| Date |
Text |
| 2016-09-08 14:57:10 | 1ST REVIEW |
| | |
| | |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER LL |
| | CITY OF WEST PALM BEACH |
| | DEVELOPMENT SERVICES |
| | BUILDING DIVISION |
| | 561-805-6711 |
| | [email protected] |
| | |
| | |
| | GAS COMMENTS: |
| | |
| | 1. SHOW ALL CUT SECTIONS OF PIPE AND CORRESPONDING |
| | LENGTHS PER FBC-2014 FUEL GAS, SECS. 402.4.1, 402.4.2. |
| | |
| | 2. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS FOR ALL |
| | GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA |
| | 54, NFPA 58, AND FBC-2014 FUEL GAS SEC. 402.2 |
| | |
| | 3. THE SYSTEM IS TO BE DESIGNED AND SIZED PER IFGC 2014 |
| | OR FBC FG 2014 5TH EDITION. CHECK TABLE NUMBERS THEY |
| | HAVE CHANGED. |
| | |
| | 4. PROVIDE SHUT OFF AND DRIP LEG AT EACH APPLIANCE. PER |
| | FBC FG |
| | 408.4 SEDIMENT TRAP. |
| | WHERE A SEDIMENT TRAP IS NOT INCORPORATED AS PART OF |
| | THE APPLIANCE, A SEDIMENT TRAP SHALL BE INSTALLED |
| | DOWNSTREAM OF THE APPLIANCE SHUTOFF VALVE AS CLOSE TO |
| | THE INLET OF THE APPLIANCE AS PRACTICAL. THE SEDIMENT |
| | TRAP SHALL BE EITHER A TEE FITTING HAVING A CAPPED |
| | NIPPLE OF ANY LENGTH INSTALLED VERTICALLY IN THE |
| | BOTTOMMOST OPENING OF THE TEE AS ILLUSTRATED IN FIGURE |
| | 408.4 OR OTHER DEVICE APPROVED AS AN EFFECTIVE SEDIMENT |
| | TRAP. ILLUMINATING APPLIANCES, RANGES, CLOTHES DRYERS, |
| | DECORATIVE VENTED APPLIANCES FOR INSTALLATION IN VENTED |
| | FIREPLACES, GAS FIREPLACES, AND OUTDOOR GRILLS NEED NOT |
| | BE SO EQUIPPED. |
| | 409.5 APPLIANCE SHUTOFF VALVE. |
| | EACH APPLIANCE SHALL BE PROVIDED WITH A SHUTOFF VALVE |
| | IN ACCORDANCE WITH SECTION 409.5.1, 409.5.2 OR 409.5.3. |
| | |
| | 5. PROVIDE LENGTH AND SIZE OF PIPING TO POOL EQUIPMENT. |
| | PER FBC-2014 FUEL GAS, SECS. 402.4.1, 402.4.2. |
| | |