| 2016-07-08 16:59:08 | PROVISOS: SPECIAL CONDITIONS |
| | 1. CONTRACTORS, SUBCONTRACTORS AND PERSONS HOLDING |
| | PERMITS TO PERFORM LAND DISTURBING CONSTRUCTION OR LAND |
| | DEVELOPMENT ACTIVITIES, AND THE LANDOWNERS OF |
| | CONSTRUCTION SITES SHALL CAUSE THE CONSTRUCTION SITE TO |
| | BE MAINTAINED IN A NEAT AND ORDERLY CONDITION THAT IS |
| | FREE FROM ANY DEBRIS, GARBAGE, JUNK, USED OR DISCARDED |
| | CONSTRUCTION MATERIALS, TRASH OR ANY OTHER FOREIGN |
| | SUBSTANCE PRODUCED AS A RESULT OF THE LAND DISTURBING |
| | CONSTRUCTION OR LAND DEVELOPMENT ACTIVITIES, OTHER THAN |
| | DEBRIS, GARBAGE, JUNK, TRASH OR OTHER FOREIGN SUBSTANCE |
| | DEPOSITED INTO AND CONTAINED WITHIN A TRASH RECEPTACLE |
| | OR TRASH DUMPSTER. |
| | 2. IN ALL INSTANCES WHERE A BUILDING PERMIT HAS NOT |
| | BEEN ISSUED WITHIN THREE MONTHS OF THE COMPLETION OR |
| | ABANDONMENT OF LAND DISTURBING CONSTRUCTION ACTIVITIES, |
| | THE JOB SITE SHALL, WITHIN 30 DAYS AFTER THE EXPIRATION |
| | OF SUCH THREE-MONTH PERIOD, BE BROUGHT TO GRADE, |
| | TILLED, PLANTED AND MAINTAINED WITH GROUND COVER TO |
| | INCLUDE SODDING OR SEEDING WHICH SHALL HAVE IRRIGATION. |
| | ANY TEMPORARY CONSTRUCTION FENCE SHALL ALSO BE REMOVED. |
| | THE CONSTRUCTION SERVICES DIRECTOR OR DESIGNEE, WITH |
| | INPUT FROM THE PLANNING DIRECTOR OR DESIGNEE, MAY |
| | GRANT, IN WRITING, AN EXTENSION TO THE TIME FRAME FOR |
| | THE ISSUANCE OF A BUILDING PERMIT, UNDER THIS |
| | PARAGRAPH, WHEN THE LANDOWNER HAS DEMONSTRATED A GOOD |
| | FAITH EFFORT IN PURSUING THE BUILDING PERMIT BUT THAT |
| | CIRCUMSTANCES BEYOND THE CONTROL OF THE CONTRACTOR |
| | AND/OR PERMITTEE HAVE OCCURRED. |
| | 3. ALL CONSTRUCTION WASTE AND DEBRIS FROM NEW |
| | CONSTRUCTION OR MAJOR ALTERATION OR REPAIR SHALL BE |
| | KEPT IN AN ENCLOSED CONTAINER TO MINIMIZE DEBRIS FROM |
| | LITTERING ADJACENT PROPERTIES AND PUBLIC RIGHTS-OF-WAY. |
| | THE PERMITTEE, CONTRACTOR OR LANDOWNER SHALL CAUSE SUCH |
| | WASTE OR DEBRIS TO BE REMOVED WEEKLY IN ACCORDANCE WITH |
| | SECTION 74-2 OF THE CITY OF WEST PALM BEACH CODE OF |
| | ORDINANCES. |
| | 4. ALL MUD OR DEBRIS SHALL BE CONTINUALLY REMOVED FROM |
| | THE PUBLIC SIDEWALKS AND STREETS. |
| | 5. CONTRACTORS, SUBCONTRACTORS, PERSONS HOLDING PERMITS |
| | TO PERFORM LAND DISTURBING CONSTRUCTION AND LAND |
| | COMMUNITYPLUS V8.1 PAGE NUMBER: 2 |
| | PERMIT NUMBER: 15010606 - RAMIREZ LUIS H & |
| | DEVELOPMENT ACTIVITIES AND THE LANDOWNERS OF |
| | CONSTRUCTION SITES SHALL, AT THE DIRECTION OF THE |
| | ENGINEERING SERVICES DIRECTOR OR DESIGNEE, EITHER |
| | REPAIR, OR REIMBURSE THE CITY FOR ITS COSTS INCURRED TO |
| | REPAIR, ANY DAMAGE TO ANY PUBLIC RIGHT-OF-WAY THAT IS |
