| 2017-03-20 10:25:56 | 1) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE GAS |
| | REGULATORS. THE SUBMITTED NARRATIVE RESPONSE REFERS TO |
| | AN ATTACHED KITCHEN BROCHURE BY DEI. I COULD NOT FIND |
| | ANY BROCHURE FROM DEI. CLARIFY. 2014 FBC-FUEL GAS |
| | SECS.410.1, 410.2. 3RD REQUEST. |
| | 2) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS FOR ALL |
| | GAS EQUIPMENT AND APPLIANCES. GAS APPLIANCES REGULATED |
| | BY THE FUEL GAS CODE SHALL BE LISTED AND LABELED PER |
| | 2014 FBC-FUEL GAS SEC.301.3. 2ND REQUEST.THE NARRATIVE |
| | RESPONSE REFERS TO A KITCHEN EQUIPMENT BROCHURE BY |
| | DEI.I COULD NOT FIND ANY SUCHBRROCHURE FROM DEI. |
| | CLARIFY. |
| | 3) SHT. M2.01 & M2.02 - COMBUSTION AIR CALCULATIONS - |
| | WHERE COMBUSTION AIR IS MECHANICALLY SUPPLIED THROUGH |
| | AN HVAC SYSTEM, THE SYSTEM MUST DELIVER THE REQUIRED |
| | COMBUSTION AIR RATE ABOVE AND BEYOND ANY OUTDOOR AIR |
| | RATE SUPPLIED FOR VENTILATION OF THE OCCCUPIED |
| | SPACES.THE HVAC SYSTEM MUST ALSO BE INTERLOCKED WITH |
| | THE APPLIANCE(S) AS REQUIRED BY 2014 FBC FUEL GAS |
| | SEC.304.9.2. NEITHER CONTINUOUS OPERATION NOR PARALLEL |
| | OPERATION OF THE HVAC SYSTEM SATISFIES THE REQUIREMENT |
| | FOR A TRUE INTERLOCK AS REQUIRED BY 304.9.2. I CANNOT |
| | DETERMINE HOW THE REQUIREMENT FOR THE COMBUSTION AIR IN |
| | SEC. 304.9.3 HAS BEEN MET. CLARIFY. |
| | 4) SHT.K1PRS SHOWS GAS APPLIANCE PBF-1 (DECK |
| | OVEN/PIZZA) AT 140 MBTU.I DO NOT SEE THIS APPLIANCE OR |
| | THE BTU VALUE ON THE GAS PLANS / RISER. SHOW ALL GAS |
| | APPLIANCES ON THE GAS RISER AND THE CORRESPONDING BTU |
| | LOAD. 2014 FBC-FUEL GAS SEC.402.2. THE NARRATIVE |
| | RESPONSE REFERS TO A KITCHEN EQUIPMENT BROCHURE BY |
| | DEI.I COULD NOT FIND ANY SUCHBRROCHURE FROM DEI. |
| | CLARIFY. |
| | 5) SHT. P4.01 - I HAVE ADDED THE BTU LOAD OF EACH GAS |
| | APPLIANCE LISTED IN THE KEY NOTES 4 TIMES AND I STILL |
| | ARRIVE AT A TOTAL BTU LOAD OF 4363 MBTU'S. CLARIFY. |
| | |
| | THE FOLLOWING ITEMS WILL BE DEFERRED SUBMITTALS: |
| | 1) SPECIFICATIONS FOR THE BOILER,VENT DETAILS,VENT |
| | PIPING, ETC. |
| | 2) DETAILS FOR THE DRYER VENTS,VENT MATERIAL, ETC. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |