| Plan Review Notes For Permit 16061218 |
| Permit Number |
16061218 |
|
| Review Stop |
E |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2016-06-22 16:10:58 | REVIEW 2014 5TH FBC ED. NEC 2011 | | | MARIO VALDES | | | ELECTRICAL PLAN EXAMINER | | | 561-805-6713 | | | [email protected] | | | | | | - INCLUDE TOTAL BUILDING LOAD CALCS AND PANEL SCHEDULES | | | ? THE INFORMATION PROVIDED JUST SHOWS THE DEMANDS FOR | | | THE NEW 100 AMP SUB PANEL. NEC 215.5 | | | | | | - SPECIFY ON RISER DIAGRAM IF THE 150 MAIN PANEL WILL | | | BE FEED THRU LUGS OR AN 100 OCPD WILL BE INSTALLED TO | | | PROTECT SUB PANEL ? MINIMUM AIC AND SCR OF ELECTRICAL | | | APPARATUS SHALL BE ON PANEL SCHEDULES NEC 110.9 & | | | 110.10. CLARIFY AND CORRECT ACCORDINGLY. | | | | | | - PROPER LABELING AND IDENTIFICATION REQUIRED PER NEC | | | 225.37 & 408.4(A)(B) REFLECT TENANT ADDRESS AND ALL | | | CIRCUITS LEGIBABLY MARKED ON ELECTRICAL EQUIPMENT. IN | | | ADDITION ARC-FLASH WARNING AND AVAILABLE FAULT CURRENT | | | PLAQUES SHALL BE INSTALLED BEFORE FINAL INSPECTION. NEC | | | 110.16 & 110.24 | | | | | | - NEC 250.94 BONDING FOR OTHER SYSTEMS. THE | | | INTER-SYSTEM BONDING TERMINAL PRESCRIBED SHALL BE | | | INSTALLED. |
|