UPON |
| | RESUBMITTAL THERE MAYBE ADDITIONAL COMMENTS. |
| | |
| | WHEN RESUBMITTING PLANS, REMOVE AND REPLACE ANY PAGES |
| | AS NECESSARY. A NARRATIVE LISTING THE ORIGINAL REVIEW |
| | COMMENT NUMBER WITH A DESCRIPTION OF THE CHANGES MADE |
| | AND IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| | THE CHANGE CAN BE FOUND WILL HELP EXPEDITE THE REVIEW. |
| | |
| | |
| | |
| | |
| | |