| 2016-08-11 17:15:37 | FAILED |
| | |
| | 1) THE CIVIL PLAN DOES NOT INCLUDE CONSTRUCTION DETAILS |
| | FOR THE NEW WESTERN FOUR PARKING SPACES. PLEASE NOTE |
| | THEY ARE SHOWN IN THE CORRECT LOCATION AND WITH THE |
| | CORRECT, EXISTING SIDEWALK CONNECTION TO THE SCHOOL. |
| | |
| | 2) THE ARCHITECTURAL SITE PLAN INCORRECTLY SHOWS THE |
| | CURRENT AND FUTURE LAYOUT OF THE ENTIRE WESTERN PARKING |
| | AREA. PLEASE ENSURE THAT THE CORRECT EXISTING AND |
| | APPROVED BASE INFORMATION IS USED ON THE ARCHITECTURAL |
| | SITE PLANS. |
| | |
| | 3) THE CIVIL PLANS DO NOT SHOW THE FULL LENGTH OF THE |
| | SIDEWALK CONNECTING THE EASTERN PARKING SPACES TO THE |
| | EXISTING SCHOOL, NOR THE NEW SIDEWALK SHOWN ON THE |
| | ARCHITECTURAL PLANS BY THE PLAYGROUND. ALL PLANS SHALL |
| | MATCH. |
| | |
| | 4) THE CIVIL PLANS SHALL SHOW THE WORK BEING DONE NOW |
| | ON ONE PLAN, NOT A PHASE 2 AND PHASE 3 PLAN THAT SHOW |
| | DIFFERING SCOPES OF WORK. |
| | |
| | 5) THESE PLANS SHALL ALSO MATCH THE ARCHITECTURAL SITE |
| | PLAN AT THE TERMINUS OF ORANGE COURT. THE CIVIL PLAN |
| | SHOWS A RAMP TO PERMIT WALKING ACROSS THE PARKING LOT, |
| | YET THE CIVIL PLANS TERMINATE THE WALKWAY PRIOR TO THE |
| | CURB LINE. IN ANY EVENT THERE SHOULD BE A SMOOTHER |
| | TRANSITION FROM THE TERMINUS TO THE WALKWAY TO THE |
| | SOUTH. |
| | |
| | 6) NO PAVER DETAILS WERE PROVIDED. |
| | |
| | 7) THE PBDA PLAT SHALL BE RECORDED PRIOR TO ISSUANCE OF |
| | FINAL 104 INSPECTION APPOVAL. |
| | |
| | PLEASE CONTACT ERIC SCHNEIDER @ (561) 822-1446. |
| 2016-08-01 15:07:21 | ROUTED TO ERIC SCHNEIDER |