| 2016-08-08 10:40:53 | 2ND REVIEW FBC-2014 MECHANICAL |
| | PERMIT #16070025 |
| | 8/8/16 |
| | |
| | 1) COMMENT #1 FROM THE 1ST REVIEW STILL EXISTS. I AM |
| | REPRINTING IT BELOW. PLEASE NOTE THAT THE ARCHITECT HAS |
| | SIGNED THE ENERGY CALCULATIONS BUT NOT THE AC |
| | CALCULATIONS. |
| | 1) IN REGARD TO THE SUBMITTED AC CALCULATIONS PREPARED |
| | FOR THE PROJECT BY TOM PLATANIA- PRO CALCS LLC., PLEASE |
| | REFER TO SECTION 105.3.1.2(3) FBC-14 BUILDING: |
| | AN AIR-CONDITIONING SYSTEM MAY BE DESIGNED BY AN |
| | INSTALLING AIR-CONDITIONING CONTRACTOR CERTIFIED UNDER |
| | CHAPTER 489, FLORIDA STATUTES, TO SERVE ANY BUILDING OR |
| | ADDITION WHICH IS DESIGNED TO ACCOMMODATE FEWER THAN |
| | 100 PERSONS AND REQUIRES AN AIR-CONDITIONING SYSTEM |
| | WITH A VALUE OF $125,000 OR LESS; AND WHEN A 15-TON-PER |
| | SYSTEM OR LESS IS DESIGNED FOR A SINGULAR SPACE OF A |
| | BUILDING AND EACH 15-TON SYSTEM OR LESS HAS AN |
| | INDEPENDENT DUCT SYSTEM. SYSTEMS NOT COMPLYING WITH THE |
| | ABOVE REQUIRE DESIGN DOCUMENTS THAT ARE TO BE SEALED BY |
| | A PROFESSIONAL ENGINEER. |
| | PLEASE CLARIFY IF MR. PLATANIA IS EITHER THE ENGINEER |
| | OF RECORD OR THE INSTALLING AC CONTRACTOR. |
| | |
| | 2) THE AC LOAD CALCULATIONS AND THE EQUIPMENT SCHEDULE |
| | ON M.1 IDENTIFY THE NEW SYSTEMS AS AC-6 & AC-7, HOWEVER |
| | THEY ARE INCORRECTLY IDENTIFIED AS AHU-1 & AHU-2 IN THE |
| | ENERGY CALCULATIONS. |
| | |
| | 3) M.1: PLEASE SHOW THE DUCT LAYOUTS FOR AHU-3 AND |
| | AHU-4. INDICATE DUCT SIZES AND WHICH DUCTS ARE NEW, |
| | EXISTING, OR RELOCATED. |
| | |
| | 4) M.1: SHOW THE DISCHARGE LOCATION FOR THE CONDENSATE |
| | PIPE SERVING AHU-7. |
| | |
| | 5) AS PREVIOUSLY REQUESTED IN THE 1ST REVIEW (COMMENT |
| | #12), PROVIDE A PRODUCT APPROVAL OR NOA FOR THE |
| | LOUVERS. WHAT HAS BEEN SUBMITTED IS A MANUFACTURER'S |
| | DATA SHEET. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |