| Plan Review Notes For Permit 16061084 |
| Permit Number |
16061084 |
|
| Review Stop |
B |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2016-08-08 11:30:23 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. PROVIDE A SIGNED AND SEALED LETTER FROM THE ENGINEER | | | OF RECORD WHICH ACKNOWLEDGES THE CHANGE IN DESIGN | | | (CABLE GROUPINGS ELIMINATED AT LEVELS 8, 9, 10) AND THE | | | STATEMENT MADE REGARDING SUFFICIENT CAPACITY (REFER TO | | | SHOP REVIEW BY CORDELL VAN NOSTRAND), FAC61G15. | | | | | | 2. CONTRACTOR IS RESPONSIBLE FOR PROVIDING THREE | | | COLLATED COMPLETE SETS. THE FIRST SUBMITTAL WAS FOR | | | POST TENSION DELEGATED ENGINEERING, FLOORS 8-20, AND | | | INCLUDED CALCULATIONS. THE SECOND SUBMITTAL INCLUDES | | | REVISED DRAWINGS MARKED 8-20, BUT ALSO INCLUDES A | | | LETTER WHICH STATES THAT THREE CABLE GROUPINGS | | | (109-111) WERE MISSED ON FLOORS 8-10. THE PREVIOUS | | | SUBMITTAL WAS MARKED "VOID" AND THE CURRENT SUBMITTAL | | | TITLE BLOCK STATES THAT THIS IS FOR FLOORS 8-20, AND | | | CALCS FOR 109-11 INCLUDED. | | | | | | IT APPEARS THAT THE POST TENSION ENGINEERING AND CALCS | | | SHOULD BE REVISED; ONE DRAWING AND CALCS FOR FLOORS | | | 8-10, AND ANOTHER SEPARATE SUBMITTAL WHICH INCLUDES | | | DRAWINGS AND CALCS FOR FLOORS 11-20. PLEASE REVISE | | | ACCORDINGLY OR CONTACT ME TO DISCUSS. | | | |
|