| 2016-07-14 15:00:41 | REVIEW FBC-14 MECHANICAL |
| | PERMIT #16061443 |
| | CANOPY HOTEL |
| | 7/12/16 |
| | |
| | NOTE: UNLESS NOTED OTHERWISE ALL COMMENTS REFERENCE THE |
| | FLORIDA BUILDING CODE FIFTH EDITION 2014 MECHANICAL. |
| | |
| | 1) SUBMIT THE FOLLOWING LIST OF SUPPORTING DOCUMENTS |
| | FOR THE PROPOSED PROJECT: |
| | |
| | A) ENERGY CALCULATIONS- SECTION C101.2 & C401.2 FBC-14 |
| | ENERGY CONSERVATION. |
| | B) SYSTEM COMMISSIONING PLAN- SECTION C408 FBC-14 |
| | ENERGY CONSERVATION. |
| | C) SMOKE CONTROL SPECIAL INSPECTION AND TEST |
| | REQUIREMENTS REPORT- SECTION 513.3 |
| | D) SMOKE CONTROL RATIONAL ANALYSIS- SECTION 513.4. |
| | E) AC COOLING AND HEATING CALCULATIONS- SECTION |
| | C403.2.1 FBC-14 ENERGY CONSERVATION (PLEASE NOTE THAT |
| | THE CALCULATIONS SUBMITTED DO NOT INCLUDE THESE |
| | SYSTEMS: OARTU-1, AHU'S 1-12, AND VRV SYSTEMS FC-2.9, |
| | FC-2.10, FC-3T-H, FC-13.1, & FC-13.2). |
| | F) AC CALCULATION SUBMITTAL PACKAGE: PLEASE PROVIDE A |
| | SIGNED AND SEALED INDEX SHEET LISTING ALL UNITS |
| | CONTAINED IN THE DOCUMENT. |
| | G) FLORIDA PRODUCT APPROVALS AND/OR MIAMI-DADE NOA'S |
| | FOR ALL EXHAUST OUTLET AND AIR INTAKE LOUVERS, ROOFTOP |
| | AND SIDEWALL FANS, AC ROOF STANDS AND WALL BRACKETS, |
| | ROOFTOP AC AND FAN CURBS. ALL SUBMITTALS SHALL BEAR THE |
| | SHOP DRAWING APPROVAL SIGNATURE BY THE ENGINEER OF |
| | RECORD. |
| | H) PRODUCT DATA SUBMITTALS FOR ALL SMOKE CONTROL FANS, |
| | FIRE AND FIRE/SMOKE DAMPERS, DUCT SMOKE DETECTORS, |
| | CARBON MONOXIDE DETECTORS, MOTORIZED DAMPERS, FLAMEBAR |
| | DUCTWORK, REFRIGERANT PIPING INSULATIONS, LAUNDRY |
| | APPLIANCES, KITCHEN COOKING APPLIANCES, KITCHEN EXHAUST |
| | HOODS AND FANS, VRV UNITS, AND BOILER AND BOILER VENT |
| | PIPING. ALL SUBMITTALS SHALL BEAR THE SHOP DRAWING |
| | APPROVAL STAMP AND SIGNATURES OF THE EOR. |
| | |
| | 2) PROVIDE MINIMUM VENTILATION CALCULATIONS FOR ALL |
| | ROOMS AND SPACES- TABLE 403.3. PROVIDE ON THE PLAN A |
| | SCHEDULE THAT INDICATES THE REQUIRED AND PROVIDED CFMS |
| | OF OUTDOOR AIR FOR ALL ROOMS AND SPACES. |
| | |
| | 3) PROVIDE EXHAUST VENTILATION CALCULATIONS INCLUDING A |
| | SCHEDULE ON THE PLAN INDICATING THE REQUIRED AND |
| | PROVIDED CFMS OF EXHAUST WHERE REQUIRED INCLUDING BUT |
| | NOT LIMITED TO THE PARKING GARAGES, THE GROUND FLOOR |
| | AND ROOFTOP KITCHENS, THE GENERATOR ROOM, THE LAUNDRY |
| | ROOM, SOILED LINEN ROOM, TRASH ROOM, JANITOR'S CLOSETS, |
| | POOL EQUIPMENT ROOM, LOCKER ROOMS ETC. PLEASE SEE TABLE |
| | 403.3 AND SECTION 404 FBC-14 MECHANICAL, AND TABLE 6-4 |
| | ASHRAE 62.1- 2010. A) THE PLAN INDICATES TOILET EXHAUST |
| | FROM THE GUEST ROOMS DISCHARGING INTO THE OARTU-1, |
| | HOWEVER PER TABLE 403.3 FOOTNOTE G, RECIRCULATION IS |
| | PROHIBITED EXCEPT THAT RECIRCULATION SHALL BE PERMITTED |
| | WHERE THE RESULTING SUPPLY AIRSTREAM CONSISTS OF NOT |
| | MORE THAN 10% AIR RECIRCULATED FROM THE TOILET ROOMS. |
| | PROVIDE CALCULATIONS TO VERIFY COMPLIANCE. |
| | |
| | 4) PROVIDE AIR BALANCE CALCULATIONS- SECTION 501.4 |
| | |
| | 5) THE SUBMITTED AC CALCULATIONS ARE INCORRECTLY |
| | INDICATING MIAMI AS THE LOCATION OF THE PROJECT- PLEASE |
| | CORRECT. |
| | |
| | 6) WHERE OUTDOOR AIR INTAKES ARE SHOWN ON THE |
| | MECHANICAL PLANS, PLEASE PROVIDE THE CLEARANCE DISTANCE |
| | MEASUREMENTS AS INDICATED IN SECTION 401.4. WHERE |
| | EXHAUST OUTLETS ARE SHOWN ON THE MECHANICAL PLANS |
| | PLEASE PROVIDE THE CLEARANCE DISTANCE MEASUREMENTS AS |
| | INDICATED IN SECTION 501.3.1. |
| | |
| | 7) SHEET M201: ADVISORY- SEPARATE PERMITS ARE REQUIRED |
| | FOR COMMERCIAL KITCHEN EXHAUST AND FIRE SUPPRESSION |
| | SYSTEMS, AND WALK-IN COOLERS AND FREEZERS- PLEASE PLACE |
| | A NOTE IN BOLD LETTERS ON THE PLANS. |
| | |
| | 8) M201: SEE FIRE PLAN REVIEW COMMENTS CITING NFPA 101 |
| | FOR PROHIBITION OF THE DUCTS SHOWN IN THE FIRE PUMP |
| | ROOM, AND SECTION 1023.6 FBC-14 BUILDING PROHIBITING |
| | THE DUCT AND DIFFUSER SHOWN IN THE EXIT PASSAGEWAY OF |
| | STAIR #1. |
| | |
| | 9) A722 & M201: IT APPEARS THAT THE LOCATION OF THE |
| | GREASE EXHAUST TERMINATIONS FOR KEF 1 & 2 SHOWN ON THE |
| | PLAN BY THE FPL VAULT WOULD NOT MEET COMPLIANCE WITH |
| | REQUIRED DISCHARGE CLEARANCES AS OUTLINED IN SECTIONS |
| | 506.3.13.2, 506.3.13.3, & 501.3.1 PLEASE PROVIDE |
| | ADDITIONAL INFORMATION INCLUDING CLEARANCE DISTANCE |
| | MEASUREMENTS, DETAILS, AND NOTES. PLEASE NOTE THAT KEF |
| | 1, 2, & 3 AND KSF 1 & 2 WILL BE UNDER SEPARATE PERMIT |
| | WITH THE KITCHEN HOODS, HOWEVER SOME ISSUES MUST BE |
| | ADDRESSED ON THE MAIN PLANS FOR CONSTRUCTION PURPOSES. |
| | REVIEW SECTIONS 506, 507, & 508 AND PROVIDE ALL |
| | APPLICABLE DETAILS AND NOTES ON THE MAIN PLANS. |
| | ADDITIONALLY, PROVIDE AN INSTALLATION DETAIL FOR |
| | INSTALLATION OF KEF-1 WHICH IS LISTED AT 2260 LBS. ON |
| | THE SCHEDULE. |
| | |
| | 10) M201: PROVIDE THE DUCT TRUNK SIZES FOR THE AC |
| | SUPPLY AND RETURN SYSTEMS, THE KITCHEN SUPPLY AND |
| | EXHAUST SYSTEMS, THE RESTROOM AND JANITOR EXHAUST |
| | SYSTEMS, AND THE O/A AIR SYSTEMS. |
| | |
| | 11) M201: DUCT SMOKE DETECTORS ARE REQUIRED IN THE |
| | RETURN AIR SYSTEMS OF FC-1.3, 1.5, 1.6, 1.7, 1.8- |
| | SECTION 606.2.1. |
| | |
