| 2017-03-21 14:45:33 | BUILDING PLAN REVIEW |
| | W. P. B. PERMIT: 16061443 |
| | ADD: 718 S. DIXIE HWY. / CANOPY BY HILTON 14 STORY |
| | CONT: TBD/ TO BE DETERMINED |
| | TEL: 561-718-5987 / MARGARET LEON |
| | E-MAIL: MLEONDADLP.COM |
| | |
| | 2014 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH |
| | AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1, |
| | ADMINISTRATION |
| | |
| | 3RD REVIEW |
| | DATE: TUES. MARCH 21/2017 |
| | ACTION: DENIED |
| | |
| | 1) COMPLIED. 13 STORIES INCLUDING THE HABITABLE POOL, |
| | POOL DECK AND A2 DELI/ RESTAURANT AREAS. |
| | |
| | 2) NOTICE: ART IN PUBLIC PLACES. |
| | FOR CONTACT INFORMATION PLEASE CONTACT: |
| | MS. SYBILLE WELTER |
| | ART IN PUBLIC PLACES COORDINATOR |
| | TEL: 822-1515 |
| | E-MAIL: [email protected] |
| | WEBSITE: WPB.ORG/AIPP/ |
| | |
| | 3) 3RD REQUEST, TO BE SUBMITTED WHEN CONTRACTOR SUBMITS |
| | FOR PERMIT. THIS MAIN BUILDING PERMIT WILL INCLUDE THE |
| | FEES FOR THE MECHANICAL, ELECTRICAL, PLUMBING & ROOFING |
| | PERMITS. WHEN THE GENERAL CONTRACTOR COMES IN FOR A |
| | BUILDING PERMIT WITH THE SIGNED PERMIT APPLICATION FORM |
| | BY THE QUALIFIER AND OWNER AND BRINGS IN THE LISTED |
| | SUB-PERMITS M-E-P & ROOFING PERMITS SIGNED BY THE |
| | QUALIFIER OF EACH COMPANY, THEIR INSURANCES AND |
| | LICENSURE UP TO DATE, THE M-E-P AND ROOFING PERMITS ARE |
| | FREE OF CHARGE. IF THE M-E-P & ROOFING PERMITS COME IN |
| | LATER THERE WILL BE AN $80.00 ADMINISTRATIVE FEE FOR |
| | EACH PERMIT. |
| | |
| | ALL OTHER PERMITS FIRE SPRINKLER, FIRE ALARM, EXHAUST |
| | HOODS, ANSUL SYSTEMS OR ALTERNATIVE AUTOMATIC |
| | FIRE-EXTINGUISHING SYSTEMS , WALK IN COOLERS & |
| | FREEZERS, ALL LOW VOLTAGE PERMITS, GENERATORS & FUEL |
| | TANKS, GAS PERMIT, POOL, JACUZZI AND ASSOCIATED |
| | SUB-PERMITS, AWNING, CANOPY, FENCE, LANDSCAPE , |
| | IRRIGATION, TEST PILE, AUGER CAST PILE AND OR |
| | FOUNDATION OR STRUCTURE ONLY PERMIT WILL BE SEPARATE |
| | REVIEWS AND ASSOCIATED FEES WITH EACH PERMIT. |
| | PLEASE LIST AND SUBTRACT THESE LINE ITEMS AND THEIR |
| | VALUE FROM THE OVERALL BUILDING VALUE OF |
| | $33,000,000.00. THE REMAINING BALANCE WILL BE |
| | AFFECTIVELY THE VALUE OF THE BUILDING YOU WILL BE |
| | PAYING FOR THIS PERMIT. THE BUILDING DOES NOT WANT TO |
| | COLLECT TWICE FOR THE VALUE OF THESE SUB-PERMITS NOT |
| | COVERED UNDER THE PRIME OR MASTER PERMIT. |
| | |
| | 2014 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH |
| | AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1, |
| | ADMINISTRATION 108.3 BUILDING PERMIT VALUATION. |
| | |
| | 4) SEMI-COMPLIED. PLEASE SHOW COMPLIANCE BY THE 2014 |
| | FBC-ENERGY CODE. SEE MECHANICAL COMMENTS, THERE ARE |
| | NUMEROUS OMISSIONS AND INCONSISTENCIES SEE MECH. |
| | COMMENT # 1. |
| | |
| | 5) THIS BUILDING QUALIFIES AS A THRESHOLD BUILDING. |
| | THRESHOLD BUILDING / FL S. S. 553.71(7) ?THRESHOLD |
| | BUILDING" MEANING ANY BUILDING WHICH IS GREATER THAN |
| | (3) STORIES OR 50 FT. IN HEIGHT, OR WHICH HAS AN |
| | ASSEMBLY OCCUPANCY CLASSIFICATION AS DENIED IN THE |
| | FLORIDA BUILDING CODE WHICH EXCEEDS 5,000 SQ. FT. IN |
| | AREA AND AN OCCUPANT CONTENT OF GREATER THAN 500 |
| | PERSONS. |
| | |
| | 5A) COMPLIED. 109.3.6.1 THRESHOLD INSPECTION PLAN. |
| | |
| | 5B) SEMI-COMPLIED. SHEET 5 OF 6 THERE IS NO CONTRACTOR |
| | SIGNATURE NOR NOTARY WORK COMPLETED. THIS SHEET WE WILL |
| | ACCEPT THE BOTTOM SIGNATURE AND SEAL OF THE ENGINEER OF |
| | RECORD. |
| | THRESHOLD INSPECTOR FORMS: WPB AMENDMENT 109.3.6.2 |
| | W.P.B. CONSTRUCTION SERVICES DEPARTMENT. |
| | |
| | 5C) COMPLIED. ARCHITECTURAL AND STRUCTURAL SHEETS. |
| | THRESHOLD BLDG., REQUIRED STATEMENT: W.P.B. AMENDMENT |
| | 110.3.7.4.4/ 633 FLORIDA STATUTE. |
| | |
| | 5D) COMPLIED. THE SPECIAL INSPECTORS ONSITE |
| | REPRESENTATIVE MARK PINA . |
| | |
| | 5E) 3RD REQUEST. THE CONTRACTOR WILL PRODUCE A JOB |
| | SUMMARY OR HISTORY FOR THIS TYPE OF CONSTRUCTION. |
| | THRESHOLD INSPECTION FORMS , GUIDELINES AND POLICIES |
| | FOR PROJECTS WERE E-MAILED TO: |
| | [email protected], PLEASE NOTE THIS E-MAIL ADDRESS CAME |
| | BACK UNDELIVERABLE. 07/14/2016 11:35 AM. |
| | [email protected] |
| | |
| | 5F) NOTICE ONLY. FOR DIGITAL PLANS, AFTER PERMIT |
| | ISSUANCE, PLEASE E-MAIL THE PERMIT LIBRARIAN OF THE |
| | PERMIT BEING ISSUED, THE PERMIT LIBRARIAN WILL THEN |
| | E-MAIL YOU THE APPROVED AND BATCH STAMPED PLANS SO YOU |
| | MAY PRINT YOUR PLANS, TWO SETS OF PLANS WILL NEED TO BE |
| | PRINTED IN COLOR, (1) FOR THE THRESHOLD INSPECTOR, THE |
| | OTHER FOR THE MEP INSPECTORS OTHER PLANS YOU WISH TO |
| | PRINT MAYBE IN BLACK & WHITE.. |
| | 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING |
| | CODE, CHAPTER 1, ADMINISTRATION, 110.3.7 THRESHOLD |
| | BUILDINGS, GUIDELINES AND POLICIES FOR PROJECTS |
| | CONCERNING SPECIAL INSPECTORS. |
| | |
| | 5G) PROVISO: 110.3.7.4.3 ALL SHORING AND RESHORING |
| | PROCEDURES, PLANS AND DETAILS SHALL BE SUBMITTED TO THE |
| | ENFORCEMENT AGENCY FOR RECORDKEEPING. EACH SHORING AND |
| | RESHORING INSTALLATION SHALL BE SUPERVISED, INSPECTED |
| | AND CERTIFIED TO BE IN COMPLIANCE WITH THE SHORING |
| | DOCUMENTS BY THE CONTRACTOR. |
| | 5H) PLEASE CALL THE CITY OF WEST PALM BEACHS AUTOMATED |
| | TELEPHONE INSPECTIONS LINE (561) 805-6700) FOR ALL |
| | BUILDING INSPECTIONS FOR AUDITING OF JOBSITE |
| | INSPECTIONS WITHOUT THIS THE PERMIT EXPIRES IN 6 |
| | MONTHS, ABANDONMENT OF JOB, NO INSPECTION ACTIVITY. |
| | |
| | 5H) INFORMATIONAL NO ACTION REQUIRED. 109.3.6 THRESHOLD |
| | BUILDINGS, OPERATING GUIDELINES FOR THRESHOLD |
| | INSPECTORS #26. ASSURE THAT THE DESIGNER HAS REQUIRED |
| | ON THE PLANS OR SPECIFICATIONS ONE MATERIAL, APPROVED |
| | FOR FIRE STOPPING PENETRATIONS, FOR WALLS AND CEILINGS. |
| | |
| | 6) COMPLIED. UNITY OF TITLE. |
| | |
| | 7) PROVISO: UNDER A SEPARATE PERMIT. PERIMETER FENCING |
| | UNDER A SEPARATE PERMIT. PLEASE PROVIDE COMPLIANCE |
| | WITH: 2014 FBC-B 3306.5 BARRIERS. BARRIERS SHALL BE A |
| | MINIMUM OF 8 FEET (2438 MM) IN HEIGHT AND SHALL BE |
| | PLACED ON THE SIDE OF THE WALKWAY NEAREST THE |
| | CONSTRUCTION. BARRIERS SHALL EXTEND THE ENTIRE LENGTH |
| | OF THE CONSTRUCTION SITE. |
| | |
| | 8) PROVISO: UNDER A SEPARATE PERMIT. 2014 FBC0B 3306.2 |
| | WALKWAYS. A WALKWAY SHALL BE PROVIDED FOR PEDESTRIAN |
| | TRAVEL IN FRONT OF EVERY CONSTRUCTION AND DEMOLITION |
| | SITE UNLESS THE APPLICABLE GOVERNING AUTHORITY |
| | AUTHORIZES THE SIDEWALK TO BE FENCED OR CLOSED. |
| | WALKWAYS SHALL BE OF SUFFICIENT WIDTH TO ACCOMMODATE |
| | THE PEDESTRIAN TRAFFIC, BUT IN NO CASE SHALL THEY BE |
| | LESS THAN 4 FEET (1219 MM) IN WIDTH. WALKWAYS SHALL BE |
| | PROVIDED WITH A DURABLE WALKING SURFACE. WALKWAYS SHALL |
| | BE ACCESSIBLE IN ACCORDANCE WITH CHAPTER 11 AND SHALL |
| | BE DESIGNED TO SUPPORT ALL IMPOSED LOADS AND IN NO CASE |
| | SHALL THE DESIGN LIVE LOAD BE LESS THAN 150 POUNDS PER |
| | SQUARE FOOT (PSF). WILL THE WALKWAYS ON THE SOUTH SIDE |
| | OF TRINITY PLACE BE CLOSED? |
| | |
| | 9) PROVISO: UNDER A SEPARATE PERMIT. 2014 FBC-B 3306.7 |
| | COVERED WALKWAYS. COVERED WALKWAYS SHALL HAVE A CLEAR |
| | HEIGHT OF NOT LESS THAN 8 FEET (2438 MM) AS MEASURED |
| | FROM THE FLOOR SURFACE TO THE CANOPY OVERHEAD. ADEQUATE |
| | LIGHTING SHALL BE PROVIDED AT ALL TIMES. COVERED |
| | WALKWAYS SHALL BE DESIGNED TO SUPPORT ALL IMPOSED |
| | LOADS. IN NO CASE SHALL THE DESIGN LIVE LOAD BE LESS |
| | THAN 150 PSF FOR THE ENTIRE STRUCTURE. |
| | |
| | 10) COMPLIED. POLLUTION PREVENTION PLAN. 2014 FBC-B |
| | 3307. |
| | |
| | 11) PROVISO: DEFERRED SUBMITTAL . 2014 FBC-B 3306.9 |
| | ADJACENT TO EXCAVATIONS. STRUCTURAL NOTES S1.01. |
| | |
| | 11A) PROVISO: DEFERRED SUBMITTAL. STRUCTURAL NOTES |
| | S1.01 AND SOILS REPORT BY LANGAN ENGINEERING SOILS |
| | REPORT MAY 21/ 2015. 2014 FBC-B 3307.1 PROTECTION |
| | REQUIRED. ADJOINING PUBLIC AND PRIVATE PROPERTY SHALL |
| | BE PROTECTED FROM DAMAGE DURING CONSTRUCTION AND |
| | DEMOLITION WORK. PROTECTION SHALL BE PROVIDED FOR |
| | FOOTINGS, FOUNDATIONS, PARTY WALLS, CHIMNEYS, SKYLIGHTS |
| | AND ROOFS. WITH THE EXCAVATION AND AUGER CAST PILE HOW |
| | WILL THE BUILDING TO THE SOUTH BE PROTECTED FROM |
| | SETTLEMENT? |
| | |
| | 11B) COMPLIED. NOTED ON PLAN. 2014 FBC-B 3307.1 THE |
| | PERSON MAKING OR CAUSING AN EXCAVATION TO BE MADE SHALL |
| | PROVIDE WRITTEN NOTICE TO THE OWNERS OF ADJOINING |
| | BUILDINGS ADVISING THEM THAT THE EXCAVATION IS TO BE |
| | MADE AND THAT THE ADJOINING BUILDINGS SHOULD BE |
| | PROTECTED. SAID NOTIFICATION SHALL BE DELIVERED NOT |
| | LESS THAN 10 DAYS PRIOR TO THE SCHEDULED STARTING DATE |
| | OF THE EXCAVATION. |
| | |
| | 12) COMPLIED. NOTED ON PLAN. WHEN EXCAVATING WILL THE |
| | EXCESS SOILS BE STORED ON SITE? 2014 FBC-B 3304.1.2 |
| | SURCHARGE. NO FILL OR OTHER SURCHARGE LOADS SHALL BE |
| | PLACED ADJACENT TO ANY BUILDING OR STRUCTURE UNLESS |
| | SUCH BUILDING OR STRUCTURE IS CAPABLE OF WITHSTANDING |
| | THE ADDITIONAL LOADS CAUSED BY THE FILL OR SURCHARGE. |
| | EXISTING FOOTINGS OR FOUNDATIONS WHICH CAN BE AFFECTED |
| | BY ANY EXCAVATION SHALL BE UNDERPINNED ADEQUATELY OR |
| | OTHERWISE PROTECTED AGAINST SETTLEMENT AND SHALL BE |
| | PROTECTED AGAINST LATER MOVEMENT. |
| | |
| | 13-19) COMPLIED. |
| | |
| | 20) SHEET A0.01; |
| | 20A-C)COMPLIED. |
| | |
| | |
| | 20D) BUILDING PROVISO: PRODUCT APPROVALS LISTED BELOW |
| | CAN BE DEFERRED SUBMITTALS WITH THE APPROVAL OF EITHER |
| | THE DESIGNER OF RECORD OR CONTRACTOR ONCE THE WIND |
| | DESIGN CRITERIA IS REVIEWED AND APPROVED THEN THE |
| | SUBMITTALS CAN BE SUBMITTED AFTER PERMIT ISSUANCE. |
| | 107.3.4.2 DEFERRED SUBMITTALS. |
| | 2014 FBC-B 1609.1.2 PROTECTION OF OPENINGS, |
| | 1609.6.4.4.1 COMPONENTS & CLADDING. FLORIDA DEPARTMENT |
| | OF COMMUNITY AFFAIRS RULE 9N-3 NOV. 01/ 2010 (31) |
| | SUB-CATEGORY OF PRODUCTS OR CONSTRUCTION SYSTEMS THAT |
| | WILL REQUIRE PRODUCT APPROVALS: |
| | (31)(A) EXTERIOR DOORS. |
| | (B) WINDOWS, MULLIONS |
| | (C) PANEL WALLS: STOREFRONTS, CURTAIN WALLS, WALL |
| | LOUVERS, EFIS SYSTEMS, |
| | (D) ROOFING PRODUCTS AND ASSEMBLIES, ROOF TOP CURBS, |
| | INTAKE AND EXHAUST FANS |
| | (E) SHUTTERS |
| | (F) SKYLIGHTS |
| | (G PRE-ENGINEERED A/C STANDS |
| | FBC 107.3.4.1 PRODUCT APPROVALS. THOSE PRODUCTS WHICH |
| | ARE REGULATED BY THE DCA RULE 9N-03 SHALL BE REVIEWED |
| | AND APPROVED IN WRITING BY THE DESIGNER OF RECORD PRIOR |
| | TO SUBMITTAL FOR JURISDICTIONAL APPROVAL. FL |
| | 61G1-23.015 (2) THE ARCHITECT IS RESPONSIBLE FOR |
| | SUPERVISING AND REVIEWING ALL PROJECT DATA, REPORTS, |
| | SHOP DRAWINGS ETC.. |
| | |
| | 20E) BUILDING PROVISO, DEFERRED SUBMITTALS PRODUCT |
| | APPROVALS & SHOP DRAWINGS. |
| | IDENTIFY GLAZING/ MULLIONS. FOR ALL PRODUCTS WITH |
| | GLAZING, PLEASE IDENTIFY THE OPENING WIDTH & HEIGHT, |
| | TYPE OF GLAZING, MULLION INFORMATION IF REQUIRED, |
| | ATTACHMENTS AND ASSOCIATE PRESSURES FOR EACH OPENING |
| | SIZE. 107.2.1 CONSTRUCTION DOCUMENTS SHALL BE OF |
| | SUFFICIENT CLARITY TO INDICATE THE LOCATION, NATURE AND |
| | EXTENT OF THE WORK PROPOSED AND SHOW IN DETAIL THAT IT |
| | WILL CONFORM TO THE PROVISIONS OF THIS CODE AND |
| | RELEVANT LAWS, ORDINANCES, RULES AND REGULATIONS, AS |
| | DETERMINED BY THE BUILDING OFFICIAL. |
| | |
| | 20F) COMPLIED. ROOFING PRODUCT APPROVALS: |
| | MIAMI-DADE NOA 15-1026.10 SEAMAN CORP FIBER TITE SINGLE |
| | PLY ROOF SYSTEMS OVER CONCRETE DECK PAGE 25 OF 51 -240 |
| | PSF LIMITATION # 9. |
| | FLORIDA APPROVAL 7989-R1 ATLAS ROOFING INSULATION AC |
| | FOAM III. |
| | |
| | |
| | 21A) COMPLIED. |
| | |
| | 21B) SEMI COMPLIED. ON SHEET A2.05 THE PLANS SHOW A |
| | TOTAL OF 3 ACCESSIBLE PARKING SPACES. IN THE |
| | RECONFIGURATION OF ACCESSIBLE PARKING SPACES THE |
| | PARKING SPACE ACCESS AISLE HAS BEEN LEFT OUT. 2014 |
| | FBC-ACCESSIBILITY 502.3 (1-3) PARKING SPACE ACCESS |
| | AISLE. PLEASE ALSO NOTE ON SHEETS A2.03 AND A2.04 IN |
| | ALL NON- PARKING AREAS THE FLOOR IS DIAGONALLY STRIPED. |
| | |
| | 22-24A) COMPLIED |
| | |
| | 24B) COMPLIED. SHEET A1.12 LIFE SAFETY 3 STAIRS ARE A |
| | MINIMUM OF 57 INCHES/ 0.3= 190 OCC. X 3= 570 OCCUPANTS. |
| | |
| | 24C) COMPLIED. CONFERENCE ROOMS 2 MEANS OF EGRESS. |
| | |
| | 24D) 3RD REQUEST FOR CODE COMPLIANCE FOR A 2 STORY |
| | ATRIUM. THE RESPONSE INDICATES THIS IS NOT A 2 STORY |
| | ATRIUM BECAUSE IT DOES NOT COMMUNICATE WITH ANY OTHER |
| | FLOOR. SHEET A1.12 THE 2ND STORY HAS A NOTE STATING |
| | SMOKE SEPARATION FULL HEIGHT GLAZING WITH TYCO WS |
| | SPRINKLERS. THIS IS THE EXCEPTION 1 FOR 404.6 |
| | ENCLOSURES OF ATRIUMS. WILL NEED TO MEET THE EXCEPTION |
| | 1.1 AND 1.2 GLAZING IN A GASKETED FRAME. |
| | FBC-B 404.6 ATRIUMS SPACES SHALL BE SEPARATED FROM |
| | ADJACENT SPACES BY A 1 HOUR FIRE BARRIER. |
| | |
| | IF YOU DO NOT HAVE A FIRE BARRIER BETWEEN THE 1ST FLOOR |
| | AND SECOND FLOOR THEY WILL COMMUNICATE, THUS BEING A 2 |
| | STORY ATRIUM. THE FIRE BARRIER BETWEEN THE 1ST FLOOR |
| | FIRE AREA AND 2ND FLOOR FIRE AREA IS A COMMON WALL A |
| | PORTION OF THE WALL IS GLAZED. COMPLIANCE WITH FBC-B |
| | 707.3.10 AND TABLE 707.3.10 SHALL BE ACHIEVED . PLEASE |
| | ALSO REVIEW 707.6 OPENINGS IN FIRE BARRIERS AND THEIR |
| | EXCEPTIONS, PLEASE PROVIDE WHICH METHOD OF CODE |
| | COMPLIANCE WILL BE ACHIEVED. |
| | |
| | 24E) COMPLIED. |
| | |
| | 25A-D) COMPLIED. |
| | |
| | 25E) SEMI-COMPLIED. SHEET A6.12 THE NOTE FOR BI-PARTING |
| | DOORS IS ONLY ON THE ONE FLOOR, PLEASE PLACE NOTE FOR |
| | ALL LEVELS SHOWING THIS IS A CLOSED SHAFT WITH OPENING |
| | PROTECTIVES IN COMPLIANCE WITH FBC-B 716.5 AND ALSO FOR |
| | FALL PROTECTION IN COMPLIANCE WITH FBC-B 1013.2 GUARDS. |
| | |
| | 25F) COMPLIED. |
| | |
| | 25G) SEMI-COMPLIED. SEE COMMENT 21B. SHEET A2.05 LIFE |
| | SAFETY PLAN INDICATES 2 ACCESSIBLE PARKING STALLS WITH |
| | COLUMNS IN THE ACCESS AISLE. PLEASE PROVIDE THE CLEAR |
| | WIDTH FROM THE COLUMN TO THE ACCESSIBLE PARKING STALL. |
| | FBC-ACCESSIBILITY CODE 502.3.1 WIDTH. ACCESS AISLES |
| | SERVING CAR AND VAN PARKING SPACES SHALL BE 60 INCHES |
| | (1525 MM) WIDE MINIMUM. |
| | |
| | |
| | |
| | 26) SHEET A1.16 6TH FLOOR LIFE SAFETY PLAN & A7.05 & |
| | A7.06 ENLARGED FLOOR PLAN 6TH FLOOR. |
| | 26A-E) COMPLIED. |
| | |
| | |
| | 26F) BUILDING PROVISO/ DEFERRED SUBMITTAL: OPEN AIR |
| | TERRACE WATERPROOFING MATERIAL AND DETAILS. SHEET 5.11. |
| | ADMINISTRATION 107.3.4 DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE. THE REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE SHALL BE RESPONSIBLE |
| | FOR REVIEWING AND COORDINATING SUBMITTAL DOCUMENTS |
| | PREPARED BY OTHERS, INCLUDING PHASED AND DEFERRED |
| | SUBMITTAL ITEMS, FOR COMPATIBILITY WITH THE DESIGN OF |
| | THE BUILDING. PRODUCTS SHALL BE REVIEWED AND APPROVED |
| | IN WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL |
| | FOR JURISDICTIONAL APPROVAL. |
| | |
| | 26G) BUILDING PROVISO/ DEFERRED SUBMITTALS: OPEN AIR |
| | TERRACE VIVA BLADE GUARD RAIL SYSTEM. SHEET 5.11. |
| | ADMINISTRATION 107.3.4 DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE. THE REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE SHALL BE RESPONSIBLE |
| | FOR REVIEWING AND COORDINATING SUBMITTAL DOCUMENTS |
| | PREPARED BY OTHERS, INCLUDING PHASED AND DEFERRED |
| | SUBMITTAL ITEMS, FOR COMPATIBILITY WITH THE DESIGN OF |
| | THE BUILDING. PRODUCTS SHALL BE REVIEWED AND APPROVED |
| | IN WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL |
| | FOR JURISDICTIONAL APPROVAL. |
| | |
| | 26H) **IN REVIEW BY THE BUILDING OFFICIAL / ALTERNATE |
| | MATERIALS & METHODS OF CONSTRUCTION 107.11** |
| | COMMON COMMENT FOR ALL FLOORS (6-12) WHERE THE |
| | ALLOWABLE COMMON PATH OF TRAVEL IS EXCEEDED. EXAMPLE: |
| | ROOMS 604 & 605 FROM THE MOST REMOTE POINT IN THE SUITE |
| | TO THE NEAREST VERTICAL EXIT IS OVER THE ALLOWABLE 75 |
| | FT. TO ACHIEVE THE ALLOWABLE 75 FT. A RATED WALL IS |
| | INSTALLED IN THE EXIT ACCESS CORRIDOR, ON THE DOOR |
| | SCHEDULE THIS DOOR IS NOT FIRE RATED. PLEASE PROVIDE A |
| | CODE SECTION WHERE THIS IS ALLOWED TO BE CONSIDERED |
| | CODE COMPLIANT. 2014 FBC-B TABLE 1014.3. DEFINITION: |
| | COMMON PATH OF EGRESS TRAVEL. THAT PORTION OF EXIT |
| | ACCESS WHICH THE OCCUPANTS ARE REQUIRED TO TRAVERSE |
| | BEFORE TWO SEPARATE AND DISTINCT PATHS OF EGRESS TRAVEL |
| | TO TWO EXITS ARE AVAILABLE. PATHS THAT MERGE ARE COMMON |
| | PATHS OF TRAVEL. COMMON PATHS OF EGRESS TRAVEL SHALL BE |
| | INCLUDED WITHIN THE PERMITTED TRAVEL DISTANCE. |
| | |
| | 27) **IN REVIEW BY THE BUILDING OFFICIAL / ALTERNATE |
| | MATERIALS & METHODS OF CONSTRUCTION 107.11** |
| | SHEET A1.18 & A7.09 & A7.10. THE 8TH, 10TH & 12TH |
| | FLOORS. THIS COMMENT FOR THE ROOMS 818,819,1018, |
| | 1019,1218 & 1219 ALL EXCEED THE ALLOWABLE 75 FT. |
| | ALLOWABLE COMMON PATH OF TRAVEL OF 75 FT. 2014 FBC-B |
| | TABLE 1014.3 |
| | |
| | 28) COMPLIED. |
| | |
| | 29) SHEET A2.09 & A7.41 13TH FLOOR ROOFTOP GARDEN: |
| | |
| | 29A-E) COMPLIED. |
| | |
| | 29F) 3RD REQUEST. SHEET A6.14 SHOWS THE ROOF HATCH TO |
| | BE 2.5 FT X 3 FT. = 7.5 FEET NOT 16 FEET. SEE COMMENTS |
| | BELOW. STAIRWELL # 1 SHOWS A LADDER TO GAIN ACCESS TO |
| | THE ROOF TOP EQUIPMENT. PLEASE REVIEW : |
| | 2014 FBC-B 1009.16.1 EXCEPTION. IN BUILDINGS WITHOUT AN |
| | OCCUPIED ROOF, ACCESS TO THE ROOF SHALL BE PERMITTED TO |
| | BE A ROOF HATCH OR TRAP DOOR NOT LESS THAN 16 SQUARE |
| | FEET IN AREA AND HAVING A MINIMUM DIMENSION OF 2 FEET . |
| | |
| | 30) BUILDING PROVISO: POOL AND JACUZZI ARE NOT PART OF |
| | THIS PERMIT, WILL REQUIRE A SEPARATE PERMIT, REVIEW AND |
| | ASSOCIATED FEES. |
| | |
| | 31) BUILDING PROVISO: FENCING AND GATES AROUND THE POOL |
| | WILL REQUIRE A SEPARATE PERMIT, REVIEW AND ASSOCIATED |
| | FEES. |
| | |
| | |
| | |
| | |
| | |
| | 32-34) COMPLIED. |
| | |
| | 35) BUILDING PROVISO: DEFERRED SUBMITTAL. SHEETS A6.02 |
| | & A6.03 STAIR GUARDRAIL/ HANDRAILS . ADMINISTRATION |
| | 107.3.4 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE. THE |
| | REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE SHALL BE RESPONSIBLE |
| | FOR REVIEWING AND COORDINATING SUBMITTAL DOCUMENTS |
| | PREPARED BY OTHERS, INCLUDING PHASED AND DEFERRED |
| | SUBMITTAL ITEMS, FOR COMPATIBILITY WITH THE DESIGN OF |
| | THE BUILDING. |
| | FL 61G-15-30.006 (3) THE DELEGATED ENGINEER SHALL |
| | FORWARD THE DELEGATED ENGINEERING DOCUMENTS TO THE |
| | ENGINEER OF RECORD FOR REVIEW. |
| | |
| | 36A-B) COMPLIED. |
| | |
| | 36C) BUILDING PROVISO/ DEFERRED SUBMITTAL. ON THE TOP |
| | OF THE 8 FT. CONCRETE CANOPY WHAT PRODUCT WILL BE USED |
| | TO KEEP MOISTURE FROM SEEPING INTO THE CONCRETE SLAB |
| | AND REINFORCEMENT? |
| | |
| | 37) BUILDING PROVISO/ DEFERRED SUBMITTAL. SHEET A4.01 |
| | THE NORTH WALL ELEVATION ON THE GARAGE LEVELS 3-5 THE |
| | PLANS SHOW PERFORATED ALUMINUM PANEL SYSTEM. PLEASE |
| | PROVIDE PRODUCT LITERATURE, AND ENGINEERING ANALYSIS OF |
| | THE SYSTEM, WITH THE WIND DESIGN CRITERIA AND ANCHORING |
| | SYSTEMS REVIEWED BY THE ENGINEER OF RECORD. FL |
| | 61G-15-30.006 (3) THE DELEGATED ENGINEER SHALL FORWARD |
| | THE DELEGATED ENGINEERING DOCUMENTS TO THE ENGINEER OF |
| | RECORD FOR REVIEW. 2014 FBC-B 1503.1 ROOF DECKS SHALL |
| | BE COVERED WITH APPROVED ROOF COVERINGS SECURED TO THE |
| | BUILDING OR STRUCTURE IN ACCORDANCE WITH THE PROVISIONS |
| | OF THIS CHAPTER. ROOF COVERINGS SHALL BE DESIGNED AND |
| | INSTALLED IN ACCORDANCE WITH THIS CODE AND THE APPROVED |
| | MANUFACTURER?S INSTRUCTIONS SUCH THAT THE ROOF COVERING |
| | SHALL SERVE TO PROTECT THE BUILDING OR STRUCTURE. |
| | |
| | 38) COMPLIED. FIRE COMMAND CENTER LAYOUT. FBC-B |
| | 911.1.4. |
| | |
| | |
| | |
| | 38A) PLEASE SHOW COMPLIANCE WITH FBC-B 911.1.4. LAYOUT |
| | APPROVAL. A LAYOUT OF THE FIRE COMMAND CENTER AND ALL |
| | FEATURES REQUIRED BY THIS SECTION TO BE CONTAINED |
| | THEREIN SHALL BE SUBMITTED FOR APPROVAL PRIOR TO |
| | INSTALLATION. |
| | |
| | 38B) 911.1.5 REQUIRED FEATURES. |
| | THE FIRE COMMAND CENTER SHALL COMPLY WITH NFPA 72 AND |
| | SHALL CONTAIN THE FOLLOWING FEATURES: |
| | |
| | 1-5) SHEET E4.02 |
| | |
| | 6. COMPLIED 909.16 FOR SMOKE CONTROL SYSTEMS INSTALLED |
| | IN THE BUILDING. |
| | |
| | 7-12) E4.02. |
| | |
| | BUILDING PROVISO/ DEFERRED SUBMITTAL: |
| | 13. AN APPROVED BUILDING INFORMATION CARD THAT |
| | CONTAINS, BUT IS NOT LIMITED TO, THE FOLLOWING |
| | INFORMATION, 13.1-13.7: |
| | |
| | 13.1. GENERAL BUILDING INFORMATION THAT INCLUDES: |
| | PROPERTY NAME, ADDRESS, THE NUMBER OF FLOORS IN THE |
| | BUILDING (ABOVE AND BELOW GRADE), USE AND OCCUPANCY |
| | CLASSIFICATION (FOR MIXED USES, IDENTIFY THE DIFFERENT |
| | TYPES OF OCCUPANCIES ON EACH FLOOR), ESTIMATED BUILDING |
| | POPULATION (I.E., DAY, NIGHT, WEEKEND); |
| | |
| | 13.2. BUILDING EMERGENCY CONTACT INFORMATION THAT |
| | INCLUDES: A LIST OF THE BUILDING?S EMERGENCY CONTACTS |
| | (E.G., BUILDING MANAGER, BUILDING ENGINEER, ETC.) AND |
| | THEIR RESPECTIVE WORK PHONE NUMBER, CELL PHONE NUMBER, |
| | EMAIL ADDRESS; |
| | |
| | 13.3. BUILDING CONSTRUCTION INFORMATION THAT INCLUDES: |
| | THE TYPE OF BUILDING CONSTRUCTION (E.G., FLOORS, WALLS, |
| | COLUMNS, AND ROOF ASSEMBLY); |
| | |
| | 13.4. EXIT STAIR INFORMATION THAT INCLUDES: NUMBER OF |
| | EXIT STAIRS IN BUILDING, EACH EXIT STAIR DESIGNATION |
| | AND FLOORS SERVED, LOCATION WHERE EACH EXIT STAIR |
| | DISCHARGES, EXIT STAIRS THAT ARE PRESSURIZED, EXIT |
| | STAIRS PROVIDED WITH EMERGENCY LIGHTING, EACH EXIT |
| | STAIR THAT ALLOWS REENTRY, EXIT STAIRS PROVIDING ROOF |
| | ACCESS; ELEVATOR INFORMATION THAT INCLUDES: NUMBER OF |
| | ELEVATOR BANKS, ELEVATOR BANK DESIGNATION, ELEVATOR CAR |
| | NUMBERS AND RESPECTIVE FLOORS THAT THEY SERVE, LOCATION |
| | OF ELEVATOR MACHINE ROOMS, LOCATION OF SKY LOBBY, |
| | LOCATION OF FREIGHT ELEVATOR BANKS; |
| | |
| | 13.5. BUILDING SERVICES AND SYSTEM INFORMATION THAT |
| | INCLUDES: LOCATION OF MECHANICAL ROOMS, LOCATION OF |
| | BUILDING MANAGEMENT SYSTEM, LOCATION AND CAPACITY OF |
| | ALL FUEL OIL TANKS, LOCATION OF EMERGENCY GENERATOR, |
| | LOCATION OF NATURAL GAS SERVICE; |
| | |
| | 13.6. FIRE PROTECTION SYSTEM INFORMATION THAT INCLUDES: |
| | LOCATIONS OF STANDPIPES, LOCATION OF FIRE PUMP ROOM, |
| | LOCATION OF FIRE DEPARTMENT CONNECTIONS, FLOORS |
| | PROTECTED BY AUTOMATIC SPRINKLERS, LOCATION OF |
| | DIFFERENT TYPES OF SPRINKLER SYSTEMS INSTALLED (E.G., |
| | DRY, WET, PRE-ACTION, ETC.); AND |
| | |
| | 13.7 HAZARDOUS MATERIAL INFORMATION THAT INCLUDES: |
| | LOCATION OF HAZARDOUS MATERIAL, QUANTITY OF HAZARDOUS |
| | MATERIAL. |
| | |
| | 14. COMPLIED. WORK TABLE. |
| | |
| | 15.COMPLIED. E4.02. GENERATOR SUPERVISION DEVICES, |
| | MANUAL START AND TRANSFER FEATURES. E4.02 |
| | |
| | 16. COMPLIED. E4.02. PUBLIC ADDRESS SYSTEM, WHERE |
| | SPECIFICALLY REQUIRED BY OTHER SECTIONS OF THIS CODE. |
| | |
| | 17 COMPLIED. E4.02. . ELEVATOR FIRE RECALL SWITCH IN |
| | ACCORDANCE WITH ASME A17.1. |
| | |
| | 18. COMPLIED. E4.02. ELEVATOR EMERGENCY OR STANDBY |
| | POWER SELECTOR SWITCH(ES), WHERE EMERGENCY OR STANDBY |
| | POWER IS PROVIDED. |
| | |
| | 39) COMPLIED. 2014 FBC-B 403.5.3 STAIRWAY DOOR |
| | OPERATION. |
| | |
| | 40) COMPLIED. 909.4 ANALYSIS, SMOKE CONTROL. |
| | |
| | 41) COMPLIED. FBC-B 403.5.5 LUMINOUS EGRESS PATH |
| | MARKINGS. |
| | |
| | 42) NEW COMMENT, COMMENT #9 UNDER THIS MECHANICAL |
| | REVIEW. THE SHEET M2.02 IN STAIRWELL # 2 NOTE # 7 |
| | INDICATES DUCT IN THE STAIRWELL TO HAVE A 2 HOUR FIRE |
| | RATING. TO USE FLAMEBAR. SHEET A6.01A DETAIL 01 DOES |
| | NOT SHOW A DUCT GOING THROUGH THE STAIRWELL. SHEET |
| | A6.03 DETAILS 03 & 04 ARE CUT SECTIONS THROUGH THE |
| | STAIRWELL 2 BUT AGAIN NO DUCTS ARE SHOWN PENETRATING |
| | THE STAIRWELL ENCLOSURE. |
| | 2014 FBC-B 1022.5 PENETRATIONS. PENETRATIONS INTO AND |
| | OPENINGS THROUGH INTERIOR EXIT STAIRWAYS AND RAMPS ARE |
| | PROHIBITED EXCEPT FOR REQUIRED EXIT DOORS, EQUIPMENT |
| | AND DUCTWORK NECESSARY FOR INDEPENDENT VENTILATION OR |
| | PRESSURIZATION, SPRINKLER PIPING, STANDPIPES, |
| | ELECTRICAL RACEWAY FOR FIRE DEPARTMENT COMMUNICATION |
| | SYSTEMS AND ELECTRICAL RACEWAY SERVING THE INTERIOR |
| | EXIT STAIRWAY AND RAMP AND TERMINATING AT A STEEL BOX |
| | NOT EXCEEDING 16 SQUARE INCHES (0.010 M2). SUCH |
| | PENETRATIONS SHALL BE PROTECTED IN ACCORDANCE WITH |
| | SECTION 714. THERE SHALL BE NO PENETRATIONS OR |
| | COMMUNICATING OPENINGS, WHETHER PROTECTED OR NOT, |
| | BETWEEN ADJACENT INTERIOR EXIT STAIRWAYS AND RAMPS. |
| | |
| | 43) NEW COMMENT, COMMENT #12 UNDER THIS MECHANICAL |
| | REVIEW. THE SHAFT ENCLOSING THE OAR-1 DUCT SHALL BE |
| | CONTINUOUS THROUGH THE ELEVATOR LOBBY AND GARAGE PER |
| | FBC ?B 707.5, 711.4 & 713.5. |
| | |
| | 44) BEFORE A PERMIT TO CONSTRUCT, MAY BE ISSUED, IMPACT |
| | FEES MUST BE PAID TO PALM BEACH COUNTY. THE ACTUAL |
| | PERMIT SET OF PLANS MUST BE STAMPED BY THAT OFFICE, AND |
| | A COPY OF THE PAID RECEIPT ATTACHED TO THE PERMIT |
| | APPLICATION. PLEASE CALL (561)233-5025 FOR MORE |
| | INFORMATION. |
| | |
| | 45) WHEN RESUBMITTING PLANS PLEASE INDICATE THE |
| | REVISION & REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES |
| | AS NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | JAMES A. WITMER CBO |
| | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER |
| | CONSTRUCTION SERVICES DIVISION |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | TEL: 561-805-6715 |
| | FAX: 561-805-6676 |
| | E-MAIL: [email protected] |
| | |