| Date |
Text |
| 2016-07-29 15:53:22 | 1ST REVIEW MECHANICAL- FBC-2014 |
| | PERMIT #16070837 |
| | 7/29/16 |
| | |
| | 1) SHEETS A2.01A & M1.01: THE PLANS APPEAR TO INDICATE |
| | AN ENCLOSED PARKING GARAGE WHICH IS REQUIRED TO HAVE AN |
| | EXHAUST VENTILATION SYSTEM PER SECTION 406.6.2 FBC-14 |
| | BUILDING. PROVIDE A SYSTEM DESIGNED IN ACCORDANCE WITH |
| | SECTION 404.1, 404.2, & 404.3.FBC-14 MECHANICAL. |
| | |
| | 2) A2.01A: PROVIDE AN EXHAUST SYSTEM FOR THE TRASH ROOM |
| | PER TABLE 6-4 ASHRAE 62.1-2010. |
| | |
| | 3) A2.01B: THE PLAN INDICATES A MECHANICAL ROOM IN THE |
| | BASEMENT. PLEASE SHOW ALL EQUIPMENT AND PROVIDE |
| | EQUIPMENT LISTS AND SCHEDULES. |
| | |
| | 4) M-1.00: SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE |
| | DRYER WITH REVIEW SIGNATURE BY THE ENGINEER OF RECORD. |
| | |
| | 5) M-1.00 & M-1.01: CLARIFY WHERE THE AIR INLET OPENING |
| | IS LOCATED FOR THE FCU-A OUTDOOR AIR DUCT. |
| | |
| | 6) M-1.01: A DUCT SMOKE DETECTOR IS REQUIRED IN THE |
| | RETURN AIR SYSTEM OF FCU-B- SECTION 606.2.1. |
| | |
| | 7) M-1.01: THE 24X48 RETURN GRILL APPEARS UNDERSIZED |
| | FOR THE 3440 CFMS (ADJUSTED TO 2992 CFMS USING |
| | PERCENTAGE OF OUTDOOR AIR) OF SUPPLY AIR SHOWN ON THE |
| | PLAN. THE INDUSTRY STANDARD IS TYPICALLY 200 SQ. INCHES |
| | PER TON. |
| | |
| | 8) M-3.01: REFER TO SECTION C404.2.2 FBC-14 ENERGY |
| | CONSERVATION: THE COOLING AND HEATING OUTPUT CAPACITIES |
| | OF FCU-B EXCEED THE SYSTEM SUMMARY LOADS CALCULATED BY |
| | THE EOR. |
| | |
| | 9) M-3.01:THE COOLING AND HEATING CAPACITIES OF FCU-1 & |
| | FCU-2 EXCEED THE SYSTEM SUMMARY LOADS CALCULATED FOR |
| | 2ND, 3RD, AND 4TH FLOOR SUITES. A) THE HEATING |
| | CAPACITIES OF FCU-1 & FCU-2 EXCEED THE SYSTEM SUMMARY |
| | LOADS CALCULATED FOR THE 5TH FLOOR SUITES- SECTION |
| | C404.2.2. |
| | |
| | 10) M-3.01: THE AC UNIT SCHEDULE DOES NOT LIST THE |
| | TOTAL CFMS OF SUPPLY AIR FOR FCU-1 & FCU-2. |
| | |
| | 11 ) M-2.01: PLEASE LABEL THE AC SYSTEMS AS EITHER |
| | FCU-1 OR 2. |
| | |
| | 12) M-2.01: THE RETURN AIR GRILLS APPEAR UNDERSIZED FOR |
| | THE AMOUNT OF SUPPLY AIR FOR EACH SYSTEM, WITH |
| | ADJUSTMENT FACTOR FOR OUTDOOR AIR. THE INDUSTRY |
| | STANDARD IS TYPICALLY 200 SQ. INCHES PER TON. |
| | |
| | 13) M-2.01: MOTORIZED DAMPERS ARE REQUIRED FOR THE |
| | OUTDOOR AIR SUPPLY TO THE GUEST SUITE SYSTEMS- SECTION |
| | C403.2.4.4. |
| | |
| | 14) M-3.01: PROVIDE EXHAUST VENTILATION CALCULATIONS |
| | FOR THE JANITOR AND STORAGE ROOMS- TABLE 403.3. |
| | |
| | 15) M-3.01: A VENTILATION RATE OF 0.48 CFMS PER SQ. FT. |
| | IS REQUIRED FOR SWIMMING POOLS AND POOL DECK AREAS PER |
| | TABLE 403.3, HOWEVER IT APPEARS THAT THE POOLS ARE OPEN |
| | PARTIALLY ON ONE SIDE TO THE OUTDOORS. PLEASE PROVIDE A |
| | CALCULATION FOR NATURAL VENTILATION IF APPLICABLE. |
| | |
| | 16) M-4.01, REFRIGERANT PIPING RISERS: PLEASE INDICATE |
| | THE TYPE OF PIPING, PIPE SIZES, AND THE LENGTHS OF THE |
| | PIPING RUNS. VERIFY COMPLIANCE WITH MANUFACTURER'S |
| | SPECIFICATIONS AND INSTALLATION INSTRUCTIONS. |
| | |
| | 17) M-4.02: PROVIDE SITE SPECIFIC WIND LOAD ENGINEERING |
| | FOR ALL ROOFTOP MECHANICAL EQUIPMENT INCLUDING CU-A & B |
| | WHICH ARE NOT SHOWN IN THE DRAWING- SECTION 301.15. |
| | SUBMIT NOA #15-0902.05 WITH SHOP DRAWING APPROVAL |
| | SIGNATURE BY THE EOR. |
| | |
| | 18) PROVIDE A SUBMITTAL PACKAGE FOR MECHANICAL |
| | EQUIPMENT THAT INCLUDING BUT NOT LIMITED TO THE AC |
| | SYSTEMS, MOTORIZED DAMPERS, DUCT SMOKE DETECTORS, FIRE |
| | DAMPERS, THE WATER HEATERS AND FLUE EXHAUST/AIR INTAKE |
| | DUCTS, LOUVERS ETC. PLEASE NOTE A FLORIDA PRODUCT |
| | APPROVAL AND/OR A MIAMI-DADE NOA MUST BE SUBMITTED FOR |
| | THE LOUVERS SHOWN AT THE JANITOR'S CLOSETS. |
| | |
| | 19) PLEASE INDICATE THE LOCATIONS OF THE POOL HEATERS |
| | AND PROVIDE EQUIPMENT SCHEDULES AND MANUFACTURER'S |
| | SPECIFICATIONS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |