| 2016-11-23 06:50:59 | ****CORRECTIONS**** |
| | |
| | SAMANTHA HILL |
| | BUILDING PLANS EXAMINER |
| | [email protected] |
| | 561-805-6724 |
| | |
| | 14. SPECIFY ACCESSIBLE MEANS OF EGRESS SELECTED, FBC |
| | BUILDING 1007, FBC ACCESSIBILITY 207. REVISE PLAN TO |
| | SHOW COMPLIANCE WITH METHOD SELECTED IF ALL ITEMS ARE |
| | NOT IMMEDIATELY APPARENT (FOR EXAMPLE, IBC2000 ELEVATOR |
| | AS MEANS OF EGRESS COMPONENT). |
| | |
| | 2ND REVIEW, IT IS NOT CLEAR WHICH METHOD WAS SELECTED. |
| | RESPONSE STATES STAIRS ARE THE ACCESSIBLE MEANS OF |
| | EGRESS. |
| | |
| | APPLICABLE TO THE TRANSIT PORTION OF THIS BUILDING, SEE |
| | FBC 1007, ACCESSIBLE MEANS OF EGRESS SHALL BE PROVIDED |
| | IN ACCORDANCE WITH THE APPLICABLE SECTIONS OF THE FBC |
| | ACCESSIBILITY. |
| | |
| | FBC ACCESSIBILITY 207, MEANS OF EGRESS SHALL COMPLY |
| | WITH IBC 2000 WITH 2001 SUPPLEMENT 1003.2.13 OR IBC |
| | 2003 1007. |
| | |
| | YOU MAY FIND THIS SITE HELPFUL: |
| | |
| | HTTPS://WWW.ACCESS-BOARD.GOV/GUIDELINES-AND-STANDARDS/B |
| | UILDINGS-AND-SITES/ABOUT-THE-ADA-STANDARDS/GUIDE-TO-THE |
| | -ADA-STANDARDS/CHAPTER-4-ACCESSIBLE-MEANS-OF-EGRESS?TMP |
| | L=COMPONENT&PAGE= |
| | |
| | REVISE PLAN TO CLARIFY COMPLIANCE. |
| | |
| | 15. A200 REGARDING SIGNAGE ITEM 2; CLARIFY ACCESSIBLE |
| | MEANS OF EGRESS SELECTED AND REVISE NOTE IF APPLICABLE. |
| | |
| | RESPONSE STATES REVISION IS NOT NECESSARY; THIS ITEM |
| | NOT REVIEWED AT THIS TIME PENDING RESPONSE TO ITEM 14. |
| | |
| | 16 - 26, OK. |
| | |
| | 27. SEE PLUMBING COMMENTS REGARDING ACCESSIBILITY AND |
| | FAIR HOUSING AND REVISE PLAN TO SHOW COMPLIANCE. |
| | DISREGARD IF COMMENT IS NOT APPLICABLE. |
| | |
| | 28 - 31. OK |
| | |
| | |
| | 32. REVISE PLAN TO SHOW THE 18IN MANEUVERING CLEARANCE, |
| | PULL SIDE (FBC ACCESSIBILITY 404.2.4), DOOR LOCATED ON |
| | SHEET A301, DOOR R03H (FBC 5TH ED. ACCESSIBILITY |
| | 206.4.5), OR OTHERWISE INDICATE THAT THIS WILL NOT BE |
| | THE ONLY DOOR SERVING A TENANT SPACE, OR PROVIDE AN |
| | OPENER. |
| | |
| | 2ND REVIEW, THIS WAS DISCUSSED, BUT IT IS NOT CLEAR HOW |
| | THIS WAS ADDRESSED. PLAN HAS BEEN REDLINED (18IN |
| | REQUIRED), AND WHEN SCALED APPEARS COMPLIANT. NO ACTION |
| | REQUIRED UNLESS THIS SHEET IS REVISED FOR OTHER |
| | REASONS. |
| | |
| | 33 - 40. OK |
| | |
| | 41. STANDBY POWER, FBC 403.4.8, EMERGENCY POWER 403.4.9 |
| | REQUIRED. |
| | |
| | 2ND REVIEW, THE SPECIFICATION BOOK WAS NOT REVIEWED AND |
| | IS CONSIDERED SUPPLEMENTARY TO THE PLANS. THIS ITEM |
| | WILL BE A PROVISO BUT CLARIFICATION REGARDING THE |
| | ELEVATOR(S) REQUIRED FOR THE ACCESSIBLE MEANS OF EGRESS |
| | IS REQUESTED. |
| | |
| | 42-50. OK |
| | |
| | 51. SMOKE CONTROL REFERENCED, BUT REPORT NOT PROVIDED, |
| | FBC 909.4. |
| | |
| | SEE MECHANICAL COMMENTS AND ADDRESS ACCORDINGLY. |
| | |
| | 52. OK |
| | |
| | 53. THIS PERMIT WILL BE ISSUED WITH THE FOLLOWING |
| | PROVISOS: |
| | |
| | A. PROVISO: TCO AT EACH PHASE IS SUBJECT TO APPROVAL OF |
| | THE BUILDING OFFICIAL (OR HIS REPRESENTATIVE) AND FIRE |
| | DEPARTMENT, AND MAY INCLUDE ITEMS NOT WITHIN THE SCOPE |
| | OF THIS REVIEW. A TCO REQUEST FORM AND FEE WILL BE |
| | REQUIRED. THIS FORM IS AVAILABLE UPON REQUEST BY EMAIL. |
| | |
| | C. SEPARATE PERMITS (APPLICATION, PLANS, REVIEWS, AND |
