2016-08-17 18:33:41PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE PLANS DO NOT MATCH THE LOAD CALCULATIONS. AIR
 HANDLER NUMBER 3 IS 21,756 BTUH IN THE LOAD CALCS. AND
 THE EQUIPMENT SCHEDULE LISTS 36,100 BTUH. THE CFMS IN
 THE LOAD CALCS. IS 725 AND THE EQUIPMENT SCHEDULE HAS
 1200 CFMS. FBC 107.2.1
  
 2) THE SIZE OF THE SUPPLY AND RETURN GRILLS ARE NOT
 SPECIFIED ON THE FIRST FLOOR MECHANICAL PLAN. THE CFMS
 ARE NOT SPECIFIED FOR THE SUPPLIES ON THE FIRST FLOOR
 MECHANICAL PLAN. FBC 107.2.1
  
 3) SPECIFY THE SIZES OF THE SUPPLY AND RETURN DUCTS
 FROM THE AIR HANDLER UP TO THE SECOND FLOOR. CLARIFY ON
 THE DRAWINGS HOW THE SUPPLY AND RETURN DUCTS WILL BE
 ROUTED FROM THE AIR HANDLER IN THE GARAGE TO THE SECOND
 FLOOR. FBC 107.2.1 IT APPEARS THAT THE SUPPLY AND
 RETURN DROPS ARE TIED TO THE SAME DUCT. PLEASE PROVIDE
 A DRAWING THAT WILL CLARIFY.
  
 4) THE AHU MOUNTING DETAIL FOR AHU-3 IS INCORRECTLY
 LABELED AS AHU-1. THIS DRAWING DOES NOT MATCH THE
 PROPOSED HVAC SYSTEM. FBC 107.2.1
  
 5) THE FIRST FLOOR PLANS INDICATE FLEX DUCT IN THE
 GARAGE THAT PENETRATE THE GARAGE WALLS. FBCR 302.5.2
 REQUIRES DUCTS LOCATED IN THE GARAGE AND DUCTS
 PENETRATING THE WALLS OR CEILINGS SEPARATING THE
 DWELLING FROM THE GARAGE TO BE CONSTRUCTED OF A MINIMUM
 NO.26 GAGE SHEET STEEL, 1 INCH MINIMUM RIGID
 NONMETALLIC CLASS 0 OR CLASS 1 DUCT BOARD OR OTHER
 APPROVED MATERIAL AND SHALL HAVE NO OPENINGS INTO THE
 GARAGE.
  
 6) THE ENERGY COMPLIANCE REPORT, FORM R405-2014 IS
 REQUIRED TO BE SIGNED AND DATED BY THE OWNER/AGENT. FBC
 ENERGY CONSERVATION SECTION R103.1.1.2
  
 7) IN ORDER TO TAKE THE CEILING FAN CREDIT, THE FAN
 BLADE DIAMETERS SHALL BE SPECIFIED ON THE PLANS TO SHOW
 COMPLIANCE WITH FBC ENERGY CONSERVATION SECTION
 R405.7.6.
  
 8) PLEASE EXPLAIN WHY THERE ARE TWO CENTRAL HEATING AND
 COOLING SYSTEMS SPECIFIED ON THE ENERGY COMPLIANCE FORM
 IF ONLY THE ADDITION ALONE IS BEING USED TO SHOW
 COMPLIANCE. OTHERWISE THE EXISTING BUILDING AND
 ADDITION SHALL COMPLY AS A SINGLE BUILDING. FBC ENERGY
 CONSERVATION SECTION R101.4.3
  
 9) IN ORDER TO REDUCE PLAN REVIEW TIME, PLEASE SUBMIT A
 RESPONSE LETTER INDICATING HOW EACH OF THE REVIEW
 COMMENTS HAS BEEN ADDRESSED.
  
  
  