| | 12) M201: INDICATE HOW ACCESS FOR MAINTENANCE AND |
| | REPLACEMENT OF UNITS FC-1.2, 1.3, & 1.4, 1.7, & 1.8 |
| | SHOWN ABOVE DRYWALL CEILINGS ON SHEET A301 WILL BE |
| | PROVIDED- SECTION 306.1. PLEASE SHOW ACCESS PANEL |
| | LOCATIONS WHERE REQUIRED AND PROVIDE CONSTRUCTION |
| | DETAILS. |
| | |
| | 13) M201: THE RESTROOMS FAN EF-1.1 IS NOT SHOWN IN THE |
| | SCHEDULE ON M601. PLEASE PROVIDE A SEQUENCE OF |
| | OPERATION FOR THE FAN- SEE TABLE 403.3 |
| | |
| | 14) M201: PROVIDE AN EXHAUST VENTILATION SYSTEM FOR THE |
| | TRASH ROOM 112 AND THE JANITOR'S CLOSET 118 - TABLE 6-4 |
| | ASHRAE 62.1-2010. |
| | |
| | 15) M201: CORRIDORS 109 AND 113 SHALL NOT BE USED AS |
| | RETURN AIR DUCTS FOR AIR BEING SUPPLIED TO ENGINEERING |
| | 110 & DRY STORAGE 124; AND CORRIDOR 133 SHALL NOT |
| | TRANSFER AIR TO CORRIDOR 129- SEE SECTION 601.2. |
| | |
| | 16 ) M201: REFER TO SECTION 304 FBC-14 FUEL GAS AND |
| | PROVIDE COMBUSTION AIR CALCULATIONS FOR ALL GAS-FIRED |
| | COOKING APPLIANCES AND EQUIPMENT. INDICATE HOW THE |
| | COMBUSTION IS BEING SUPPLIED AND SEE SECTION 304.9.3 |
| | FOR COMBUSTION AIR BEING SUPPLIED BY MECHANICAL |
| | SYSTEMS. |
| | |
| | 17) M201: AS PREVIOUSLY NOTED, EXHAUST VENTILATION |
| | CALCULATIONS ARE REQUIRED FOR THE KITCHEN AND |
| | RECIRCULATION OF AIR FROM THOS SPACE IS PROHIBITED PER |
| | TABLE 403.3 FOOTNOTE B. |
| | |
| | 18) M202 & A1.12. : FIRE DAMPERS MISSING AT THESE |
| | LOCATIONS- THE O/A DUCTS PENETRATING THE LAUNDRY ROOM |
| | WALLS, AC DUCTS PENETRATING WALLS AT THE LINEN STORAGE |
| | 228, HOUSEKEEPING 229, STORAGE 223, STORAGE 213. PLEASE |
| | NOTE THERE ARE FIRE DAMPERS AT DUCTS PENETRATING WALLS |
| | ON THE MECHANICAL PLAN THAT ARE NOT SHOWN AS FIRE-RATED |
| | WALLS ON THE LIFE SAFETY PLAN. |
| | |
| | 19) M202: THE LENGTH OF THE DRYER EXHAUST DUCTS ARE |
| | EXCEEDING THE MAXIMUM ALLOWABLE 35 FT. LENGTH PER |
| | SECTION 504.6.4.1, AND CAN ONLY BE APPROVED AS SHOWN IF |
| | THEY CONFORM TO MANUFACTURER'S INSTALLATION |
| | INSTRUCTIONS AS NOTED IN SECTION 504.6.2. PLEASE SUBMIT |
| | MANUFACTURER'S SPECIFICATIONS AND INSTALLATION |
| | INSTRUCTIONS FOR THE DRYERS AND THE IRONER. |
| | A) INDICATE THE TYPE AND GAGE OF DRYER AND IRONER |
| | EXHAUST DUCT, AND PROVIDE SUPPORT AND CONNECTION |
| | DETAILS. B) PROVIDE COMBUSTION AIR CALCULATIONS FOR THE |
| | DRYERS PER SECTION 304 FBC-14 FUEL GAS. C) REVISE SHEET |
| | A401 TO SHOW EXHAUST OUTLET LOCATIONS ON THE ELEVATION |
| | DRAWING. |
| | |
| | 20) M202: EXHAUST VENTILATION IS REQUIRED FOR THE |
| | KITCHEN (WARMING AREA 226) PER TABLE 403.3, AND TABLE |
| | 6-4 ASHRAE 62.1-2010. PLEASE NOTE THAT PER FOOTNOTE B |
