| 2016-07-22 15:16:18 | 2ND REVIEW MECHANICAL |
| | PERMIT #16061354 |
| | 7/22/16 |
| | |
| | 1) THE REQUESTED EQUIPMENT SCHEDULES FOR THE EXHAUST |
| | AND MAKEUP AIR FANS HAVE NOT BEEN PLACED ON THE PLANS. |
| | |
| | 2) THE REQUESTED AIR VELOCITY CALCULATION WAS PERFORMED |
| | USING A 9 X 29" DUCT, HOWEVER THE GREASE EXHAUST DUCT |
| | SIZE IS INDICATED TO BE 16 X 16". |
| | |
| | 3) A 2" CLEARANCE FOR THE HOOD TO THE FRONT EXTERIOR |
| | WALL IS SHOWN, HOWEVER AN 18" CLEARANCE TO COMBUSTIBLES |
| | IS REQUIRED. PLEASE SEE SECTION 507.9 AND EXCEPTION, |
| | AND LABEL THE WALL AS EITHER COMBUSTIBLE OR |
| | NON-COMBUSTIBLE AND INDICATE WHAT THE WALL MATERIALS |
| | ARE. |
| | |
| | 4) M-1: IT APPEARS THAT THE ROOF FANS ARE WITHIN 10' TO |
| | THE ROOF EDGE WHICH REQUIRES GUARDS TO BE INSTALLED PER |
| | SECTION 304.11- REVISE THE PLAN ACCORDINGLY. |
| | |
| | 5) COMMENTS #8, 9, 11, & 12 FROM THE 1ST REVIEW STILL |
| | EXIST. I AM REPRINTING THOSE COMMENTS BELOW. PLEASE |
| | SUBMIT CORRECTED PLANS ACCOMPANIED BY A RESPONSE |
| | NARRATIVRE FROM THE DESIGN PROFESSIONAL. |
| | |
| | 1ST REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #16061354 |
| | 6/30/16 |
| | |
| | 8) PROVIDE WIND LOAD ENGINEERING FOR ANCHORING OF THE |
| | FANS AND CURBS TO THE ROOF STRUCTURE- SECTION 301.15. |
| | PLEASE INCLUDE NOA'S FOR THE ROOF FANS WITH A SHOP |
| | DRAWING APPROVAL SIGNATURE BY THE ENGINEER OF RECORD. |
| | |
| | 9) PROVIDE A HOOD HANGING DETAIL. |
| | |
| | 11) REFER TO SECTION 508.1.1 AND SHOW COMPLIANCE FOR |
| | MAKEUP AIR TEMPERATURE: THE TEMPERATURE DIFFERENTIAL |
| | BETWEEN MAKEUP AIR AND THE AIR IN THE CONDITIONED SPACE |
| | SHALL NOT EXCEED 10 DEGREES F (6 DEGREES C) EXCEPT |
| | WHERE THE ADDED HEATING AND COOLING LOADS OF THE MAKEUP |
| | AIR DO NOT EXCEED THE CAPACITY OF THE HVAC SYSTEM. |
| | |
| | 12) PROVIDE AN AIR BALANCE CALCULATION. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |
| | |