| Plan Review Notes For Permit 16080187 |
| Permit Number |
16080187 |
|
| Review Stop |
E |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2016-08-10 10:28:56 | DENIED BY ELECTRIC | | | | | | 1) SUBMIT ELECTRICAL LOAD CALCULATIONS THAT INCLUDE THE | | | PROPOSED 120,000 BTU HEAT PUMP. THE CALCULATIONS ARE | | | REQUIRED TO HAVE THE ADDRESS OF THE JOB, AS WELL AS, | | | THE NAME AND SIGNATURE OF THE PERSON RESPONSIBLE FOR | | | THE CALCULATIONS ON THEM. FBCR-E3602.2 |
|