| Date |
Text |
| 2017-06-20 06:15:00 | 1) SHT. A5.08 - ACCESSIBLE RESTROOM FIXTURE LEGEND - |
| | THE TOILET PAPER DISPENSER SHALL BE LOCATED 7-9 INCHES |
| | FROM THE FRONT OF THE WATER CLOSET TO THE CENTERLINE OF |
| | THE FIRST TOILET PAPER DISPENSER, NOT TO THE CENTERLINE |
| | OF THE UNIT AS SHOWN. 2014 FBC-ACCESS. SEC.604.7. |
| | 2) SHT.A6.15 - USABLE BATHROOM FIGURES - IDENTIFY ON |
| | THE PLANS WHICH BATHROOMS ARE DESIGN SPECIFICATION "A" |
| | OR "B" OF THE FHA. THIS SHEET HAS NOT BEEN REVISED AS |
| | NOTED IN THE RESPONSE NARRATIVE. 2ND REQUEST. |
| | 3) SUBMIT A SEPARATE LETTER FROM THE DESIGN |
| | PROFESSIONAL OF RECORD STATING THAT SANITARY FACILITIES |
| | FOR THE MAINTENANCE WORKERS ARE LOCATED WITHIN 500 FEET |
| | OF THE TRASH ROOMS, MAINTENANCE ROOMS, ETC., PER 2014 |
| | FBC-PLUMBING SEC.403.3.3. |
| | 4) SUBMIT MANUFACTURER'S SPECIFICATIONS/INSTALLATION |
| | MANUAL FOR THE OIL SMART PUMP SYSTEM IN THE ELEVATOR |
| | SHAFT.WPB AMEND. TO FBC SEC. 107.2.1.2ND REQUEST. |
| | 5) SUBMIT CALCULATIONS AS TO HOW YOU ARRIVED AT THE |
| | SIZE OF THE SCHIER LAUNDRY INTERCEPTOR.2014 |
| | FBC-PLUMBING.2ND REQUEST. |
| | 6) ACCESS SHALL BE PROVIDED TO THE WATER SUPPLY VALVES |
| | FOR THE STACKED WASHERS/DRYERS. I COULD NOT FIND THE |
| | REVISED NOTE ON THE PLANS. CLARIFY. 2014 FPC |
| | SEC.606.3.2ND REQUEST |
| | 7) SHT. P4.05 - A URINAL IS NOT PERMITTED ON A WET |
| | VENT. 2014 FBC-PLUMBING SEC.912.1, 912.1.1. THE ADDED |
| | STACK APPEARS TO HAVE A CLEANOUT ON IT BUT NO URINAL. |
| | CLARIFY. |
| | 8) SHT.P2.05 - THE MEN'S AND WOMENS RESTROOMS ACROSS |
| | FROM THE EXERCISE ROOM ARE STILL MISLABELED.THE SAME |
| | ISSUE OCCURS ON SHT. P2.05B AND ON THE ENLARGED PLAN ON |
| | P2.05B AND ALSO THERE ARE NO PLUMBING FIXTURES SHOWN IN |
| | THE MEN'S RESTROOM ON SHT. P2.05B. |
| | 9) THE LOCATION OF THE SANITARY RISERS S/24 & S/25 ON |
| | SHT. P2.05 B ARE REVERSED AS TO THE LAYOUT ON |
| | SHT.P4.05. BUILDING # II, SEE UNIT B1. |
| | 10) THE LOCATION OF SANITARY RISERS S/24 & S/25 ON |
| | SHT.SHT. P2.05 A DOES NOT CORRELATE WITH THE LOCATION |
| | SHOWN ON SHT. P4.05.THE RISERS ARE REVERSED. |
| | 11) SUBMIT A DETAIL FOR THE SUB-WATER METERS IF THEY |
| | ARE BEING INSTALLED IN THESE BUILDINGS. SHOW THE |
| | LOCATION OF THE SUB-METERS IF APPLICABLE. MATERIALS |
| | PLACED WITHIN RETURN AIR PLENUMS SHALL BE |
| | NONCOMBUSTIBLE OR SHALL BE LISTED AND LABELED AS HAVING |
| | A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A |
| | SMOKE-DEVELOPED INDEX OF NOT MORE THAN 50 WHEN TESTED |
| | IN ACCORDANCE WITH ASTM E84 OR UL 723.2014 |
| | FBC-MECHANICAL SEC. 602.2.1. |
| | 12) SHT. P4.06 - A SHUTOFF VALVE IS REQUIRED ON THE 2 |
| | INCH WATER MAIN SUPPLY TO THE AMENITIES/LEASING AREA |
| | PER 2014 FBC-PLUMBING SEC.606.2. |
| | 13) SHT.P1.00 - THE ORIENTATION OF BUILDING II IN |
| | RELATION TO THE POINT OF COMPASS ON THE PLAN DOES NOT |
| | CORRELATE WITH THE ORIENTATION OF BUILDING II ON SHT. |
| | P2.05. CLARIFY. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |
| | |