| Date |
Text |
| 2016-10-20 09:09:30 | 2ND ELECTRICAL REVIEW NOTES |
| | REVIEWED FOR COMPLIANCE WITH: |
| | 5TH EDITION FBC 2014 & NFPA 70 2011 (NEC) |
| | |
| | JOB ADDRESS: 111 RUSSLYN DRIVE |
| | DESCRIPTION: CONSTRUCTION OF NEW SFR |
| | MASTER PERMIT: 16061387 |
| | |
| | DUE TO THE LACK OF A NARRATIVE I HAD TO CONDUCT A |
| | COMPLETE REVIEW OF THE SUBMITTED ELECTRICAL PLANS. |
| | BELOW ARE THE DEFICIENCIES NOTED AS A RESULT OF THIS |
| | REVIEW. |
| | |
| | SHEET E0.1 |
| | 1. GENERAL ELECTRICAL NOTES 2: SECTION 107.2.1 OF THE |
| | WPB CITY AMENDMENTS TO THE FBC-B STATES THAT THE |
| | DRAWINGS SHALL INDICATE THE APPLICABLE DESIGN CODE. |
| | (NEC 2011/FBC-RE 2014). |
| | 2. CORRECT LIGHTING ENERGY CONSERVATION BLOCK NOTE |
| | FBC-R404.1 LIGHTING EQUIPMENT (MANDATORY). A MINIMUM OF |
| | 75 PERCENT OF THE LAMPS IN PERMANENTLY INSTALLED |
| | LIGHTING FIXTURES SHALL BE HIGH-EFFICACY LAMPS OR A |
| | MINIMUM OF 75 PERCENT OF THE PERMANENTLY INSTALLED |
| | LIGHTING FIXTURES SHALL CONTAIN ONLY HIGH EFFICACY |
| | LAMPS. |
| | 3. CORRECT CONSTRUCTION ELECTRICAL NOTE 11: ACCORDING |
| | TO NEC 620.24 A LIGHT IN THE ELEVATOR PIT IS REQUIRED. |
| | (AFTER THE REVIEW I NOTICED THAT THERE ISN?T AN |
| | ELEVATOR ON THIS JOB. THIS IS JUST FYI) |
| | SHEET E1.1 |
| | 4. FBC-R REQUIRES THAT THERE BE MECHANICAL VENTILATION |
| | IN POWDER ROOM 102 WHENEVER THE ROOM IS OCCUPIED. |
| | THEREFORE, THE EXHAUST FAN SHALL BE CONNECTED TO THE |
| | LIGHT SWITCH TO COME ON SIMULTANEOUS WITH THE LIGHT. |
| | 5. THE SWITCH FOR THE ATTIC LIGHT SHOULD BE OUTSIDE THE |
| | ATTIC IN A VISIBLE LOCATION AND HAVE A PILOT LIGHT TO |
| | AVOID THE ATTIC LIGHT BEING LEFT ON INADVERTENTLY. |
| | 6. NEC 210.52 HAS SPECIFIC OUTLET PLACEMENT |
| | REQUIREMENTS AND THIS INCLUDES THE MUD ROOM 119. |
| | SHEET E1.2 |
| | 7. TOILET ROOM 205 HAS THE SAME ISSUE ADDRESSED IN |
| | COMMENT 4 ABOVE. |
| | SHEET E3.1 |
| | 8. PLEASE EXPLAIN HOW YOU ARRIVED AT YOUR HVAC LOADS IN |
| | THE CALCS. THE FIGURES DO NOT MATCH THE ENERGY CALCS OR |
| | THE NUMBERS ON THE MECHANICAL PAGE. |
| | SHEET E4.1 |
| | 9. THE RISER DIAGRAM AS SHOWN ON THE PLANS REQUIRES |
| | THAT THE ATS BE SERVICE ENTRANCE RATED AND THUS SPECS |
| | ON THE PROPOSED ATS SHALL ACCOMPANY YOUR RESUBMITTAL. |
| | 10. THE RELATION BETWEEN THE PANEL SCHEDULES AND THE |
| | LOAD CALCS DO NOT MAKE SENSE TO ME. PLEASE |
| | SIMPLIFY/CLARIFY THIS FOR ME. |
| | |
| | WHEN RESUBMITTING, FOR A QUICKER RETURN ON YOUR |
| | RE-SUBMITTAL, PLEASE PROVIDE A RESPONSE LETTER |
| | (NARRATIVE) ADDRESSING EACH ITEM AND THE PAGE NUMBER |
| | WHERE THE CORRECTIONS APPEAR ALONG WITH THE STANDARD |
| | CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PAGES INTO THE SUBMITTAL PACKAGE. MARK VOID |
| | AND LEAVE THE PREVIOUSLY REVIEWED SHEETS FOR |
| | COMPARATIVE REVIEW. CLOUDING THE CHANGES WILL BE |
| | GREATLY APPRECIATED. |
| | |
| | IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO |
| | CONTACT ME DIRECTLY. |
| | |
| | THANK YOU, |
| | MIKE ALBARRAN |
| | ELECTRICAL PLANS EXAMINER |
| | PH: 561-805-6746 |
| | EMAIL: [email protected] |
| | |