| Date |
Text |
| 2016-07-19 09:20:10 | 1ST REVIEW MECHANICAL |
| | PERMIT #16070258 |
| | 7/19/16 |
| | |
| | 1) ADVISORY: SEPARATE PERMITS ARE REQUIRED FOR THE |
| | KITCHEN EXHAUST HOOD, FIRE SUPPRESSION, AND WALK-IN |
| | COOLER. PLEASE PLACE ADVISORY NOTES IN BOLD LETTERS ON |
| | THE PLANS. |
| | |
| | 2) ADVISORY: ALTHOUGH THE KITCHEN EXHAUST HOOD WILL BE |
| | PERMITTED SEPARATELY, SOME INFORMATION MUST BE PLACED |
| | ON THE MAIN PLAN TO HELP EXPEDITE THE PROJECT. PLEASE |
| | PROVIDE EQUIPEMENT SCHEDULES FOR THE KITCHEN HOOD, AND |
| | THE EXHAUST AND MAKEUP AIR FANS. |
| | |
| | 3) PROVIDE A MECHANICAL ROOF PLAN SHOWING ALL EQUIPMENT |
| | LOCATIONS INCLUDING THE AC CONDENSERS, THE O/A INTAKES, |
| | THE HOOD EXHAUST FAN TERMINATION, AND HOOD MAKEUP AIR |
| | INTLET. SHOW ON THE PLAN ALL REQUIRED CLEARANCE |
| | DISTANCE MEASUREMENTS INCLUDING: A) O/A INTAKES TO |
| | EXHAUST AND VENT OUTLETS. B) EQUIPMENT TO ROOF EDGES. |
| | C) SERVICE CLEARANCES AROUND EQUIPMENT. |
| | |
| | 4) IN ACCORDANCE WITH TABLE 403.3, AN EXHAUST RATE OF |
| | 0.70 CFMS PER SQ. FT. IS REQUIRED FOR KITCHENS, AND ALL |
| | AIR SUPPLIED TO THE AREA SHALL BE EXHAUSTED AND |
| | RECIRCULATION IS PROHIBITED PER FOOTNOTE B AND SECTION |
| | 403.2.1(3). CURRENTLY NO EXHAUST SYSTEM IS SHOWN ON THE |
| | PLAN- PLEASE REVISE THE PLAN TO SHOW COMPLIANCE. |
| | |
| | 5) PROVIDE AIR BALANCE CALCULATIONS. |
| | |
| | 6) PROVIDE COMBUSTION AIR CALCULATIONS FOR THE |
| | GAS-FIRED COOKING APPLIANCES- SEE SECTION 304 FBC-14 |
| | FUEL GAS. |
| | |
| | 7) REMOVE THE AC DROPS FROM AHU #4 TO THE RESTROOMS IN |
| | COMPLIANCE WITH TABLE 403.3 FOOTNOTE B, AND SECTION |
| | 403.2.1(3). |
| | |
| | 8) DUCT SMOKE DETECTORS ARE REQUIRED IN THE RETURN AIR |
| | SYSTEMS OF AHU- 1 & 4 PER SECTION 606.2.1, UNLESS THE |
| | EOR SUBMITS MANUFACTURER'S SPECIFICATIONS THAT SHOW THE |
| | SYSTEMS DO NOT HAVE THE CAPACITIES TO EXCEED 2000 CFMS. |
| | |
| | 9) PROVIDE FLEX DUCT SIZES. |
| | |
| | 10) INDICATE HOW ACCESS WILL BE PROVIDED FOR |
| | MAINTENANCE AND REPLACEMENT OF AHU-1 AND ANY OTHER |
| | AHU'S LOCATED ABOVE DRYWALL CEILINGS. |
| | |
| | 11) PROVIDE WIND LOAD ENGINEERING FOR ATTACHEMENT AND |
| | TIE DOWN OF ALL ROOF TOP MECHANICAL EQUIPMENT TO THE |
| | ROOF STRUCTURE INCLUDING THE CONDENSERS AND CONDENSER |
| | STANDS, THE FANS AND FAN CURBS, AND THE O/A INTAKES- |
| | SEE SECTION 301.15, AND SECTION 1609 FBC-14 BUILDING |
| | FOR WIND LOAD DESIGN CRITERIA- INDICATE THE WIND SPEED, |
| | EXPOSURE CATEGORY, IMPORTANCE FACTOR AND DESIGN |
| | PRESSURES. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |