| 2016-08-17 18:33:41 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 1ST REVIEW: FBC FIFTH EDITION (2014) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) THE PLANS DO NOT MATCH THE LOAD CALCULATIONS. AIR |
| | HANDLER NUMBER 3 IS 21,756 BTUH IN THE LOAD CALCS. AND |
| | THE EQUIPMENT SCHEDULE LISTS 36,100 BTUH. THE CFMS IN |
| | THE LOAD CALCS. IS 725 AND THE EQUIPMENT SCHEDULE HAS |
| | 1200 CFMS. FBC 107.2.1 |
| | |
| | 2) THE SIZE OF THE SUPPLY AND RETURN GRILLS ARE NOT |
| | SPECIFIED ON THE FIRST FLOOR MECHANICAL PLAN. THE CFMS |
| | ARE NOT SPECIFIED FOR THE SUPPLIES ON THE FIRST FLOOR |
| | MECHANICAL PLAN. FBC 107.2.1 |
| | |
| | 3) SPECIFY THE SIZES OF THE SUPPLY AND RETURN DUCTS |
| | FROM THE AIR HANDLER UP TO THE SECOND FLOOR. CLARIFY ON |
| | THE DRAWINGS HOW THE SUPPLY AND RETURN DUCTS WILL BE |
| | ROUTED FROM THE AIR HANDLER IN THE GARAGE TO THE SECOND |
| | FLOOR. FBC 107.2.1 IT APPEARS THAT THE SUPPLY AND |
| | RETURN DROPS ARE TIED TO THE SAME DUCT. PLEASE PROVIDE |
| | A DRAWING THAT WILL CLARIFY. |
| | |
| | 4) THE AHU MOUNTING DETAIL FOR AHU-3 IS INCORRECTLY |
| | LABELED AS AHU-1. THIS DRAWING DOES NOT MATCH THE |
| | PROPOSED HVAC SYSTEM. FBC 107.2.1 |
| | |
| | 5) THE FIRST FLOOR PLANS INDICATE FLEX DUCT IN THE |
| | GARAGE THAT PENETRATE THE GARAGE WALLS. FBCR 302.5.2 |
| | REQUIRES DUCTS LOCATED IN THE GARAGE AND DUCTS |
| | PENETRATING THE WALLS OR CEILINGS SEPARATING THE |
| | DWELLING FROM THE GARAGE TO BE CONSTRUCTED OF A MINIMUM |
| | NO.26 GAGE SHEET STEEL, 1 INCH MINIMUM RIGID |
| | NONMETALLIC CLASS 0 OR CLASS 1 DUCT BOARD OR OTHER |
| | APPROVED MATERIAL AND SHALL HAVE NO OPENINGS INTO THE |
| | GARAGE. |
| | |
| | 6) THE ENERGY COMPLIANCE REPORT, FORM R405-2014 IS |
| | REQUIRED TO BE SIGNED AND DATED BY THE OWNER/AGENT. FBC |
| | ENERGY CONSERVATION SECTION R103.1.1.2 |
| | |
| | 7) IN ORDER TO TAKE THE CEILING FAN CREDIT, THE FAN |
| | BLADE DIAMETERS SHALL BE SPECIFIED ON THE PLANS TO SHOW |
| | COMPLIANCE WITH FBC ENERGY CONSERVATION SECTION |
| | R405.7.6. |
| | |
| | 8) PLEASE EXPLAIN WHY THERE ARE TWO CENTRAL HEATING AND |
| | COOLING SYSTEMS SPECIFIED ON THE ENERGY COMPLIANCE FORM |
| | IF ONLY THE ADDITION ALONE IS BEING USED TO SHOW |
| | COMPLIANCE. OTHERWISE THE EXISTING BUILDING AND |
| | ADDITION SHALL COMPLY AS A SINGLE BUILDING. FBC ENERGY |
| | CONSERVATION SECTION R101.4.3 |
| | |
| | 9) IN ORDER TO REDUCE PLAN REVIEW TIME, PLEASE SUBMIT A |
| | RESPONSE LETTER INDICATING HOW EACH OF THE REVIEW |
| | COMMENTS HAS BEEN ADDRESSED. |
| | |
| | |
| | |