| | RECIRCULATION OF AIR FROM THE KITCHEN IS PROHIBITED. |
| | |
| | 21) M202: THERE IS A TRANSFER DUCT RETURNING AIR INTO |
| | CORRIDOR 224, HOWEVER THE CORRIDOR SHALL NOT BE USED AS |
| | A RETURN AIR DUCT PER SECTION 601.2. |
| | |
| | 22) M202: INDICATE HOW ACCESS FOR MAINTENANCE AND |
| | REPLACEMENT OF THE FAN COIL UNITS AND LAUNDRY MAKEUP |
| | AIR FANS WILL BE PROVIDED- SECTION 306.1. SHOW ACCESS |
| | PANEL LOCATIONS WHERE REQUIRED AND PROVIDE CONSTRUCTION |
| | DETAILS. |
| | |
| | 23) M201 & M202: CLARIFY HOW ACCESS TO FD'S AND FSD'S |
| | WILL BE PROVIDED WHERE DAMPERS ARE IN CONCEALED |
| | LOCATIONS ABOVE HARD CEILINGS. SHOW LOCATIONS OF ACCESS |
| | PANELS AND PROVIDE CONSTRUCTION DETAILS. |
| | |
| | 24) M202 & M601: PROVIDE AN EQUIPMENT SCHEDULE FOR |
| | EF-2.1. NOTE: SCHEDULES WILL BE REQUIRED FOR THE |
| | BOOSTER FANS IF THE UNITS ARE APPROVED FOR USE. |
| | |
| | 25) M203, M204, M205- PARKING GARAGES: A) AS PREVIOUSLY |
| | REQUESTED IN THIS REVIEW PROVIDE EXHAUST VENTILATION |
| | CALCULATIONS FOR THE GARAGES PER TABLE 403.3 AND |
| | SECTION 404. B) CLARIFY HOW EXHAUST VENTILATION WILL BE |
| | PROVIDED AND SEQUENCED FOR THE AUTOMOBILE HOISTWAYS AND |
| | PROVIDE A CALCULATION. THE CURRENT PLAN IS NOT |
| | PROVIDING ANY HVAC NOTES OR DETAILS- SEE SECTION 404, |
| | AND SECTION 3004.1 FBC-14 BUILDING. C) PROVIDE MORE |
| | SPECIFIC INFORMATION FOR THE SEQUENCE OF OPERATIONS |
| | SHOWN ON M203- SEE SECTION 404.2 AND INDICATE WHICH FAN |
| | ON EACH FLOOR IS TO RUN AT ALL TIMES AND PROVIDE A |
| | CALCULATION TO VERIFY THE REQUIRED MINIMUM RATE OF .05 |
| | CFM PER SQUARE FOOT WILL BE ACCOMPLISHED. D) SOME OF |
| | THE CIRCULATION FANS (CF-1) APPEAR TO BE LOCATED IN |
| | VEHICLE DRIVE AND PARKING AREAS. INDICATE THE HEIGHT |
| | FROM THE FINISH FLOOR TO THE BOTTOM OF THE FANS PER |
| | SECTION 304.6. |
| | |
| | 26) M203: PLEASE PLACE A NOTE ON THE PLANS INDICATING |
| | THE EMERGENCY GENERATOR WILL BE DONE UNDER SEPARATE |
| | PERMIT. |
| | |
| | 27) M205: AS PREVIOUSLY REQUESTED, SUBMIT |
| | MANUFACTURER'S SPECIFICATIONS FOR THE FLAMEBAR DUCT |
| | WITH SHOP DRAWING APPROVAL SIGNATURE BY THE EOR. A) |
| | PROVIDE A UL TESTED AND APPROVED FIRESTOPPING DETAIL |
| | FOR WALL AND CEILING PENETRATIONS. |
| | |
| | 28) M206, M207, M208: FIRE/SMOKE DAMPERS NOT SHOWN FOR |
| | O/A DUCTS PENETRATING THE CORRIDORS/GUEST ROOM WALLS- |
| | SEE SECTION 513.5.2 AND 607.5.4. |
| | |
| | 29) M206, M207, M208: CLARIFY HOW AIR IS BEING RETURNED |
| | TO EACH FC SHOWN ON THE PLANS- NO RETURN GRILLS ARE |
| | SHOWN ON THE PLANS. |
| | |
| | 30) M206, M207, M208: INDICATE HOW ACCESS FOR |
| | MAINTENANCE AND REPLACEMENT OF THE FAN COIL UNITS WILL |
| | BE PROVIDED ABOVE THE DRYWALL CEILINGS- SECTION 306.1. |
| | SHOW ACCESS PANEL LOCATIONS AND PROVIDE CONSTRUCTION |
| | DETAILS. |
| | |
| | 31) M208A: THE ACCESS HATCHES SHOWN IN THE STAIRWAY |
| | ENCLOSURES ARE NOT PERMITTED PER SECTION 1022.4 FBC-14 |
| | BUILDING. |
| | |
| | 32) M209: PROVIDE EQUIPMENT SCHEDULES FOR FC-13.1 & |
| | 13.2, AND EF-13.1, 13.2, & 13.3. |
| | |
| | 33) M209: PROVIDE AN EXHAUST VENTILATION CALCULATION |
| | FOR THE COMMERCIAL KITCHEN. THE PLAN INDICATES AIR |
| | BEING RECIRCULATED IN THE KITCHEN WHICH IS PROHIBITED |
| | PER TABLE 403.3 FOOTNOTE B. |
| | |
| | 34) M209: A DUCT SMOKE DETECTOR IS REQUIRED IN THE |
| | RETURN AIR SYSTEM OF FC-13.2. PROVIDE A SYMBOL ON THE |
| | PLAN AND PROVIDE DETAILS. |
| | |
| | 35) M209: PROVIDE AN EXHAUST VENTILATION CALCULATION |
| | FOR THE POOL EQUIPMENT ROOM AND COMBUSTION AIR |
| | CALCULATIONS FOR GAS-FIRED POOL EQUIPMENT- SECTION 304 |
| | FBC-14 FUEL GAS. |
| | |
| | 36) M210: PROVIDE EXHAUST VENTILATION AND COMBUSTION |
| | AIR CALCULATIONS FOR THE ROOFTOP BOILER AND PUMP ROOM- |
| | REFER TO SECTION 304 FBC-14 FUEL GAS, AND SUBMIT |
| | MANUFACTURER?S SPECIFICATIONS FOR THE BOILERS AND |
| | BOILER VENTING |
| | |
| | 37) M2.10: REFER TO SECTION 301.15 AND PROVIDE COMPLETE |
| | ENGINEERED DETAILS FOR TIE DOWN OF ALL THE ROOF TOP |
| | MECHANICAL EQUIPMENT INCLUDING BUT NOT LIMITED TO THE |
| | PRESSURIZATION AND SMOKE EXHAUST FANS AND CURBS, THE |
| | OARTU AND CURB, THE CU'S, CU ROOF STANDS, THE MD |
| | WEATHERHOODS, AND EXTERIOR DUCTWORK. PLEASE NOTE THE |
| | DETAILS ON SHEET M703 ARE INCOMPLETE. |
| | |
| | 38) PROVIDE A SEQUENCE OF OPERATION FOR THE OARTU-1. |
| | CLARIFY HOW OUTDOOR AIR WILL BE SUPPLIED TO ALL THE |
| | VARIOUS FAN COIL UNITS IN THE ROOMS AND COMMON AREAS. |
| | WILL THE SYSTEMS BE DIGITALLY CONTROLLED? PLEASE REFER |
| | TO SECTION C403.2.4.4 FBC-14 ENERGY CONSERVATION. |
| | |
| | 39) REFER TO SECTION C403.2.5.1 FBC-14 ENERGY |
| | CONSERVATION- DEMAND CONTROLLED VENTILATION IS REQUIRED |
| | FOR THE RESTAURANT AND THE MEETING ROOMS. INDICATE HOW |
| | COMPLIANCE WILL BE MET AND PROVIDE DETAILS. |
| | |
| | 40) M501: SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE |
| | VRV UNITS WITH ALLOWABLE LENGTH TABLES FOR REFRIGERANT |
| | PIPING. |
| | |
| | 41) M801: AS PREVIOUSLY NOTED, A RATIONAL ANALYSIS AND |
| | CALCULATIONS MUST BE SUBMITTED FOR THE SMOKE CONTROL |
| | SYSTEM. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |