| 2016-07-07 15:28:52 | 1ST REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #16070187 |
| | 7/6/16 |
| | |
| | 1) PLEASE NOTE THAT MANY OF THE REQUIRED DETAILS AND |
| | NOTES FOR THE PROPOSED KITCHEN HOODS PROJECT ARE FOUND |
| | IN THE MAIN PERMIT SET OF PLANS- #15110510 THAT WERE |
| | PREPARED BY THE EOR FROM INTERPLAN. THE EOR FOR THIS |
| | PROJECT- BUCHANAN P.E. MUST PROVIDE THESE NOTES AND |
| | DETAILS ON THIS SEPARATELY PERMITTED SETS OF PLANS- |
| | REFER TO MAIN PERMIT SHEETS M2.0, M4.0, & M4.1 AS THEY |
| | PERTAIN TO THE FOLLOWING COMMENTS: |
| | |
| | A) PROVIDE AIR VELOCITY CALCULATIONS FOR THE GREASE |
| | DUCTS- SECTION 506.3.4 |
| | |
| | B) PROVIDE A DETAIL SHOWING REQUIRED CLEARANCES TO |
| | COMBUSTIBLES FOR THE HOODS- SECTION 507.9. |
| | |
| | C) PROVIDE A DETAIL SHOWING REQUIRED CLEARANCES TO |
| | COMBUSTIBLES FOR THE GREASE DUCTS- SEE SECTION 506.3.6 |
| | & 506.3.11. IF DUCT WRAP IS TO BE USED, PROVIDE A |
| | SUBMITTAL FOR THE PRODUCT WITH SHOP DRAWING APPROVAL |
| | SIGNATURE BY THE EOR- SEE SECTION 506.3.11.2 |
| | |
| | D) PROVIDE A DETAIL SHOWING THE CLEARANCE DISTANCES FOR |
| | THE EXHAUST FAN DISCHARGES ABOVE THE ROOF SURFACES- |
| | 506.3.13. |
| | |
| | E) PROVIDE A MECHANICAL ROOF PLAN SHOWING THE REQUIRED |
| | CLEARANCE DISTANCES FOR THE FOUR EXHAUST TERMINATIONS |
| | TO MECHANICAL AND GRAVITY AIR INTAKES INTO THE |
| | BUILDING. |
| | |
| | F) PROVIDE THE WIND LOAD DESIGN CRITERIA FOR |
| | INSTALLATION OF THE ROOF TOP FANS AND SUBMIT THE NOA'S |
| | SHOWN ON SHEET NO. 3 WITH SHOP DRAWING APPROVAL |
| | SIGNATURES BY THE EOR. |
| | |
| | G) REFER TO SECTION 508.1.1 AND SHOW COMPLIANCE FOR |
| | MAKEUP AIR TEMPERATURE. |
| | |
| | H) SHEET 3: PROVIDE THE TAG INFORMATION FOR FAN UNIT #4 |
| | SHOWN IN THE EXHAUST FAN INFORMATION SCHEDULE. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |