| Date |
Text |
| 2016-12-27 11:56:19 | GAS REVIEW |
| | 1) SHOW THE DEVELOPED LENGTH OF THE PIPING FROM THE |
| | SECOND STAGE REGULATOR TO THE FURTHEST OUTLET. THIS |
| | DISTANCE IS USED FOR THE SIZING OF THE LOW PRESSURE |
| | SYSTEM.2ND REQUEST. |
| | 2) SHT. P4.10 - THE BTU LOAD FOR THE TWO DOMESTIC |
| | BOILERS ADDS TO 1,500 MBTU BUT THE PLANS SHOW 1,700 |
| | MBTU. CLARIFY. 2ND REQUEST. |
| | 3) SHT. P4.10 - KEYNOTE #10 SHOWS TWO BOILERS AT 199 |
| | MBTU EACH WHICH IS 398 MBTU BUT THE RISER SHOWS 798 |
| | MBTU. CLARIFY.2ND REQUEST. |
| | 4) MY CALCULATION OF BTU'S AT ONE SECTION OF THE GAS |
| | RISER IS 1,898 MBTU BUT THE PLAN SHOWS 2,498 MBTU. |
| | THERE IS ANOTHER SECTION WITH A BTU LOAD OF 3,698 MBTU |
| | AND MY CALCULATIONS ADD TO 3,098 MBTU. CLARIFY.2ND |
| | REQUEST. |
| | 5) THE TOTAL BTU LOAD ON THE SYSTEM SHOULD BE 4,413 |
| | MBTU. PLEASE CHECK THE CALCULATIONS.2ND REQUEST. |
| | 6) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS FOR THE |
| | GAS REGULATORS. FGC SEC. 410.1, 410.2.2ND REQUEST.THE |
| | NARRATIVE REFERS TO NOTE #13 ON SHT. P4.10 - NOTE #13 |
| | REFERS TO THE VENTLESS PRESSURE REGULATOR. |
| | 7) SUBMIT MANUF. SPECIFICATION SHEETS FOR THE ALL GAS |
| | EQUIPMENT AND APPLIANCES. APPLIANCES REGULATED BY THE |
| | CODE SHALL BE LISTED AND LABELED. FGC 301.3. |
| | 8) SUBMIT CALCULATIONS FOR COMBUSTION AIR FOR ALL GAS |
| | FIRED EQUIPMENT (KITCHEN EQUIPMENT, DRYERS, POOL |
| | EQUIPMENT, BOILERS, ETC.) PER FGC SEC. 304. SEE FGC |
| | SEC. 304.9.3 FOR COMBUSTION AIR BEING SUPPLIED BY |
| | MECHANICAL SYSTEMS. |
| | 9) SHT. M2.01 - KITCHEN GAS APPLIANCE CALCULATIONS - IN |
| | ACCORDANCE WITH 2014 FBC-FUEL GAS SEC.304.9.3 - THE |
| | MAKEUP AIR FOR THE EXHAUST FOR THE HOOD CANNOT BE USED |
| | TO SUPPLY COMBUSTION AIR TO THE APPLIANCES. |
| | 10) SUBMIT SPECIFICATIONS FOR THE BOILER, VENT DETAILS, |
| | VENT PIPING, ETC. WPB AMEND. TO FBC SEC. 107.2.1. |
| | 11) SUBMIT DETAILS FOR DRYER VENTS, TERMINATION POINTS, |
| | VENT MATERIAL, ETC. WPB AMEND. TO FBC SEC. 107.2.1. |
| | 12) SHT. K1 PRS SHOWS GAS APPLIANCE PBF-1 (DECK |
| | OVEN/PIZZA) AT 140 MBTU. I DO NOT SEE THIS APPLIANCE OR |
| | THE BTU VALUE ON THE GAS PLANS. CLARIFY. |
| | 13) SUBMIT SPECS .FOR THE PVC VENTS FOR THE BOILERS TO |
| | CONFIRM PVC IS APPROVED.SHOW THE HEIGHT ABOVE THE ROOF, |
| | ANCHORING DETAILS (IF APPLICABLE), COMPLY WITH 2014 |
| | FBC-FUEL GAS SEC. |
| | 14) SUBMIT DETAILS FOR THE DRYER VENTS, VENT MATERIAL, |
| | HEIGHT ABOVE ROOF, ANCHORING DETAILS (IF APPLICABLE). |
| | IF PVC IS USED, SUBMIT DETAILS FROM DRYER MANUF. TO |
| | SHOW PVC IS APPROVED TO BE USED.ROOF THE RESPONSE |
| | NARRATIVE REFERS TO SHT. M2.10, NOTES #2,3,& 4. THESE |
| | NOTES HAVE NOTHING TO DO WITH THE DRYER VENTS. THE |
| | LAUNDRY IS ON THE 2ND FLOOR, NOT THE ROOF. |
| | 15) INDICATE THE POOL/SPA BOILERS ON THE PLANS.WPB |
| | AMEND. TO FBC SEC. 107.2.1. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805 PLUMBING PLAN REVIEW |
| | -6692 |
| | [email protected] |
| | |
| | |