| Date |
Text |
| 2016-06-24 14:38:02 | ****CORRECTIONS**** |
| | SAMANTHA HILL, BUILDING PLANS EXAMINER |
| | 561-805-6724 [email protected] |
| | FBC FLORIDA BUILDING CODE 5TH EDITION |
| | |
| | |
| | |
| | 1. A BFE IS TO BE DETERMINED IN THIS APPROXIMATE A ZONE |
| | FOR SUBSTANTIAL IMPROVEMENTS (ALSO SEE FBC 1612.3.1): |
| | |
| | HTTP://WWW.FEMA.GOV/ENGINEERS-SURVEYORS-AND-ARCHITECTS- |
| | FREQUENTLY-ASKED-QUESTIONS# |
| | |
| | ELEVATION CERTIFICATE, ITEM B9, STATES "NONE." PLEASE |
| | SEE THE FEMA WEBSITE FOR GUIDANCE ON DETERMINING THE |
| | BASE FLOOD ELEVATION WHICH IS NOT DETERMINED BY THE |
| | FLOOD INSURANCE RATE MAP. ALSO SEE FEMA PUBLICATION |
| | 265; PAGE 6 STATES THAT "ALTHOUGH BFES ARE NOT |
| | PROVIDED, THE COMMUNITY IS STILL RESPONSIBLE FOR |
| | ENSURING THAT NEW DEVELOPMENT WITHIN APPROXIMATE ZONE A |
| | AREAS IS CONSTRUCTED USING THETHODS THAT WILL MINIMUM |
| | FLOOD DAMAGES." |
| | |
| | 2. ITEM B4, PLEASE COMPLETE THE MAP/PANEL NUMBER |
| | (SHOULD BE 120229 005). |
| | |
| | 3. ITEM A5 ,LATITUDE/LONGITUDE IS TO BE TO ONE DECIMAL |
| | POINT OR BETTER WHEN USING DEGREES, MINUTES, SECONDS |
| | (FOUR WHEN USING DECIMAL DEGREES, PLEASE SEE |
| | INSTRUCTIONS. |
| | |
| | 4. ITEM A5, INCLUDE THE SOURCE OF LATITUDE/LONGITUDE IN |
| | THE COMMENTS SECTION, SEE INSTRUCTIONS. |
| | |
| | 5. FBC 107, PHOTOGRAPHS OF ALL SIDES OF THE STRUCTURE |
| | AND ALL EQUIPMENT SERVICING THE BUILDING REQUIRED (CRS |
| | PROGRAM REQUIREMENT). |
| | |
| | 6.IT APPEARS THAT, ONCE A BFE IS ESTABLISHED, SECTOIN C |
| | SHOULD BE COMPLETED RATHER THAN SECTION E. |
| | |
| | 7. MECHANICAL EQUIPMENT ELEVATION IS REQUIRED (SEE ITEM |
| | C2E, E4). EQUIPMENT IS TO BE DESCRIBED IN THE |
| | "COMMENTS" SECTION. |
| | |
| | 8. ALL FIELDS ARE TO INCLUDE DATA OR "NA" (GENERAL |
| | COMMENT, SECTION C, E), SEE ELEVATION CERTIFICATE |
| | INSTRUCTIONS. |
| | |
| | 9. PLEASE PROVIDE AN ELEVATION CERTIFICATE FOR CURRY |
| | PARK BATHROOM AT THIS TIME (09060761). THIS IS REQUIRED |
| | FOR THE CITY'S UPCOMING CYCLE VISIT (AKA "FEMA AUDIT") |
| | FOR PROJECTS FINALED 2010 THROUGH 2015. |
| | |
| | PLEASE FEEL FREE TO CONTACT ME IF YOU WISH TO DISCUSS |
| | OPTIONS. |
| | |
| | |