| Date |
Text |
| 2016-09-30 12:18:34 | 2ND REVIEW |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER LL |
| | CITY OF WEST PALM BEACH |
| | DEVELOPMENT SERVICES |
| | BUILDING DIVISION |
| | 561-805-6711 |
| | [email protected] |
| | |
| | PLUMBING COMMENTS: |
| | |
| | 1. 2ND REQUEST PREVIOUS COMMENT # 2 THE GRAB BARS ARE |
| | STILL SHOWING THAT THEY ARE BEING MEASURED FROM THE |
| | CENTER OF THE BAR THE CODE IS MEASURED FROM THE TOP OF |
| | THE GRIPPING SURFACE, IF YOU MEASURE THEM 36IN TO THE |
| | CENTER THEY WILL BE TO HIGH PER FBC ACC 609.4 POSITION |
| | OF GRAB BARS. |
| | GRAB BARS SHALL BE INSTALLED IN A HORIZONTAL POSITION, |
| | 33 INCHES (840 MM) MINIMUM AND 36 INCHES (915 MM) |
| | MAXIMUM ABOVE THE FINISH FLOOR MEASURED TO THE TOP OF |
| | THE GRIPPING SURFACE, EXCEPT THAT AT WATER CLOSETS FOR |
| | CHILDREN?S USE COMPLYING WITH 604.9, GRAB BARS SHALL BE |
| | INSTALLED IN A HORIZONTAL POSITION 18 INCHES (455 MM) |
| | MINIMUM AND 27 INCHES (685 MM) MAXIMUM ABOVE THE FINISH |
| | FLOOR MEASURED TO THE TOP OF THE GRIPPING SURFACE. THE |
| | HEIGHT OF THE LOWER GRAB BAR ON THE BACK WALL OF A |
| | BATHTUB SHALL COMPLY WITH 607.4.1.1 OR 607.4.2.1. |
| | |
| | 2. 2ND REQUEST PREVIOUS COMMENT # 8 IN YOUR RESPONSE |
| | LETTER IT SAYS THAT THE GREASE INTERCEPTOR CALCULATIONS |
| | ARE ON THE CIVIL DRAWING, THE CIVIL DRAWINGS ARE NOT IN |
| | THIS PLAN SET IF YOU WERE REFERRING TO THE UTILITY |
| | DRAWING I DID NOT FIND ANY CALCULATIONS ON THOSE SHEETS |
| | PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | 3. 2ND REQUEST PREVIOUS COMMENT #11 THE ORIGINAL NOTE |
| | FOR THE SAMPLING PORT DOES NOT COMPLY PLEASE REVISE TO |
| | INCLUDE A 6" OPENING AND NO CAP OR SUMP AT THE BOTTOM |
| | OF THE SAMPLING PORT ,OR JUST REMOVE NOTE. PER WPB |
| | AMEND TO FBC 107.2.1 |
| | |
| | 4. SHT. P-3 WHAT STANDARD OR CODE IS THE TABLE LABELED |
| | GREASE FIXTURE DRAINAGE SIZING CALCULATIONS PLEASE |
| | CLARIFY. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | 5. PLEASE PROVIDE NOTE ON PLAN THAT A SEPARATE PERMIT |
| | IS REQUIRED FOR BACKFLOW DEVISE, GREASE INTERCEPTOR AND |
| | GAS. PER WPB AMEND TO FBC 107.2.1 |
| | |