| 2016-07-15 10:11:59 | 1ST REVIEW MECHANICAL |
| | PERMIT #16070183 |
| | 7/15/16 |
| | |
| | 1) PROVIDE AC COOLING AND HEATING CALCULATIONS FOR THE |
| | NEW MINI-SPLIT SYSTEMS- SECTION C403.2.1 FBC-14 ENERGY |
| | CONSERVATION. |
| | |
| | 2) PROVIDE ENERGY CALCULATIONS IN COMPLIANCE WITH |
| | SECTION C101.4.3 & C401.2 FBC-14 ENERGY CONSERVATION. |
| | |
| | 3) PROVIDE AN EXHAUST VENTILATION CALCULATION FOR THE |
| | DRYER AND SUBMIT MANUFACTURER'S SPECIFICATIONS- SECTION |
| | 504.5, 504.6.4. INDICATE THE TYPE OF EXHAUST DUCT WORK |
| | AND GAUGE OF STEEL |
| | |
| | 4) PROVIDE UL LISTED FIRESTOPPING ASSEMBLIES FOR AC |
| | REFRIGERANT AND CONDENSATE PIPING PENETRATING |
| | FIRE-RATED FLOOR/CEILING AND WALL ASSEMBLIES. |
| | |
| | 5) INDICATE THE TYPE AND THICKNESS OF REFRIGERANT AND |
| | CONDENSATE PIPING INSULATION ON THE PLAN, AND PROVIDE A |
| | SUBMITTAL. |
| | |
| | 6) M0.1: PROVIDE THE WIND LOAD DESIGN CRITERIA AND |
| | COMPLETE DETAILS FOR ATTACHMENT AND ANCHORING OF THE |
| | CONDENSER UNITS AND ROOF STAND. SUBMIT A FL. PRODUCT |
| | APPROVAL FOR THE STAND WITH APPROVAL SIGNATURE BY THE |
| | DESIGN PROFESSIONAL OF RECORD. PLEASE CIRCLE, |
| | HIGHLIGHT, OR OTHERWISE MARK ALL APPLICABLE DETAILS, |
| | NOTES, DESIGN PRESSURES SHOWN ON THE DOCUMENT- SECTION |
| | 301.15. |
| | |
| | 7) IT APPEARS THAT A PERMANENT LADDER WILL BE REQUIRED |
| | TO PROVIDE ACCESS TO THE ROOFTOP MECHANICAL EQUIPMENT. |
| | REFER TO SECTION 306.5 AND SHOW THE LOCATION OF THE |
| | LADDER, AND PROVIDE CONSTRUCTION DETAILS. |
| | |
| | 8) THERE ARE NO DIMESIONS ON THE ELEVATION DRAWINGS OR |
| | PARAPET SECTIONS TO INDICATE THE HEIGHT OF THE PARAPET |
| | ABOVE THE FINISHED ROOF SURFACE. PLEASE REVIEW AND |
| | PROVIDE GUARDS AT THE ROOF EDGES WHERE NECESSARY AS |
| | REQUIRED BY SECTION 304.11. |
| | |
| | 9) CLARIFY HOW ACCESS FOR MAINTENANCE AND REPLACEMENT |
| | OF THE DRYER MAKEUP AIR MOTORIZED DAMPER WILL BE |
| | PROVIDED- SEE SECTION 306.1. |
| | |
| | 10) SHEET A-105 SHOWS A MECHANICAL CHASE MOST LIKELY |
| | FOR A KITCHEN EXHAUST DUCT. PLEASE NOTE THAT THE DUCT |
| | MUST BE INSPECTED BEFORE BEING ENCLOSED IN THE CHASE, |
| | AND A UL APPROVED FIRESTOPPING ASSEMBLY WILL BE |
| | REQUIRED WHERE THE DUCT EXITS THE BOTTOM OF THE CHASE |
| | AT CEILING LEVEL. PLEASE ALSO NOTE THAT GREASE DUCTS |
| | REQUIRE AN 18" CLEARANCE TO COMBUSTIBLES PER SECTION |
| | 506.3.6. |
| | |
| | 11) PLEASE PROVIDE A RESPONSE NARRATIVE FROM THE DESIGN |
| | PROFESSIONAL ADDRESSING ALL OF THE COMMENTS LISTED |
| | ABOVE, A) ALL MECHANICAL EQUIPMENT AND APPLIANCE |
| | SUBMITTALS SHALL BEAR THE APPROVAL SIGNATURE OF THE |
| | DESIGN PROFESSIONAL OF RECORD. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |