| Date |
Text |
| 2016-10-14 15:32:49 | 1ST REVIEW FBC-2014 MECHANICAL |
| | PERMIT #16070946 |
| | 10/14/16 |
| | |
| | 1) 2ND REQUEST FOR COMPLETE VENTILATION CALCULATIONS. |
| | THE CALCULATIONS ON SHEET M001 ARE INCORRECT AND DO NOT |
| | INCLUDE THE ISOLATION ROOM, THE SOIL ROOM, THE CLEAN |
| | ROOM, THE NOUR ROOM, THE NURSES STATION, THE STAFF |
| | LOUNGE, THE LOBBY, AND THE PLAYROOM - PLEASE REFER TO |
| | TABLE 7-1 ASHRAE 170 AND SHOW THE DESIGN PARAMTERS FOR |
| | EACH ROOM OR SPACE ( PLEASE NOTE THAT VENTILATION RATES |
| | FOR SOME OF THE ROOMS AND AREAS WILL BE FOUND IN TABLE |
| | 403.3 FBC-14 MECHANICAL) . THE AIR CHANGE RATES SHOWN |
| | FOR THE PATIENT ROOM, THE EXAM ROOM, AND THE MEDS ROOM |
| | ON M001 ARE INSUFFICENT PER TABLE 7-1. |
| | |
| | 2) SHEET M131: THERE APPEARS TO BE MANY DAMPERS MISSING |
| | FOR DUCTS PENETRATING FIRE-RATED WALLS AND SMOKE |
| | PARTITIONS INCLUDING, BUT NOT LIMITED TO DUCTS |
| | PENETRATING THE FOLLOWING LIST OF COMMON WALLS: A) |
| | ISOLATION/CORRIDOR WALL, B) PATIENT ROOM 304/WAITING |
| | ROOM WALL. C) CORRIDOR/PATIENT ROOM 305 WALL. D) |
| | MEDS/NURSES STATION E) CORRIDOR/ADA ROOM WALL. F) |
| | CORRIDOR/EXAM ROOM WALL. G) CORRIDOR/TLT 325A ROOM |
| | WALL. H) THE O/A DUCTS PENETRATING CORRIDOR/PATIENT |
| | ROOMS. PLEASE PROVIDE DAMPER SYMBOLS AT THE SPECIFIED |
| | LOCATIONS AND ANY OTHER LOCATIONS THAT REQUIRE |
| | PROTECTION FOR THE DUCTS. PLEASE SEE SECTION 607 AND |
| | PROVIDE EQUIPMENT SCHEDULES FOR THE FIRE AND SMOKE |
| | DAMPERS, INSTALLATION DETAILS FOR EACH TYPE, AND |
| | LOCATIONS OF ACCESS PANELS TO DAMPERS (WHERE REQUIRED). |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |