| 2016-07-30 10:18:20 | 1) THE PLANS REQUIRE REVIEW AND APPROVAL FROM THE DEPT. |
| | OF BUSINESS AND PROFESSIONAL REGULATION, DIVISION OF |
| | HOTELS AND RESTAURANTS.WPB AMEND. TO FBC SEC.102.1.2. |
| | 2) SHT. A-300 - THE INSTALLATION OF GRAB BARS SHALL BE |
| | MEASURED FROM THE FINISH FLOOR TO THE TOP OF THE |
| | GRIPPING SURFACE PER 2014 FBC-ACCESSIBILITY SEC. 609.4. |
| | 3) SHT.P-1 - THE PLAN SHOWS THE DISCHARGE FROM THE ICE |
| | MAKERS, GLASS RACK, ICE BIN & BAR SINK DISCHARGING INTO |
| | THE GREASY WASTE SYSTEM. THIS IS NOT PERMITTED PER THE |
| | 2014 FPC SEC.1003.2.WASTES THAT DO NOT REQUIRE |
| | TREATMENT OR SEPARATION SHALL NOT BE DISCHARGED INTO |
| | ANT INTERCEPTOR OR SEPARATOR. |
| | 4) SHT.P-1 - THE SANITARY RISER APPEARS TO SHOW THE |
| | FRYERS DISCHARGING INDIRECTLY INTO THE FLOOR SINK FOR |
| | THE GREASY WASTE SYSTEM. CLARIFY. |
| | 5) A SEPARATE PERMIT IS REQUIRED FOR THE BACKFLOW |
| | PREVENTER.WPB AMEND. TO FBC SEC. 105.1. |
| | 6) SUBMIT A DETAIL FOR THE HOT WATER RETURN PIPING. IT |
| | IS DIFFICULT TO SEE HOW/WHERE THE RETURN LINE IS |
| | CONNECTED. IT APPEARS LIKE THE FLOW ARROW AT THE CHECK |
| | VALVE IS REVERSED. CLARIFY. |
| | 7) BACKFLOW PREVENTION DEVICES ARE REQUIRED ON THE |
| | ICEMAKERS. 2014 FPC SEC.608.3. |
| | 8) THE GREASE INTERCEPTOR SHALL BE SIZED BASED ON THE |
| | NUMBER OF SEATS IN THE DINING AREA WHICH INCLUDES THE |
| | EXTERIOR SEATING AREA . HAVE THE SEATS IN WHAT APPEARS |
| | TO BE BOOTHS BEEN INCLUDED IN THE COUNT? CLARIFY. |
| | 9) SHT. P-3 - REFERENCE IS MADE TO TABLE 709.1 OF THE |
| | PLUMBING CODE FOR GREASE SIZING CALCULATIONS. TABLE |
| | 709.1 IS FOR DRAINAGE FIXTURE UNITS, NOT FOR GREASE |
| | SIZING CALCULATIONS. CLARIFY. THERE IS ALSO A REFERENCE |
| | TO TABLE 1003.5.1 FOR THE SIZING FORMULA FOR GREASE |
| | INTERCEPTORS. THERE IS NO SUCH TABLE IN THE PLUMBING |
| | CODE. CLARIFY. |
| | 10) SHT.A-102 - SCUPPERS SHALL BE SIZED IN ACCORDANCE |
| | WITH TABLE 1106.7 OF THE 2014 FPC.THE SIZING SHALL BE |
| | BASED ON A 5 INCH PER HOUR RATE OF RAINFALL. INDICATE |
| | THE HEAD IN INCHES FOR THE OVERFLOW SCUPPERS AND SHOW |
| | THE SQUARE FOOT AREA BEING DRAINED BY EACH SCUPPER. |
| | 11) THE SAMPLING PORT SHOWN ON THE PLANS IS NOT AN |
| | ACCEPTABLE DESIGN PER THE CWPB UTILITIES DEPT. A |
| | PRE-MANUFACTURED SAMPLING PORT OR A DIFFERENT DESIGN |
| | MAY BE ACCEPTABLE. YOU MAY CONTACT KELLY CRANFORD IN |
| | THE ENGINEERING DIVISION FOR ASSISTANCE. 561-835-7423. |
| | 12) THE GAS SHALL BE PERMITTED UNDER A SEPARATE |
| | PERMIT.WPB AMEND. TO FBC SEC. 105.1. |
| | |