| | CAUSED BY ANY CONSTRUCTION VEHICLE INVOLVED IN THE LAND |
| | DISTURBING CONSTRUCTION OR LAND DEVELOPMENT ACTIVITIES. |
| | 6. IN THE EVENT THAT THE DEMOLITION PERMIT OR BUILDING |
| | PERMIT EXPIRES, ALL MATERIALS AND EQUIPMENT RELATED TO |
| | THE LAND DISTURBING CONSTRUCTION OR LAND DEVELOPMENT |
| | ACTIVITIES SHALL BE REMOVED FROM THE JOB SITE WITHIN |
| | TEN DAYS OF THE PERMIT EXPIRATION DATE. THE JOB SITE |
| | SHALL, WITHIN 30 DAYS THEREAFTER, BE BROUGHT TO GRADE, |
| | BE TILLED AND PLANTED WITH GROUND COVER TO INCLUDE |
| | SODDING OR SEEDING WHICH SHALL HAVE IRRIGATION. SAID |
| | GROUND COVER SHALL BE MAINTAINED IN ACCORDANCE WITH |
| | SUBSECTIONS 74-2(C) AND SECTION 94-446 OF THIS CODE. |
| | 7. DEMOLITION CONTRACTOR WILL BE RESPONSIBLE FOR |
| | DEVELOPING AND IMPLEMENTING A SITE SPECIFIC STORMWATER |
| | POLLUTION PREVENTION PLAN (SWPPP). |
| | STORMWATER POLLUTION PREVENTION PLAN - MINIMUM |
| | REQUIREMENTS FOR DEMOLITION PROJECTS |
| | THE DEMOLITION CONTRACTOR IS RESPONSIBLE FOR |
| | INSTALLATION OF APPROPRIATE EROSION AND SEDIMENT |
| | CONTROL MEASURES. |
| | EXISTING UTILITIES (WATER, SANITARY, STORMWATER, GAS, |
| | ELECTRIC, ETC.) WILL BE CAPPED OR REMOVED PRIOR TO THE |
| | START OF ANY OTHER DEMOLITION ACTIVITIES. |
| | PRIOR TO THE START OF ANY DEMOLITION ACTIVITIES, A |
| | DOUBLE ROW OF SILT FENCING WILL BE INSTALLED AT THE |
| | BETWEEN THE SITE AND ANY ADJACENT BODIES OF WATER. |
| | WHERE POSSIBLE, A SINGLE ROW OF SILT FENCE WILL BE |
| | INSTALLED AROUND THE PERIMETER OF THE REMAINDER OF THE |
| | CONSTRUCTION AREA. ADJACENT STORMWATER CATCH BASINS AND |
| | INLETS WILL BE PROTECTED BY COVERING WITH SILT FENCE |
| | MATERIAL OR EQUIVALENT. |
| | DUST CONTROL MEASURES WILL BE IMPLEMENTED BY DEMOLITION |
| | CONTRACTOR AS NEEDED TO SUPPRESS DUST LEVELS TO BELOW |
| | THOSE LISTED IN 29 CFR 1926.55. |
| | ALL WASTE/DEBRIS LEAVING THE SITE WILL BE IN CLOSED OR |
| | COVERED CONTAINERS. |
| | DEMOLITION CONTRACTOR WILL UTILIZE GOOD CONSTRUCTION |
| | MANAGEMENT TECHNIQUES TO CONTAIN ALL STORMWATER RUNOFF |
| | WHICH HAS COME INTO CONTACT WITH CONSTRUCTION DEBRIS. |
| | DEMOLITION CONTRATOR'S PERSONNEL WILL INSPECT THE |
| | PERIMETER OF THE CONSTRUCTION AREA DAILY TO ENSURE THAT |
| | SEDIMENT LADEN WATER DOES NOT LEAVE THE SITE. |
| | |
| | MANUEL JULIAN GONZALEZ |
| | ENGINEERING PROJECT COORDINATOR |
| | PUBLIC WORKS DEPARTMENT |
| | 401 CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| | MAIN PHONE: (561) 822-1200 |
| | DIRECT: (561) 494-1085 |
| | FAX: (561) 494-1116 |
| | EMAIL: [email protected] |
| | WWW.WPB.ORG/ENGINEERING |
| | |