| | FEES) REQUIRED FOR ALL ITEMS OTHER THAN MECHANICAL, |
| | ELECTRICAL, AND PLUMBING FOR THE BUILDING AS SHOWN ON |
| | THE PLANS. THIS INCLUDES SIGNS, FIRE ALARM, FIRE |
| | SPRINKLERS, LANDSCAPING. |
| | |
| | SUB PERMITS (APPLICATION, SUB PERMIT FEE) ARE REQUIRED |
| | FOR MECHANICAL, ELECTRICAL, AND PLUMBING PRIOR TO |
| | COMMENCEMENT OF WORK. |
| | |
| | A ROOFING SUB PERMIT IS REQUIRED PRIOR TO COMMENCEMENT |
| | OF ROOFING WORK. AS ROOF DOCUMENTS HAVE NOT BEEN |
| | PROVIDED, THIS IS A DEFERRED SUBMITTAL. PRODUCT |
| | APPROVALS REVIEWED BY DESIGNER OF RECORD, SELECTED |
| | ASSEMBLY, ENGINEERING IF APPLICABLE ARE TO BE SUBMITTED |
| | AS A REVISION WITH A ROOF PERMIT APPLICATION. |
| | |
| | D. COMPONENTS AND CLADDING PRODUCT APPROVALS ARE TO BE |
| | REVIEWED BY DESIGNER OF RECORD AND SUBMITTED AS A |
| | REVISION PRIOR TO INSTALLATION. |
| | |
| | E. PROVISO, THIS STUCTURE SERVES A BUILDING WHICH HAS |
| | NOT BEEN REVIEWED BY THIS DEPARTMENT (TRAIN STATION). |
| | ACCESSIBLE ROUTE IN COMPLIANCE WITH FBC 5TH EDITION |
| | ACCESSIBILITY IS REQUIRED AND WILL BE VERIFIED IN THE |
| | FIELD. |
| | |
| | F. PROVISO, THE PROJECT MANUAL HAS NOT BEEN REVIEWED. |
| | DOOR HARDWARE TO COMPLY WITH FBC BUILDING, FBC |
| | ACCESSIBILITY. |
| | G. PROVISO, ALL DOORS AND GATES IN THE MEANS OF EGRESS |
| | FOR ASSEMBLY OCCUPANCY ARE TO INCLUDE PANIC DEVICES OR |
| | FIRE EXIT HARDWARE, FBC 1008. |
| | H. PROVISO, PRODUCT APPROVALS FOR COMPONENTS AND |
| | CLADDING HAVE NOT BEEN SUBMITTED. THEY MAY BE |
| | SUBMITTED, PRIOR TO INSTALLATION, AS A REVISION, PRIOR |
| | TO INSTALLATION. |
| | |
| | I. PROVISO, FLOORING UNDERLAYMENT IS TO COMPLY WITH FBC |
| | 1207.2, 1207.3, AND 603.1. THIS MAY BE A DEFERRED |
| | SUBMITTAL. IF DEFERRED, THE TEST REPORTS ARE TO BE |
| | SUBMITTED AS A REVISION PRIOR TO INSTALLATION. AS |
| | STRUCTURAL PLANS SHOW AN 8 INCH SLAB, PRODUCTS TESTED |
| | WITH EITHER A 6 INCH OR AN 8 INCH SLAB ARE ACCEPTABLE. |
| | |
| | A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING |
| | DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR |
| | SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS |
| | (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR |
| | BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90. |
| | THE TEST REPORT CANNOT INCLUDE A DROPPED GYPSUM |
| | CEILING. PROVIDE A COPY OF THE TEST REPORT. |
| | |
| | B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN |
| | DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC |
| | OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN |
| | IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN |
| | 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH |
| | ASTM E 492. THE TEST REPORT CANNOT INCLUDE A DROPPED |
| | GYPSUM CEILING. PROVIDE A COPY OF THE TEST REPORT. |
| | |
| | C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE |
| | BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL |
| | INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID |
| | DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED |
| | TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE |
| | 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84 |
| | OR UL 723. |
| | |
| | |